Preferred Language
Articles
/
joe-200
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM) as analytical hierarchy process (AHP) have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES) has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Aug 12 2017
Journal Name
Journal Of Engineering
Regulations Enforcement Mechanisms for Sustainable Housing Projects
...Show More Authors


 

View Publication Preview PDF
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)
...Show More Authors

This paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Oct 01 2009
Journal Name
2009 Ieee Symposium On Industrial Electronics & Applications
Assessing combinatorial interaction strategy for reverse engineering of combinational circuits
...Show More Authors

View Publication
Scopus (9)
Crossref (8)
Scopus Crossref
Publication Date
Thu Jan 01 2015
Journal Name
Journal Of Engineering
Performance Improvement of the Implementation of Concrete Structures in the Construction Sector In Iraq Using The Modern Management Technique “Six Sigma”
...Show More Authors

The reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual

... Show More
View Publication
Publication Date
Thu Feb 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Post-evaluation of the strategic projects of the Directorate of Public Municipalities - Case study for the period (2004-2015
...Show More Authors

The research aims at conducting a follow-up evaluation of a number of strategic projects implemented by the Directorate of Public Municipalities, one of the Ministry of Construction, Housing and Municipalities and Public Works. The sample included (35) varied strategic projects implemented in most Iraqi governorates. Buildings, municipal buildings, minarets, massacres, multi-story parking, paving and rehabilitation of streets and residential neighborhoods. The difference between the actual and planned times and costs of these projects was then measured and analyzed. These projects were used as a tool for collecting data and information. The questionnaire included four axes, each representing one of the parties to the project, whi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluation of projects during the trial operation period in accordance with the cost, quality and time - applied research in the Directorate-General for the distribution
...Show More Authors

Research includes evaluation of projects implemented and which entered into trial operation period in accordance with the evaluation criteria and of (cost, quality and time) to determine the size deviations gap for the sample of projects during the years of assessment (2011-2012-2013-2014) of each of the three evaluation criteria, and then followed by a calculation the size of the overall gap to the problem based on the research problem to determine deviations from the specific implementation of each project by answering several questions to answer turns out the reasons for these deviations occur.

The importance of research Focus on the evaluation of received projects from contractors executing the projec

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue May 16 2023
Journal Name
Political Sciences Journal
Institutional Reality Construction: Principles of its Construction and Functions of Language in its Production; Diplomacy as a Model
...Show More Authors

This study aims to answer a significant problem of social sciences and philosophy: How do we construct an institutional reality such as diplomacy with an objective recognizable existence? The study assumes that the ability to build institutional reality is based on our biological capacity, as it takes different forms in all the institutions we construct. The study takes the theory of the American philosopher John Searle as an approach to examining the assumption. The study sums up important findings; cultures, although they share the biological capacity on which they produce institutional realities, differ in the form of the value standards on which the institutional realities are based. The study recommends the need of Arab social resea

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 27 2024
Journal Name
Journal Of Economics And Administrative Sciences
An Integrated Approach to Constraints Theory and Fuzzy Analytical Hierarchy Process (FAHP) in Construction Projects (Case Study)
...Show More Authors

The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim

... Show More
Preview PDF
Crossref
Publication Date
Sat Feb 01 2020
Journal Name
Journal Of Economics And Administrative Sciences
Re-engineering management processes and its impact on the strategic decision-making process Field study on the College of Education / University of Mustansiriya / Iraq
...Show More Authors

The aim of the research is to identify both the re-engineering of management processes and the strategic decision-making process in the research community and determine the nature of the correlation between the two variables and know the relationship between them to achieve the research goal. The researcher used a descriptive and analytical method. The research community consists of a group of professors and staff of the College of Education affiliated to the University of Mustansiriya in Baghdad, which their number were (45),  the researcher has distributed the forms to all members of the sample,  only (3) forms were excluded for invalidity and thus the number of forms approved in the analysis were (42) forms. The rese

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Sep 01 2004
Journal Name
Faculty Of Engineering/mustansiriyah University
Studying and Analyzing Actual Safety Situation of Construction Factories in Iraq
...Show More Authors

Safety programmes are considered one of the means to protect workers from different accidents and injuries and also to protect all assets including machines equipment and various materials. In spite of world state interests in occupational safety, this subject didn't get the required attention by senior staff of management at most of our country construction factories and the application of safety programmes still limited and in active. In order to a achieve the goal of the study, scientific method has been pursued to obtain the necessary information related to this study through tours to related companies and their construction factories and review literature that deal with occupational safety subject and their programmes and cost, in a

... Show More