Preferred Language
Articles
/
joe-1934
The Economic Evaluation of Various Production Scenarios for Zubair Reservoir in the Kifl Field
...Show More Authors

This work evaluates the economic feasibility of various production scenarios for the Zubair reservoir in the Kifl oil field using cash flow and net present value (NPV) calculations. The Kifl field is an exploratory field that has not yet been developed or assessed economically. The first well was drilled in 1960, and three other wells were later drilled to assess the oil accumulation, so in this research, Different production scenarios were evaluated economically. These scenarios were proposed based on the reservoir model of the Zubair formation in the field. The research methodology used QUE$TOR software to estimate capital expenditures (CapEx) and operating expenditures (OpEx) based on field-level data, production profiles for each scenario, and produced fluid properties. CapEx estimates were mainly based on the number of drilled wells and plateau duration, while OpEx estimates were based on the number of barrels produced from each scenario. Cash flow values were estimated each year in the production interval after subtracting water handling costs, CapEx, and OpEx from the gross revenue of oil produced. The NPV for each scenario was then calculated using a 5% interest rate, and the most economical option was determined by comparing the NPV values of each scenario. Case-3 scenario was identified as the most economical option, with a high NPV value of approximately 612 MM$, an oil production rate of 10 MSTB/d, a Plateau duration of 3 years, a total number of wells of 11, and an Initial water cut of 13 %.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Nov 01 2015
Journal Name
Journal Of Craniofacial Surgery
Evaluation of the Trephine Method in Harvesting Bone Graft From the Anterior Iliac Crest for Oral and Maxillofacial Reconstructive Surgery
...Show More Authors

View Publication
Scopus (17)
Crossref (16)
Scopus Clarivate Crossref
Publication Date
Sat Jun 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Using Random Dynamic Programming in Production Planning with Application in the midland Refineries Company
...Show More Authors

 

Abstract

     This research deals with Building A probabilistic Linear programming model  representing, the operation of production in the Middle Refinery Company (Dura, Semawa, Najaif) Considering the demand of each product (Gasoline, Kerosene,Gas Oil, Fuel Oil ).are random variables ,follows certain probability distribution, which are testing by using Statistical programme (Easy fit), thes distribution are found to be Cauchy distribution ,Erlang distribution ,Pareto distribution ,Normal distribution ,and General Extreme value distribution .              &

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Economics And Administrative Sciences
application of business managment in the field of football with studuy of the case of spanish club (Real Madrid) و (Barcelona
...Show More Authors

Football has progressed from being a ritual and a celebration to become an amateur sport, a professional sport, and now, increasingly, a commercial sport. In the analysis of football business model, the systemic approach should be adopted. If sport is regarded as one of the business sectors, then the application of business system methodology can be fully justified. The interest to create strong football business system calls for the search of the ways of popularizing football business model and boosting the economic potential of its participants. In the research literature tend to ignore the business processes within the sports business. Besides, the systemic approach in football business is usually limited to p

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Feb 01 2022
Journal Name
Journal Of Engineering
Geomechanical study to predict the onset of sand production formation
...Show More Authors

One of the costliest problems facing the production of hydrocarbons in unconsolidated sandstone reservoirs is the production of sand once hydrocarbon production starts. The sanding start prediction model is very important to decide on sand control in the future, including whether or when sand control should be used. This research developed an easy-to-use Computer program to determine the beginning of sanding sites in the driven area. The model is based on estimating the critical pressure drop that occurs when sand is onset to produced. The outcomes have been drawn as a function of the free sand production with the critical flow rates for reservoir pressure decline. The results show that the pressure drawdown required to

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun May 21 2023
Journal Name
Journal Of Namibian Studies : History Politics Culture
The role of cleaner production costs to reducing failure costs
...Show More Authors

Economic units can benefit from the cleaner production strategy, which aims to reduce the environmental impact of economic activities while improving efficiency and profitability. Accordingly, the aim of the research was to clarify the knowledge foundations of cleaner production costs and to indicate their role in reducing the costs of poor quality (the costs of failure). A set of conclusions has been reached, the most important of which is that cleaner production has achieved a reduction in the costs of external failure, represented by the costs of guarantee, by an amount of 12,339,000 dinars. Contributes to reducing the costs of failure, and based on the conclusions, a set of recommendations were presented, the most important of w

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sun Mar 30 2014
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Design of Horizontal Well Program for Ajeel Field
...Show More Authors

Horizontal wells are of great interest to the petroleum industry today because they provide an attractive means for improving both production rate and recovery efficiency. The great improvements in drilling technology make it possible to drill horizontal wells with complex trajectories and extended for significant depths.
The aim of this paper is to present the design aspects of horizontal well. Well design aspects include selection of bit and casing sizes, detection of setting depths and drilling fluid density, casing, hydraulics, well profile, and construction of drillstring simulator. An Iraqi oil field (Ajeel field) is selected for designing horizontal well to increase the productivity. Short radius horizontal well is suggested fo

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 01 2022
Journal Name
Journal Of Applied Geophysics
Predicting dynamic shear wave slowness from well logs using machine learning methods in the Mishrif Reservoir, Iraq
...Show More Authors

View Publication
Scopus (16)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Sat Oct 01 2022
Journal Name
Journal Of Applied Geophysics
Predicting dynamic shear wave slowness from well logs using machine learning methods in the Mishrif Reservoir, Iraq
...Show More Authors

Crossref (12)
Crossref
Publication Date
Thu Mar 21 2019
Journal Name
Biochemical & Cellular Archives
EVALUATION OF THE POTASSIUM AVAILABILITY IN THE SALINE SOILS USING THE THERMODYNAMIC CRITERION
...Show More Authors

View Publication Preview PDF
Publication Date
Thu Feb 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Post-evaluation of the strategic projects of the Directorate of Public Municipalities - Case study for the period (2004-2015
...Show More Authors

The research aims at conducting a follow-up evaluation of a number of strategic projects implemented by the Directorate of Public Municipalities, one of the Ministry of Construction, Housing and Municipalities and Public Works. The sample included (35) varied strategic projects implemented in most Iraqi governorates. Buildings, municipal buildings, minarets, massacres, multi-story parking, paving and rehabilitation of streets and residential neighborhoods. The difference between the actual and planned times and costs of these projects was then measured and analyzed. These projects were used as a tool for collecting data and information. The questionnaire included four axes, each representing one of the parties to the project, whi

... Show More
View Publication Preview PDF
Crossref