In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
The present study dealt with the removal of methylene blue from wastewater by using peanut hulls (PNH) as adsorbent. Two modes of operation were used in the present work, batch mode and inverse fluidized bed mode. In batch experiment, the effect of peanut hulls doses 2, 4, 8, 12 and 16 g, with constant initial pH =5.6, concentration 20 mg/L and particle size 2-3.35 mm were studied. The results showed that the percent removal of methylene blue increased with the increase of peanut hulls dose. Batch kinetics experiments showed that equilibrium time was about 3 hours, isotherm models (Langmuir and Freundlich) were used to correlate these results. The results showed that the (Freundlich) model gave the best fitting for adsorption capacity. D
... Show MoreThe research aims to identify the importance of using the style of the cost on the basis of activity -oriented in time TDABC and its role in determining the cost of products more equitably and thus its impact on the policy of allocation of resources through the reverse of the changes that occur on an ongoing basis in the specification of the products and thus the change in the nature and type of operations . The research was conducted at the General Company for Textile Industries Wasit / knitting socks factory was based on research into the hypothesis main of that ( possible to calculate the cost of activities that cause the production through the time it takes to run these activities can then be re- distributed product cost
... Show MoreThe study seeks the relationship between the mathematical-procedural Knowledge and the logical-mathematical intelligence among students at the third stage in mathematics department. To this end, three questions were arisen: what is the level of mathematical-procedural Knowledge among the third stage students in mathematics department regarding their gender? Do male or female students have more logical-mathematical intelligence and are there significant differences base on their gender? What kind of correlation is between the level of mathematical-procedural Knowledge and the logical-mathematical intelligence of male and female students in the third stage in the mathematics department? A sample of (75) male and female students at the thir
... Show MoreSynthesis of PEG 200-Di- Acetate ant Its Influence on the Viscosity of PEG 4000 in Different Organic Solvents
A new approach for baud time (or baud rate) estimation of a random binary signal is presented. This approach utilizes the spectrum of the signal after nonlinear processing in a way that the estimation error can be reduced by simply increasing the number of the processed samples instead of increasing the sampling rate. The spectrum of the new signal is shown to give an accurate estimate about the baud time when there is no apriory information or any restricting preassumptions. The performance of the estimator for random binary square waves perturbed by white Gaussian noise and ISI is evaluated and compared with that of the conventional estimator of the zero crossing detector.
In this work, we construct projectively distinct (k,3)-arcs in the projective plane PG(2,9) by applying a geometrical method. The cubic curves have been been constructed by using the general equation of the cubic. We found that there are complete (13,3)-arcs, complete (15,3)-arcs and we found that the only (16,3)-arcs lead to maximum completeness