In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
The current study involves placing 135 boreholes drilled to a depth of 10 m below the existing ground level. Three standard penetration tests (SPT) are performed at depths of 1.5, 6, and 9.5 m for each borehole. To produce thematic maps with coordinates and depths for the bearing capacity variation of the soil, a numerical analysis was conducted using MATLAB software. Despite several-order interpolation polynomials being used to estimate the bearing capacity of soil, the first-order polynomial was the best among the other trials due to its simplicity and fast calculations. Additionally, the root mean squared error (RMSE) was almost the same for the all of the tried models. The results of the study can be summarized by the production
... Show MoreIn this paper we use Bernstein polynomials for deriving the modified Simpson's 3/8 , and the composite modified Simpson's 3/8 to solve one dimensional linear Volterra integral equations of the second kind , and we find that the solution computed by this procedure is very close to exact solution.
Reciprocal Teaching is an interactive method that is used to improve reading comprehension. Using this teaching strategy, teachers and students take turns leading discussions regarding sections of text using the four strategies: predicting, questioning, clarifying and summarizing. This study is an attempt to investigate the effect of using reciprocal teaching on improving female college students' achievement in reading comprehension. To fulfill the aim of the study, the researcher has adopted two null hypotheses: first, there is no significant difference between the achievement of students' who practice the reciprocal teaching technique and that of students who do not practice it. Second, there is no statistically significant difference
... Show MoreProduction logging is used to diagnose well production problems by evaluating the flow profile, entries of unwanted fluids and downhole flow regimes. Evaluating wells production performance can be easily induce from production logs through interpretation of production log data to provide velocity profile and contribution of each zone on total production. Production logging results supply information for reservoir modeling, provide data to optimize the productivity of existing wells and plan drilling and completion strategies for future wells. Production logging was carried out in a production oil well from Mishrif formation of West Qurna field, with the objective to determine the flow profile and fluid contributions from the perforations af
... Show MoreBackground: A review of articles of method in treating compound phalangeal fractures by using mini-external fixator, elaborating the anatomy, mechanics, modalities of treatment, and complications of these types of fractures. Also, it compares between different studies regarding the functional results and final outcome. External fixation of phalangeal fractures is a good method for osteo synthesis in certain situations. The simplicity of the surgical procedure and the minimal disruption of the normal bone architecture also make it appealing. Objectives: Evaluating the functional results of the use of mini-external fixator for the treatment of compound fractures of phalangeal bones of the hand. Method: Our study consists of 15 patients, 12 we
... Show MoreThe aim of this work was to estimate the concentrations of natural and artificial nuclides in some fertilized and unfertilized plant samples. These samples were collected and prepared in a petri dish for the measurements using gamma spectroscopy. The average values of 238U, 232Th, 40K, and 137Cs for the unfertilized plant samples were (11.964 ± 3.226, 8.273 ± 2.639, 402.436 ± 18.099, and 2.761 ± 1.613) respectively, and for the fertilized plant samples were (30.434 ± 5.282, 22.584 ± 4.620, 711.332 ± 25.806, and 6.986 ± 2.542) respectively. The average values of radiological hazard indices, Raeq, D, D for 137Cs, (AEDE)in, (AEDE)out, Iγ, Hin, and Hout for the unfertilized plant samples were (54.782 ± 7.216, 27.306, 0.469, 0.
... Show MoreBackground: Determination of local bone mineral density (BMD) immediately after implant insertion play an important role in implant success rate, may offer comprehensive description of the bone, and give enough information to the surgeon prior to implant insertion and at follow up status. The aim of the present study is to evaluate the changes of local bone density in the dental implant recipient sites by using computerized tomography. Material and method: The sample consisted of (20) dental implants recipient sites, bone density assessment was done twice, immediately after implants insertion and after six months. Results: The mean HU of the bone around the implant insertion site, immediately after implant placement was 552.28 HU, and inc
... Show MoreThis paper deals with the modeling of a preventive maintenance strategy applied to a single-unit system subject to random failures.
According to this policy, the system is subjected to imperfect periodic preventive maintenance restoring it to ‘as good as new’ with probability
p and leaving it at state ‘as bad as old’ with probability q. Imperfect repairs are performed following failures occurring between consecutive
preventive maintenance actions, i.e the times between failures follow a decreasing quasi-renewal process with parameter a. Considering the
average durations of the preventive and corrective maintenance actions a
... Show More