Preferred Language
Articles
/
joe-1957
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Aug 31 2014
Journal Name
Arabian Journal Of Geosciences
Petroleum system modeling and risk assessments of Ad’daimah oil field: a case study from Mesan Governorate, south Iraq
...Show More Authors

View Publication
Scopus (11)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Sun Apr 02 2017
Journal Name
Journal Of Educational And Psychological Researches
Impact of modeling strategy in deductive thinking and the attitvde towards mathematics among students in the highschool stage
...Show More Authors

    The current research aims to identify the Impact of  strategy of modeling in the of deductive thinking and the attitvde towards mathematics among students in the high school stage

 through check the following hypotheses:       

1.There is no difference statistically significant at the level (0.05) between the scores  mean of the experimental group students who have studied according to the modeling strategy and scores of control group students who have studied according to ordinary method in deductive thinking. 

2.

... Show More
View Publication Preview PDF
Publication Date
Tue Jan 01 2019
Journal Name
Desalination And Water Treatment
Xylenol orange removal from aqueous solution by natural bauxite (BXT) and BXT-HDTMA: kinetic, thermodynamic and isotherm modeling
...Show More Authors

Preview PDF
Scopus (14)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Wed May 18 2016
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
THE APPLICITIONS OF JUST IN TIME PRODUCTION AND ITS ROLE ON THE COMPONENTS OF MARKETING INFORMATION SYSTEM: AN APPLIED STUDY IN ALMANSOUR OUR STATE COMPANY FOR CONSTRUCTIONAL CONTRACTS.: THE APPLICITIONS OF JUST IN TIME PRODUCTION AND ITS ROLE ON THE COMPONENTS OF MARKETING INFORMATION SYSTEM: AN APPLIED STUDY IN ALMANSOUR OUR STATE COMPANY FOR CONSTRUCTIONAL CONTRACTS.
...Show More Authors

Live the present companies in a competitive business environment going on and try to achieve excellence in their industry through the marketing of their products and achieve greater market share as possible to ensure its continued existence, and perhaps the concept of time production, which confirms, in essence, on the need to reduce inventory to a minimum in the production process as well as the concept of the marketing information system which asserts, in essence, to document all the events that are related to the marketing of the product provided by the production process, together constitute the subject deserves research and investigation as they have raised well-known in the fields of production management and marketing management.

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of TD-ABC approach in decreasing of cost per unit: Applied study in the General company of Hydraulic Industries \ Plastic Factory
...Show More Authors

The aim of the research is to use this technique and to determine the effect of this method in reduce cost per unit of the company. The traditional method used in the company the research sample to determine the indirect costs, the definition of the concepts and characteristics of the method of cost-based activity and the cost method based on time-driven activity and justifications applied to companies.   In order to achieve the research objectives, the main hypotheses were formulated. That was represented: (The applied of (TDABC) Time driven activity based costing method in reducing indirect costs, leads reduce cost per unit than the use of the traditional method of allocating indirect costs in the research sample company).&nb

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 14 2024
Journal Name
مجلة دراسات وبحوث التربية الرياضية
Construction and Validation of a Cognitive Engagement Scale and Its Relationship with Ball Movement Sequence Performance in Rhythmic Gymnastics
...Show More Authors

The research aims to: build and record a measure of cognitive participation among second-year female students at the College of Physical Education and Sports Sciences, University of Baghdad. The researchers used the descriptive approach in the survey style for the research sample. The sample was selected from female students and divided into: (10) female students for the survey sample, and (80) female students for the construction and codification sample. The data were statistically analyzed by the researchers using SPSS, the T-test for independent and correlated samples, Pearson's simple correlation coefficient, Cronbach's alpha, Chi-square, and Spearman-Brown. They were recruited for the samples. The study concluded that constr

... Show More
Preview PDF
Publication Date
Sat Apr 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Risk Analysis of Projects Accordance with the Professional Project Management System: A case- Study Mansur Construction Contracting Company here
...Show More Authors

The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Sep 01 2022
Journal Name
Iaes International Journal Of Robotics And Automation
Implementation of a complex fractional order proportional-integral-derivative controller for a first order plus dead time system
...Show More Authors

This paper presents the implementation of a complex fractional order proportional integral derivative (CPID) and a real fractional order PID (RPID) controllers. The analysis and design of both controllers were carried out in a previous work done by the author, where the design specifications were classified into easy (case 1) and hard (case 2) design specifications. The main contribution of this paper is combining CRONE approximation and linear phase CRONE approximation to implement the CPID controller. The designed controllers-RPID and CPID-are implemented to control flowing water with low pressure circuit, which is a first order plus dead time system. Simulation results demonstrate that while the implemented RPID controller fails to stabi

... Show More
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Physics: Conference Series
Experimental Analysis for the Influence of Ignition Time on Combustion Characteristics of a Free Piston Engine Linear Generator
...Show More Authors
Abstract<p>Free Piston Engine Linear Generator (FPELG) is a modern engine and promising power generation engine. It has many advantages compared to conventional engines such as less friction, few numbers of parts, and high thermal efficiency. The cycle-to-cycle variation one of the big challenges of the FPELG because it is influence on the stability and output power of the engine. Therefore, in this study, the effect of ignition time on combustion characteristics is investigated. The single-cylinder FPELG with spark ignition (SI) combustion type by using compressed natural gas (CNG) fuel type was set to run. LabVIEW is used to run the engine and control of input parameters. All experimental data</p> ... Show More
View Publication Preview PDF
Scopus (6)
Crossref (3)
Scopus Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Robust Two-Step Estimation and Approximation Local Polynomial Kernel For Time-Varying Coefficient Model With Balance Longitudinal Data
...Show More Authors

      In this research, the nonparametric technique has been presented to estimate the time-varying coefficients functions for the longitudinal balanced data that characterized by observations obtained through (n) from the independent subjects, each one of them is measured repeatedly by group of  specific time points (m). Although the measurements are independent among the different subjects; they are mostly connected within each subject and the applied techniques is the Local Linear kernel LLPK technique. To avoid the problems of dimensionality, and thick computation, the two-steps method has been used to estimate the coefficients functions by using the two former technique. Since, the two-

... Show More
View Publication Preview PDF
Crossref