Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due to changing designs and specifications during construction; inaccuracy in time and budget estimation; construction material price; financial and economic crisis/financial instability; selecting the contractor only based on the lowest bid, regardless of technical competence; instability within the political system of the government/instability of the government as a client; foreign exchange rates fluctuate against the Iraqi dinar. The study also showed that the respondents recommended allocating four risks to the owner, eight risk factors to the contractor, one risk to the consultant, and 32 factors allocated as shared. The study concluded that the results could help identify the most critical risks facing this type of project and the contracting party that can bear the risks and manage them efficiently.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jun 29 2018
Journal Name
Journal Of Engineering
Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects
...Show More Authors

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi

... Show More
View Publication Preview PDF
Crossref (17)
Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Economic Benefits for the Application of Standards of Sustainability in Construction Projects
...Show More Authors

In this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed  that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (4)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Factors Affecting Labor Productivity on Construction in Kurdistan of Iraq: Web Survey
...Show More Authors

This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study,

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
New cost control techniques in mega construction projects
...Show More Authors

View Publication
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Sat Jun 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
Diagnosis of factors affecting the strategic implementation of sewage projects ( Case study in General Directorate of sewage projects )
...Show More Authors

  This  Research aim to identify the factors affecting the strategic implementation of sewage projects and to seek to activate the real follow-up of projects to identify the factors that accompany their implementation, The study included a sample of the projects of the investment plan implemented for the Directorate General of sewage in the governorates of Iraq, which was completed during the six years period (2010-2016). The sample of the research was four projects: The project of implementation and processing of the treatment plant and the lifting station and the conveyor line for the project of IMARA/The third stage/Al-Sanaf marshland , The project of the processing and implementation of the treatment plant with the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying The Decision-Making State and Impact in Iraqi Construction Projects
...Show More Authors

View Publication
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying the decision-making state and impact in Iraqi construction projects
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
An Applying the Delphi Technique for Eliciting Criteria in Equipment and Materials Used in Highway Construction Projects
...Show More Authors

This article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a

... Show More
View Publication Preview PDF
Crossref (4)
Crossref