This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost
The problem of solid waste from domestic, industrial, commercial and medical sources is one of the most important problems facing the local administration in all Iraqi cities. The danger of this problem increases with the rapid increase in the population, changing lifestyles, consumption patterns, limited land suitable for landfill, and high costs of collection and disposal. This research aims to solve these problems by determining the locations of current landfills located in the outskirts of Baghdad Governorate. The ArcGIS program was used, where the sites of the landfills were determined on the map and through the available data about the areas. it was concluded that the existing landfill sites do not meet environmental conditions and
... Show MoreSmear zone is usually formed around the prefabricated vertical drains (PVD’s) due to mandrel driving. The geotechnical properties of the soil in this zone exhibit significant changes that affect the performance of the PVD’s. The most relevant property in this respect is the coefficient of permeability. So far, no serious attention is paid to investigate the effects of shearing under large shear strains on the geotechnical properties of the soft soil in Fao region. In this study, an extensive laboratory testing program was conducted to assess the characteristics of the smear zone with an emphasis on the permeability coefficient of Fao soft soil. The results show that the permeability of the smear zone is about 70% of
... Show MoreThe research aims to identify the importance of using analytical procedures in the detection of creative accounting practices. To achieve this goal, (100) questionnaires were prepared and distributed to the auditors in the Federal Financial Supervision Bureau and the authorized auditors' offices and practitioners of the auditing profession in Iraq. For the purpose of testing the research hypothesis and analyzing data, some appropriate statistical methods have been used and the use of the statistical program (SPSS) to analyze the data. The results of the research showed that the analytical procedures and tests applied by the auditor have a role in revealing and limiting creative accounting practices and methods and that auditors u
... Show MoreProjects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo
The research aims to determine the strength of the relationship between time management and work pressure and administrative leadership, where he was taken a sample of (47) of the administrative leadership at the Higher Institute of security and administrative development in the Ministry of Interior was used questionnaire as a key tool in collecting data and information and analyzed the answers to the sample surveyed by using Statistical program (spss) in the arithmetic mean of the calculation and test (t) and the correlation coefficient, the research found the most important results: the existence of significant moral positive relationship between both time management and work pressure and administrative leadership, the leadership of th
... Show MoreThis research aims to know the role and impact of participation in the capabilities of human resources programs, and for the purpose of measuring it has been determined the dimensions of these two variables by relying on standards for this purpose, was chosen as the Ministry of Higher Education and Scientific Research / device supervision and scientific calendar as one of the important departments in the ministry and includes a large number of individuals at different organizational levels for the purpose of answering a questionnaire prepared for the purpose of measurement and access to the results and the achievement of the objectives of the research and which ha
... Show MoreOil recovery could be impacted by the relation between vertical permeability (Kv) and horizontal permeability (Kh) (Kv/Kh). 4816 plugs that have been getting hold of 18 wells of Mishrif formation in the West Qurna oilfield were used. Kv/Kh data provided some scatter, but the mean is ~1. Kv/Kh =1 was used for the Petrel model before upscaling according to the heterogeneity of each layer.
Kv/Kh values for Mishrif Formation in West Qurna Oilfield are 0.8 for relatively homogeneous, 0.4 for heterogeneous rock, and 0.1 for cap rocks (CRII).
Eclipse TM was used for reservoir simulation. PVT and SCAL data e
... Show More