This paper features the modeling and design of a pole placement and output Feedback control technique for the Active Vibration Control (AVC) of a smart flexible cantilever beam for a Single Input Single Output (SISO) case. Measurements and actuation actions done by using patches of piezoelectric layer, it is bonded to the master structure as sensor/actuator at a certain position of the cantilever beam.
The smart structure is modeled based on the concept of piezoelectric theory, Bernoulli -Euler beam theory, using Finite Element Method (FEM) and the state space techniques. The number of modes is reduced using the controllability and observability grammians retaining the first three
dominant vibratory modes, and for the reduced system, a control law is designed using pole placement and output feedback techniques. The analyzed case studies concern the vibration reduction of a cantilever beam with a collocated symmetric piezoelectric sensor/actuator pair bonded on the surface. The transverse displacement time history, for an initial displacement field at the free end, is evaluated. Results are compared with other works, and the control design shows that Pole Placement method is an effective method for vibration suppression of the beam and settling time reduction.
The main aim of this research paper is investigating the effectiveness and validity of Meso-Scale Approach (MSA) as a modern technique for the modeling of plain concrete beams. Simply supported plain concrete beam was subjected to two-point loading to detect the response in flexural. Experimentally, a concrete mix was designed and prepared to produce three similar standard concrete prisms for flexural testing. The coarse aggregate used in this mix was crushed aggregate. Numerical Finite Element Analysis (FEA) was conducted on the same concrete beam using the meso-scale modeling. The numerical model was constructed to be a bi-phasic material consisting of cement mortar and coarse aggregate. The interface between the two c
... Show MoreThis research is a continued efforts for a project on the fire tube boiler control for Al Rasheed edible oil factory. The aim is to enhance the control system with new integral control one. A functional blocks diagram (FBD) was built and simulated. With Schneider smart relays, FBD differs than ladder logic programming in which the PID option is active. An extensive work was done to understand the operation sequence, emergency shutdown, and faults causing the trips. A control program was designed to control logical sequence of operation. Furthermore temperature is controlled via cascade control with fuel and air controllers. The temperature controller output is send as remote set point to the fuel controller in a serial cascade manner. The f
... Show MoreModern automation robotics have replaced many human workers in industrial factories around the globe. The robotic arms are used for several manufacturing applications, and their responses required optimal control. In this paper, a robust approach of optimal position control for a DC motor in the robotic arm system is proposed. The general component of the automation system is first introduced. The mathematical model and the corresponding transfer functions of a DC motor in the robotic arm system are presented. The investigations of using DC motor in the robotic arm system without controller lead to poor system performance. Therefore, the analysis and design of a Proportional plus Integration plus Divertive (PID) controller is illustrated.
... Show MoreBackground: Preoperative radiographical assessment of the maxillofacial lesions is of a great importance in guiding the surgeon during surgical procedure in reducing post-operative complications. This study highlighted the application of CBCT scan in the assessment of maxillofacial cystic and cystic like lesions as a part of advanced radiology Materials and methods: A total of 20 patients (15 males and 5 females) participated in this prospective study. CBCT scan (Kodak 9500 CBCT) with (DICOM) software utilized to perform scanning to all patients in order to assess lesion extension, morphological features and it’s relation to the adjacent vital structures. Results: In this study, the total cystic and cystic like lesions involving the
... Show MoreA twisted-fin array as an innovative structure for intensifying the charging response of a phase-change material (PCM) within a shell-and-tube storage system is introduced in this work. A three-dimensional model describing the thermal management with charging phase change process in PCM was developed and numerically analyzed by the enthalpy-porosity method using commercial CFD software. Efficacy of the proposed structure of fins for performing better heat communication between the active heating surface and the adjacent layers of PCM was verified via comparing with conventional longitudinal fins within the same design limitations of fin material and volume usage. Optimization of the fin geometric parameters including the pitch, numb
... Show MoreThe Feedback Concept has been spread as an organized trend for scientific research since it has a significant importance for human behavior and how it has been directed and controlled by the individual, feedback has numerous definitions but the simplest definition is; feedback is the information received by the individual from the output of his behavior, In addition to the mutual relationship between the individual and the stimulation that provide him with the basic information by the biological control of his behavior, Since feedback cannot be accomplished without receiving information from the inner and outer environment, the biological and physiological information become the ma
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreIn recent days, the escalating need to seamlessly transfer data traffic without discontinuities across the Internet network has exerted immense pressure on the capacity of these networks. Consequently, this surge in demand has resulted in the disruption of traffic flow continuity. Despite the emergence of intelligent networking technologies such as software-defined networking, network cloudification, and network function virtualization, they still need to improve their performance. Our proposal provides a novel solution to tackle traffic flow continuity by controlling the selected packet header bits (Differentiated Services Code Point (DSCP)) that govern the traffic flow priority. By setting the DSCP bits, we can determine the appropriate p
... Show MoreIn the last two decades, arid and semi-arid regions of China suffered rapid changes in the Land Use/Cover Change (LUCC) due to increasing demand on food, resulting from growing population. In the process of this study, we established the land use/cover classification in addition to remote sensing characteristics. This was done by analysis of the dynamics of (LUCC) in Zhengzhou area for the period 1988-2006. Interpretation of a laminar extraction technique was implied in the identification of typical attributes of land use/cover types. A prominent result of the study indicates a gradual development in urbanization giving a gradual reduction in crop field area, due to the progressive economy in Zhengzhou. The results also reflect degradati
... Show More