In most manufacturing processes, and in spite of statistical control, several process capability indices refer to non conformance of the true mean (µc ) from the target mean ( µT ), and the variation is also high. In this paper, data have been analyzed and studied for a blow molded plastic product (Zahi Bottle) (ZB). WinQSB software was used to facilitate the statistical process control, and process capability analysis and some of capability indices. The relationship between different process capability indices and the true mean of the process were represented, and then with the standard deviation (σ ), of achievement of process capability value that can reduce the standard deviation value and improve production out of theoretical control limitations and cost reduction.
The study exhibits that when adjusting the center to the target value by adjusting the mold to the machine, the capability index (C ) enhanced by (14.56 %), capability index ( p C ) is enhanced by (14.48 %), pk capability index (Cpm ) is enhanced by (12.5 %) and accuracy index (Ca ) is enhanced by (14.49 %). The percentage of the specification band used up by the process ( P ) is reduced by (12.8 %) and the degree of variation increases.
The objective Effect of Internal and External Environment and its Psychological & Practical Reflection on the Political Decision-Making Process
Four antimony compounds were used in this inves as additives to retard combustion of unsaturated polyester and epoxy resins, namely: 1. Tetraethyl ammonium tribromoethylantimonates (additive I). 2. Tetraethyl ammonium chlorodibromoethylantimonates (additive II). 3. Tetraethyl ammonium trichloroethylantimonates (additive III). 4. Tetraethyl ammonium bromodichloroethylantimonates (additive IV). The effects of these additives on flammability of unsaturated polyester and epoxy resins have been studied by using sheets of the resins with weight percentages of (0.5,1.0,1.5,2.0,2.5&3.0%) of the additives in dimensions of (150 X150X3)mm .Three standard test methods were used to measure the flame retardation which are: (ASTM:D -2863), (ASTM:D-635
... Show MorePollution of the aquatic environment and the depletion of the natural resource cause imbalance in the natural balance of the river environment and contributes to the deterioration of life and the killing of living organisms. Most of the old and modern cities and urban centers were set up close to the rivers because water enters the main lifeblood and all its facilities. The proximity of cities to rivers caused environmental problems resulting from the dumping of residues of these cities to a large and continuous, these wastes include all uses of the city (industrial, agricultural, residential and commercial) and others. The accumulation of these wastes inside the rivers water kills life and makes them unsuitable for various uses to bury
... Show MoreBackground: obesity is a major global health problem with more than 200 million obese men and almost 300 million obese women. Melatonin is a well-known molecule for its involvement in circadian rhythm regulation and has multiple pathological actions including control of appetite, sleep wake cycle and metabolic syndrome.
Aim: to estimate the effect of melatonin supplements on obese patients on a calorie restricted diet in comparison to patients on lifestyle measures only in the form of weight loss, waist circumference and sleep quality.
Subjects and Method: one hundred patients with body mass index > 24 were collected, fifty patients were starte
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend
... Show More