In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
This research is under the title (Construction Grammar in the Kurdish language), which in turn is an attempt to present grammar and Kurdish grammar from the perspective of the constructive of Cognitive Linguistics. The construction as a term in the Kurdish language base was not recent, as it was discussed in other schools in a specific way from the perspective of language schools, but the subject of construction with a perceived background includes specific purposes, which is how to build the linguistic base by being a template accessible to its speakers, and in the cases of speaking it, not to mention how it is perceived and the level it is familiar with by its speakers. The nominal purpose of the Construction is Unification of form-mea
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend
... Show MoreThis article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a
... Show MoreExperiments were conducted to study the behavior of the solid particles (proppant) inside the hydraulic fracture during the formation stimulation, and study the effect of the proppant concentration on the hydraulic fracturing process, which lead to bridge and screen-out conditions inside the fractures across the fracture width that restricts fracturing fluid to flow into the hydraulic fracture. The research also studies the effect of the ratio between the fracture size and the average particles diameter “proppant", on fracture bridging. In this study two ratios were considered β= 2 and 3 ,where β=Dt / Dp where: Dt= hydraulic fracture size (width) and Dp=Average particles diameter.
This work pr
... Show MoreEleven hymenopterous species: two braconids, seven eulophids and two pteromalids
parasitized the larvae of Phytomyza horticola Goureau. The activity of the parasites began at
the end of April and evidently increased during May. The female of the parasites fed and
parasitized mostly on the second and third larval instars of P. horticola . Diglyphus iseae
Walker and Cirrospilus vittatus Walker were dominant larval parasites. Chrysocharis
pentheus Walker and Pediobius acantha Walker were main pupal parasites.
This article aims to determine the time-dependent heat coefficient together with the temperature solution for a type of semi-linear time-fractional inverse source problem by applying a method based on the finite difference scheme and Tikhonov regularization. An unconditionally stable implicit finite difference scheme is used as a direct (forward) solver. While by the MATLAB routine lsqnonlin from the optimization toolbox, the inverse problem is reformulated as nonlinear least square minimization and solved efficiently. Since the problem is generally incorrect or ill-posed that means any error inclusion in the input data will produce a large error in the output data. Therefore, the Tikhonov regularization technique is applie
... Show More