This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost
Conditional logistic regression is often used to study the relationship between event outcomes and specific prognostic factors in order to application of logistic regression and utilizing its predictive capabilities into environmental studies. This research seeks to demonstrate a novel approach of implementing conditional logistic regression in environmental research through inference methods predicated on longitudinal data. Thus, statistical analysis of longitudinal data requires methods that can properly take into account the interdependence within-subjects for the response measurements. If this correlation ignored then inferences such as statistical tests and confidence intervals can be invalid largely.
The present study investigated the use of pretreated fish bone (PTFB) as a new surface, natural waste and low-cost adsorbent for the adsorption of Methyl green (MG, as model toxic basic dye) from aqueous solutions. The functional groups and surface morphology of the untreated fish bone (FB) and pretreated fish bone were characterized using Fourier transform infrared (FTIR), scanning electron microscopy (SEM) and Energy dispersive X-ray spectroscopy (EDS),respectively. The effect of operating parameters including contact time, pH, adsorbent dose, temperature, and inorganic salt was evaluated. Langmuir, Freundlich and Temkin adsorption isotherm models were studied and the results showed that the adsorption of basic dye followed Freundlich iso
... Show MoreThe present study investigated the use of pretreated fish bone (PTFB) as a new surface, natural waste and low-cost adsorbent for the adsorption of Methyl green (MG, as model toxic basic dye) from aqueous solutions. The functional groups and surface morphology of the untreated fish bone (FB) and pretreated fish bone were characterized using Fourier transform infrared (FTIR), scanning electron microscopy (SEM) and Energy dispersive X-ray spectroscopy (EDS), respectively. The effect of operating parameters including contact time, pH, adsorbent dose, temperature, and inorganic salt was evaluated. Langmuir, Freundlich and Temkin adsorption isotherm models were studied and the results showe
The software-defined network (SDN) is a new technology that separates the control plane from data plane for the network devices. One of the most significant issues in the video surveillance system is the link failure. When the path failure occurs, the monitoring center cannot receive the video from the cameras. In this paper, two methods are proposed to solve this problem. The first method uses the Dijkstra algorithm to re-find the path at the source node switch. The second method uses the Dijkstra algorithm to re-find the path at the ingress node switch (or failed link).
... Show More
He research specifies subjects which may contribute in improve productivity of the General Company for vegetable oil product/ Al-Farab factory and aims to release the relationship between system Quick Response Manufacturing (QRM) and scheduling operations.
The Implementation was in the general company for vegetable oil product (Al-Farab factory), Universe Factory It suffers from a failure to follow Scheduling in its operations And not taking into account the lead times And delays in product delivery dates, Here are drawing the attention of the administration in the factory to use Quick Response Manufacturing (QRM) to control the energy and inventory, machin
... Show More
The aims of this reserch is identify evaluate the organizational commitment level of (emotional, standard, continuous) and the level of discipline dimensions (functional duties, professional responsibility and ethics) for medical doctors in Ramadi Teaching Hospital due to their relationship with the organization effectiveness the level of completion work and the importance of the expected results in the field respondent
sample of (50) doctors has from all branches and specialties, including specialist doctors consultants and practitioners as well as branches of residence and senior the most prominent results reached are the emotional and the st
... Show MoreThe research aims to examine the integration effect among resource consumption accounting (RCA) system and the enterprise resource planning (ERP) on both costs reduction and quality improvement. The study questioner form distributed to two different respondents as the unit of analysis. The research reached various conclusions most important of which is the integration relationship can help solve the special difficulties in managing the economic unit data. Moreover, the integration provides a clear picture of the causal relationships between resources, resource quantities, and associated costs