This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost
This research deals with the most important heritage in Iraq, which are the Iraqi marshes, especially Abu Zarag marsh in Al-Nasiriyah city south of Iraq. The research is divided into two parts. The first part deals with evaluating the water quality parameters of Abu Zarag marsh for the period from December 2018 to April 2019 which is the flooding season. The parameters are Temperature, pH, Electrical Conductivity, Total Dissolved Solids, Alkalinity, Total Hardness, Turbidity, Dissolved Oxygen, Sulfate, Nitrate. The second part is a comparison between the water quality parameters during the recent period with the same period during the previous years from 2014 to 2019. The results are
Artificial Intelligence Algorithms have been used in recent years in many scientific fields. We suggest employing flower pollination algorithm in the environmental field to find the best estimate of the semi-parametric regression function with measurement errors in the explanatory variables and the dependent variable, where measurement errors appear frequently in fields such as chemistry, biological sciences, medicine, and epidemiological studies, rather than an exact measurement. We estimate the regression function of the semi-parametric model by estimating the parametric model and estimating the non-parametric model, the parametric model is estimated by using an instrumental variables method (Wald method, Bartlett’s method, and Durbin
... Show MoreAbstract
The basic orientation of the research is an attempting to apply the cost determining method according in the contract sector projects for Al- Iraq ceneral company, that this subject has a big value according to its modernity and its influence on the future and the eaning of the company.
The research aims to find out the effect of the method for determining cost based on the activity in determining the cost of the construction sector projects.The research was conducted in Iraq General Company for the implementation of irrigation projects. Bani search on three assumptions, the first is (that the application of the method for determining the cost on the basis of
... Show MoreA high percentage of existing buildings in Iraq are traditional buildings, yet there is approximately no such green building in Baghdad or other governorates. Most of these buildings require urgent upgrading to increase their performance (operationally, economically, and environmentally), also the building owners looking for identifying and implementing many of the green building measures to reduce the operational and maintenance costs of their buildings. The decision-makers need to support the possibility of achieving sustainable measures of existing building rating systems such as LEED or BREEAM, and that would require an optimization model. The goal of this study is to maximize the
The research is summarized in the construction of a mathematical model using the most common methods in the science of Operations Research, which are the models of transportation and linear programming to find the best solution to the problem of the high cost of hajj in Iraq, and this is done by reaching the optimum number of pilgrims traveling through both land ports and the number Ideal for passengers traveling through airports by Iraqi Airways, instead of relying on the personal experience of the decision-maker in Hajj and Umrah Authority by identifying the best port for pilgrim's travel, which can tolerate right or wrong, has been based on scientific methods of Operations Research, the researcher built two mathematical models
... Show MoreThe research aims to identify the importance of using the style of the cost on the basis of activity -oriented in time TDABC and its role in determining the cost of products more equitably and thus its impact on the policy of allocation of resources through the reverse of the changes that occur on an ongoing basis in the specification of the products and thus the change in the nature and type of operations . The research was conducted at the General Company for Textile Industries Wasit / knitting socks factory was based on research into the hypothesis main of that ( possible to calculate the cost of activities that cause the production through the time it takes to run these activities can then be re- distributed product cost
... Show MoreCost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela
... Show MorePiled raft is commonly used as foundation for high rise buildings. The design concept of piled raft foundation is to minimize the number of piles, and to utilize the entire bearing capacity. High axial stresses are therefore, concentrated at the region of connection between the piles and raft. Recently, an alternative technique is proposed to disconnect the piles from the raft in a so called unconnected piled raft (UCPR) foundation, in which a compacted soil layer (cushion) beneath the raft, is usually introduced. The piles of the new system are considered as reinforcement members for the subsoil rather than as structural members. In the current study, the behavior of unconnected piled rafts systems has been studie
... Show MoreThe contemporary business environment is witnessing increasing calls for modifications to the traditional cost system, and a trend towards adopting cost management techniques to provide appropriate financial and non-financial information for senior and executive departments, including the Resource Consumption Accounting (RCA) technique in question, which classifies costs into fixed and variable to support the decision-making process. Moreover, (RCA) combines two approaches to cost estimation, the first based on activity-based cost accounting (ABC) and the second on the German cost accounting method (GPK). The research aims to provide a conceptual vision for resource consumption accounting, after Considering it as an accounting te
... Show More