An integrated GIS-VBA (Geographical Information System – Visual Basic for Application), model is developed for selecting an optimum water harvesting dam location among an available locations in a watershed. The proposed model allows quick and precise estimation of an adopted weighted objective function for each selected location. In addition to that for each location, a different dam height is used as a nominee for optimum selection. The VBA model includes an optimization model with a weighted objective function that includes beneficiary items (positive) , such as the available storage , the dam height allowed by the site as an indicator for the potential of hydroelectric power generation , the rainfall rate as a source of water . In addition to that (negative) penalty items are also included such as surface area, evaporation rate.
In order to obtain precise results, an Artificial Neural Network (ANN) model was formulated and applied to correct the elevations of the Digital Elevation Model (DEM) map using real and DEM elevations of available selected control points.
The application of the model is tested using a case study of a catchment area in Diyala and Wasit Governorate. The DEM file was corrected for elevations, using the developed ANN model .This model is found using SPSS – software. The correlation coefficient of this model is found to be (0.97) , with 3- hidden nodes and hyperbolic tangent and identity activation functions. Different weight scenarios for the objective function of the optimization model were adopted. The results indicate that different optimum dam locations can be observed for each case. Results indicate also that sometimes equal objective can be obtained but each has different reservoir volume and surface area.
The main objective of resources management is to supply and support the site operation with necessary resources in a way to achieve the required timing in handing over the work as well as to achieve the cost-realism within the budget estimated. The research aims to know the advantage of using GIS in management of resources as one of the new tools that keep pace with the evolution in various countries around the world also collect the vast amount of spatial data resources in one environment easily to handled and accessed quickly and this help to make the right decision regarding management of resources in various construction projects. The process of using GIS in the management and identification of resources is of extreme importance in t
... Show MoreMulti-spectral satellite images of the Landsat satellite by the tow sensitive Thematic Mapper (TM) and Thematic Mapper Enhancement (ETM+), which covered the study area located south east of Iraq. In this research; used the sixth thermal spectral band (Thermal Band) for study the water cover in the AlRazzaza Lake located within the province of Karbala. We intended to study the cover a case of the study area, used satellite images showing the status of region during the period from 1990 to 2001 and 2007. From this study we conclude that cover the water of the study area change in sequence case to decrease during these years.
Multi-spectral satellite images of the Landsat satellite by the tow sensitive Thematic Mapper (TM) and Thematic Mapper Enhancement (ETM+), which covered the study area located south east of Iraq. In this research; used the sixth thermal spectral band (Thermal Band) for study the water cover in the Al-Razzaza Lake located within the province of Karbala. We intended to study the cover a case of the study area, used satellite images showing the status of region during the period from 1990 to 2001 and 2007. From this study we conclude that cover the water of the study area change in sequence case to decrease during these years.
The research aims to indicate the relationship between lean production tools included seven {constant improvement , and Just in time (JIT), and the production smoothing , and quality at the source, and standardized work, Visual management, and activities 5S } and Mass Customization strategy for the model (Pine & Gilomer, 1997) {collaborative, adaptive, cosmetic, transparent}, as well as providing a conceptual framework and applied for variables search to clarify how they will choose a Mass Customization strategy through the lean production tools, , and recognize the reality of the practices of Iraqi industries in such a field. Moreover, aims to highlight the positive aspects that accrue to companies a
... Show MoreCarbon-fiber-reinforced polymer (CFRP) is widely acknowledged as a leading advanced material structure, offering superior properties compared to traditional materials, and has found diverse applications in several industrial sectors, such as that of automobiles, aircrafts, and power plants. However, the production of CFRP composites is prone to fabrication problems, leading to structural defects arising from cycling and aging processes. Identifying these defects at an early stage is crucial to prevent service issues that could result in catastrophic failures. Hence, routine inspection and maintenance are crucial to prevent system collapse. To achieve this objective, conventional nondestructive testing (NDT) methods are utilized to i
... Show MoreThis study focuses on improving the safety of embankment dams by considering the effects of vibration due to powerhouse operation on the dam body. The study contains two main parts. In the first part, ANSYS-CFX is used to create the three-dimensional (3D) Finite Volume (FV) model of one vertical Francis turbine unit. The 3D model is run by considering various reservoir conditions and the dimensions of units. The Re-Normalization Group (RNG) k-ε turbulence model is employed, and the physical properties of water and the flow characteristics are defined in the turbine model. In the second phases, a 3D finite element (FE) numerical model for a rock-fill dam is created by using ANSYS®, considering the dam connection with its powerhouse
... Show MoreWater supply and distribution networks play an important role in our daily activities. They make a substantial contribution to public health by providing potable water for public consumption and non-potable applications such as firefighters and other purposes such as irrigation. This study used ArcMap 10.8 and WaterGEMS CONNECT Edition update 1 version to create a hydraulic network model to simulate the pipes’ network. Detailed network information, including pipe lengths, layouts, and diameters, was given by the Baghdad Water Department. The TUF-2000H Handheld digital ultrasonic flow meter has been used to measure the water flows in the network’s source nodes. In eight junctions,
Water quality assessment offers a scientific basis for water resource development and management. This research aims to assessment of Al-Rustamiya sewage treatment plant depending on annually changes and produces maps that declare changes on parameter during a period (2015-2018). Based on prior Government Department Baghdad Environment data which annually feature changes for samples from Northern Rustamiya have been estimated as a working model. Drawn a map of the Diyala River shows annual changes in the characteristics of the Diyala River, based on northern and southern Rustamiya effluent samples, and Diyala River samples. The characteristics that research focused on were biochemical