Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg and (15) passes were adopted. Such procedure was in accordance to previous work conducted by the author. The effects of the type of coarse aggregate (crushed and rounded), fine aggregate (river and natural) and cement type (OPC and SRPC) on the mechanical properties of RCC were investigated. The effect of compaction method on compressive strength and indirect tensile strength was also discussed. A total of (26) roller compacted concrete slab samples of (380×380×100 mm) were prepared in the laboratory, Then, the slab specimens are taken out of the molds and immersed in the curing tank for (28) days. Core and Beam specimens were obtained from the slab samples for the determination of mechanical properties. Such properties include compressive, indirect tensile, flexural strengths using one point loading. It was concluded that the compressive strength of RCC using crushed aggregate is higher than that when using rounded aggregate in a range of (15-66) % for core specimens, while the compressive strength of RCC when using river sand is higher than that when using natural sand in a range of (9-26)% for core specimens. When river sand is implemented, RCC samples show higher indirect tensile strength than those with natural sand, such variation is within (7-8) %
In this work, we construct the projectively distinct (k, n)-arcs in PG (3, 4) over Galois field GF (4), where k 5, and we found that the complete (k, n)-arcs, where 3 n 21, moreover we prove geometrically that the maximum complete (k, n)-arc in PG (3, 4) is (85, 21)-arc. A (k, n)-arcs is a set of k points no n+ 1 of which are collinear. A (k, n)-arcs is complete if it is not contained in a (k+ 1, n)-arcs
The present paper aims at investigating the linguistic image portrayed by UNICEF reports on the Iraqi child from a critical discourse analysis perspective during Covid19 pandemic (2020). The paper attempts to fill a gap in research literature concerning the linguistic construction of the Iraqi child by the UNICEF reports during the critical health crisis of Covid19. Van Leeuwen’s (2008) approach of social actor representation has been adopted for this purpose. From Van Leeuwen’s approach, the category of determination (single determination and overdetermination) has been selected to be the main analytical tool for its high compatibility with the set of objectives put forward to figure out how such a globally effective and
... Show MoreThis research is under the title (Construction Grammar in the Kurdish language), which in turn is an attempt to present grammar and Kurdish grammar from the perspective of the constructive of Cognitive Linguistics. The construction as a term in the Kurdish language base was not recent, as it was discussed in other schools in a specific way from the perspective of language schools, but the subject of construction with a perceived background includes specific purposes, which is how to build the linguistic base by being a template accessible to its speakers, and in the cases of speaking it, not to mention how it is perceived and the level it is familiar with by its speakers. The nominal purpose of the Construction is Unification of form-mea
... Show MoreThe research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, tim
... Show MoreWhile providing important news information, News tickers ( also called sliders or crawlers ) have become one of the methods used daily by satellite channels, because it’s almost a continuous news coverage and as it seems, it has become today an addition to the news world. Hence, satellite channels need to look for a mechanism to build news tickers in order to develop them even though they are still today not recognisable and in need of being classified in a radio or television art, and that is not easy. This research sheds light on the construction of the slider of a news satellite channel, which is important according to our modest convictions, as it can be the beginning of a long scientific research in a new field of study. The probl
... Show MoreThe theater has a living environment that resembles or realistically simulates the real life environment on the stage where we see the place, light and living being as elements representing a picture of the life scene and for a period of time the theater merely conveyed that image, but with the development of the world industrially and technologically, the perception of this picture has evolved with the emergence of intellectual progress where each part has advantages and Philosophical goals that are consistent with the evolution of form. The theatrical lighting, colors and landscapes have become parts in the composition of a new life component in form and content and based on the above this research is titled&nbs
... Show MoreIn this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas
... Show MoreFrequently, Load associated mode of failure (rutting and fatigue) as well as, occasionally, moisture damage in some sections poorly drained are the main failure types found in some of the newly constructed road within Baghdad as well as other cities in Iraq. The use of hydrated lime in pavement construction could be one of the possible steps taken in the direction of improving pavement performance and meeting the required standards. In this study, the mechanistic properties of asphalt concrete mixes modified with hydrated lime as a partial replacement of limestone dust mineral filler were evaluated. Seven replacement rates were used; 0, 0.5, 1, 1.5, 2, 2.5 and 3 percent by weight of aggregate. Asphalt concrete mixes were prepared at their
... Show MoreThe conception and experimental assessment of a removable friction-based shear connector (FBSC) for precast steel-concrete composite bridges is presented. The FBSC uses pre-tensioned high-strength steel bolts that pass through countersunk holes drilled on the top flange of the steel beam. Pre-tensioning of the bolts provides the FBSC with significant frictional resistance that essentially prevents relative slip displacement of the concrete slab with respect to the steel beam under service loading. The countersunk holes are grouted to prevent sudden slip of the FBSC when friction resistance is exceeded. Moreover, the FBSC promotes accelerated bridge construction by fully exploiting prefabrication, does not raise issues relevant to precast co
... Show More