In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreA low speed open circuit wind tunnel has been designed, manufactured and constructed at theMechanical Engineering Department at Baghdad University - College of Engineering. The work is one ofthe pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes thefirst part of the work; that is the design calculations, simulation and construction. It will be followed by asecond part that describes testing and calibration of the tunnel. The proposed wind tunnel has a testsection with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flowdisturbances in the test sec
... Show MoreHorizontal wells have revolutionized hydrocarbon production by enhancing recovery efficiency and reducing environmental impact. This paper presents an enhanced Black Oil Model simulator, written in Visual Basic, for three-dimensional two-phase (oil and water) flow through porous media. Unlike most existing tools, this simulator is customized for horizontal well modeling and calibrated using extensive historical data from the South Rumaila Oilfield, Iraq. The simulator first achieves a strong match with historical pressure data (1954–2004) using vertical wells, with an average deviation of less than 5% from observed pressures, and is then applied to forecast the performance of hypothetical horizontal wells (2008–2011). The result
... Show MoreThis research set to indicate the role of the opportunity cost in the overall economic development (human and social development) by selecting the most appropriate alternative for the growth of the country in exchange for sacrificing profit limits to achieve this growth and development of the country, especially in the present circumstances of the country and after studying the reality of the economic case for him, as the problem lies with don't selecting the best alternative that enhances the gross domestic product, which extends to promote overall economic development and revive the industrial and agricultural sectors, productivity is more like Impotent, versus sacrifice alternative consumption may bring more financially lucrative than
... Show More