Preferred Language
Articles
/
joe-1924
Improving Building Information Modeling (BIM) Implementation throughout the Construction Industry
...Show More Authors

Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Central Bank of Iraq (CBI) building, and strive to improve the BEP of the CBI building. However, previous studies indicate collaborative work and communications enhance effective BIM implementation, which can improve BIM use by applying a BEP and an AEC (UK) BIM protocol that leads to positive BIM impact. BEP comprises important information and goals related to the intended project, including the BIM collaborative process (process map), information exchange requirements, BIM data management, BIM model management, and quality control, which are considered essential for enhancing BIM collaboration during PLC. This paper concludes that implementing BIM effectively requires overcoming obstacles faced by Iraqi construction projects. Effective BIM implementation requires improving collaboration and communication throughout the construction process, which could be achieved by depending on the BIM Execution Planning Guide(BEP Guide) and the AEC (UK) BIM Protocol 2012 V2.0

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jan 01 2019
Journal Name
Advances In Informatics And Computing In Civil And Construction Engineering: Proceedings Of The 35th Cib W78 2018 Conference: It In Design, Construction, And Management
Technology alternatives for workplace safety risk mitigation in construction: Exploratory study
...Show More Authors

Publication Date
Fri Jun 18 2004
Journal Name
Iraqi Journal Of Laser
Design and Construction of Semiconductor Laser Range Finder for Target Designation
...Show More Authors

The aim of this research is to design and construct a semiconductor laser range finder
operating in the near infrared range for ranging and designation. The main part of the range finder is the
transmitter which is a semiconductor laser type GaAs of 0.904 mm wavelength with a beam expander,
and the receiver with its collecting optics. The characteristics of transmitter pulse width were 200ns and
threshold current 10 Amp. and maximum operating current 38 Amp. The repetition rate was set at 660 Hz
and maximum output power about 1 watt. The divergence of the beam was 0.268o. A special computer
code was used for optimum optical design and laser spot size analysis and for calculation of atmosphere
attenuation.

View Publication Preview PDF
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Safety Research
Analysis of prevention through design studies in construction: A subject review
...Show More Authors

View Publication
Scopus (21)
Crossref (22)
Scopus Clarivate Crossref
Publication Date
Fri Mar 23 2018
Journal Name
Scientific Conference
Philosophy of Abstraction and Construction of Space in Contemporary Iraqi Theater
...Show More Authors

Philosophy of Abstraction and Construction of Space in Contemporary Iraqi Theater Abstract The aesthetic and stylistic features in the theatrical play develop according to the changes of the age and its developments. Stylistic forms different from the prevailing and familiar in the visions of contemporary theatre directors emerged which adopt the removal of traditional awareness in the creation of the visual space of theatrical discourse, through adopting contemporary formats and structures which depend on the abstraction representations in the aesthetic construction of the contemporary theatre show which is one of the prerequisites of the postmodern theater, that produces aesthetic data based on abstract metaphors in the formation of th

... Show More
View Publication Preview PDF
Publication Date
Sat Aug 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Case Study to Evaluate Work-Zone Safety Technologies in Highway Construction
...Show More Authors

View Publication
Scopus (19)
Crossref (18)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Factors affecting time and cost trade-off in multiple construction projects
...Show More Authors

Scopus (8)
Scopus
Publication Date
Mon Jun 01 2015
Journal Name
Journal Of Engineering
Construction of Graduation Certificate Issuing System Based on Digital Signature Technique
...Show More Authors

With the development of computer architecture and its technologies in recent years, applications like e-commerce, e-government, e-governance and e-finance are widely used, and they act as active research areas. In addition, in order to increase the quality and quantity of the ordinary everyday transactions, it is desired to migrate from the paper-based environment to a digital-based computerized environment. Such migration increases efficiency, saves time, eliminates paperwork, increases safety and reduces the cost in an organization. Digital signatures are playing an essential role in many electronic and automatic based systems and facilitate this migration. The digital signatures are used to provide many services and s

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Feb 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
The role of strategic Agility in organizational excellence In Ministry of Construction, Housing, Municipalities and Public Works
...Show More Authors

The aim of this research is to identify the role of strategic agility achieving organizational excellence in one of the formations of the Ministry of Municipalities (Dhi Qar Sewage Directorate), as important service organizations that have a key role in serving and developing the society which faced many administrative challenges and issues and as a result of the changes in the environment is continuing and accelerating, so the adoption of modern administrative concepts such as strategic Agility and knowledge of their role in achieving organizational excellence can help them in facing these changes and achieve what they aspire to. In order to achieve research objectives, two main hypotheses have been formulated. The first hypothe

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jan 01 2013
Journal Name
Journal Of College Of Education
The Construction of Complete (k, n)-arcs in 3-Dimensional Projective Space Over Galois Field GF (4)
...Show More Authors

In this work, we construct the projectively distinct (k, n)-arcs in PG (3, 4) over Galois field GF (4), where k 5, and we found that the complete (k, n)-arcs, where 3 n 21, moreover we prove geometrically that the maximum complete (k, n)-arc in PG (3, 4) is (85, 21)-arc. A (k, n)-arcs is a set of k points no n+ 1 of which are collinear. A (k, n)-arcs is complete if it is not contained in a (k+ 1, n)-arcs