Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM) as analytical hierarchy process (AHP) have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES) has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management & Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is

... Show More
View Publication
Scopus (23)
Crossref (30)
Scopus Clarivate Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Journal Of Engineering
Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)
...Show More Authors

The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill  the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe

... Show More
View Publication Preview PDF
Publication Date
Thu May 14 2026
Journal Name
Technical University Of Munich
Conditions for Applying Public Private Partnership PPP in Iraq Infrastructure Projects Successfully
...Show More Authors

Public private partnership PPP is a method to procure public projects in order to achieve additional value for money in terms of efficiency and quality of services. This thesis studies the concepts of PPP, advantages and disadvantages of PPP. In addition, current Iraq infrastructure projects situations and needs, as well as, some aspects relating to the Iraq’s construction market, legal and contract systems were discussed. A financial model was carried out and applied to a real-life case study project. Finally, a survey targeted researchers; public and private- sectors were applied.

View Publication
Publication Date
Fri Dec 31 2021
Journal Name
Iraqi Geological Journal
Construction of Comprehensive Geological Model for an Iraqi Oil Reservoir
...Show More Authors

The paper generates a geological model of a giant Middle East oil reservoir, the model constructed based on the field data of 161 wells. The main aim of the paper was to recognize the value of the reservoir to investigate the feasibility of working on the reservoir modeling prior to the final decision of the investment for further development of this oilfield. Well log, deviation survey, 2D/3D interpreted seismic structural maps, facies, and core test were utilized to construct the developed geological model based on comprehensive interpretation and correlation processes using the PETREL platform. The geological model mainly aims to estimate stock-tank oil initially in place of the reservoir. In addition, three scenarios were applie

... Show More
Preview PDF
Scopus (9)
Crossref (3)
Scopus Crossref
Publication Date
Fri May 15 2015
Journal Name
Euphrates Journal Of Agricultural Science
Performance Evaluation of field and genetic for genotype selection from Tomato Lycopersicon esculeuntum Mill.
...Show More Authors

The study was conducted at the fields of the Department of Horticulture and Landscape Gardening,College of Agriculture, University of Baghdad during the growing seasons of 2013- 2014 .forPerformance of Evaluation Vegetative growth and yield traits and estimate some important geneticparameter on seven selected breed of tomato which (S1-S7 ) Pure line. the results found significantdifferences between breeds in all study trails except clusters flowering number .S1 significantly plantlength which reached 227.3 .Also S1,S2 and S4 were significantly increased the number fruit for plant,Fruit weight Increased in S3 ,S6 and plant yield. Increased in S1, S4 ,S5. Genetic variation valueswere low in Floral clusters , TSS and fruit firmest and medium i

... Show More
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Reducing Maintenance Costs for Government Projects in Iraq Using Performance Indicators
...Show More Authors

Institutions and companies are looking to reduce spending on buildings and services according to scientific methods, provided they reach the same purpose but at a lower cost. On this basis, this paper proposes a model to measure and reduce maintenance costs in one of the public sector institutions in Iraq by using performance indicators that fit the nature of the work of this institution and the available data. The paper relied on studying the nature of the institution’s work in the maintenance field and looking at the type of data available to know the type and number of appropriate indicators to create the model. Maintenance data were collected for the previous six years by reviewing the maintenance and financial dep

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Aug 31 2017
Journal Name
Journal Of Engineering
Optimal Indicators to Select the Engineering Consultancy Office For Higher Education Institutions in Iraq
...Show More Authors

Expansion the engineering consultancy offices in the universities of Iraq, about (14) offices, leading to increas the competition between them, especially after the great trends of Iraqi government agencies to use the academic experiences and their efficiencies in general, due to non-existence of the engineering qualification in the government institutions to do the engineering designs ,supervision of projects and other engineering works which are practicing by the engineering consultancy offices in order to get the best performance of the work.Within this serious competition, needing a specific approach to enable government agencies to choose the optimal and alternative consultancy office to meet specific project and not rely on cronyis

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Tue Mar 03 2026
Journal Name
International Journal Of Engineering Pedagogy (ijep)
Design of a Hybrid AI-Driven Engineering Model for Energy-Efficient and Sustainable Educational Systems
...Show More Authors

A substantial percentage of the world’s energy consumption (almost 40%) and carbon dioxide (CO2) emissions (around 37%) come from the construction industry, especially schools. This work presents a new hybrid artificial intelligence (AI) engineering model that aims to maximize energy performance on campuses in a holistic way. Modules for data-driven forecasting, metaheuristic optimization, and real-time adaptive control are all part of the concept. A thorough energy simulation of a university campus building is used in conjunction with the AI model to assess its performance through a co-simulation framework. Findings show that yearly peak electricity demand may be reduced by 18.7% and total site energy consumption by 22.4% when co

... Show More
View Publication
Scopus Crossref
Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
New cost control techniques in mega construction projects
...Show More Authors

View Publication
Scopus (5)
Crossref (4)