Preferred Language
Articles
/
joe-171
Optimization of Surface Roughness for Al-alloy in Electro-chemical Machining (ECM) using Taguchi Method
...Show More Authors

Electro-chemical Machining is  significant  process to remove metal with using  anodic dissolution. Electro-chemical machining use to removed metal workpiece from (7025) aluminum alloy using Potassium chloride (KCl) solution .The tool used was made from copper. In this present the optimize processes input parameter use are( current, gap and electrolyte concentration) and surface roughness (Ra) as output .The experiments on electro-chemical machining with use current (30, 50, 70)A, gap (1.00, 1.25, 1.50) mm and electrolyte concentration (100, 200, 300) (g/L).  The method (ANOVA) was used to limited the large influence factors affected on surface roughness and found the current was the large influence factors  with (72.17%) . The results of the optimization of comparison of experimental and prediction conditions current at level-1(30 A) , gap at level-1 (1.00mm ) and electrolyte concentration at level-1(100(g/L)) shown the average experiments and prediction surface roughness (1.352) and (1.399) respectively..

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Mar 03 2013
Journal Name
Baghdad Science Journal
A Comparison of the Methods for Estimation of Reliability Function for Burr-XII Distribution by Using Simulation.
...Show More Authors

This deals with estimation of Reliability function and one shape parameter (?) of two- parameters Burr – XII , when ?(shape parameter is known) (?=0.5,1,1.5) and also the initial values of (?=1), while different sample shze n= 10, 20, 30, 50) bare used. The results depend on empirical study through simulation experiments are applied to compare the four methods of estimation, as well as computing the reliability function . The results of Mean square error indicates that Jacknif estimator is better than other three estimators , for all sample size and parameter values

View Publication Preview PDF
Crossref
Publication Date
Tue Jun 30 2015
Journal Name
Al-kindy College Medical Journal
Surgical –Audit on breast cancer risk factors in AL-Russafa district in Baghdad
...Show More Authors

Background: Breast cancer remains a substantial cause of morbidity and mortality, there is a need for continued efforts to understand the etiology of the disease, maintain screening effort, implement prevention strategies, and develop better treatments.Objective: To analyze the risk factors, improve early detection and prevention of breast cancer in Al-Russafa district- Baghdad, aiming to increase survival rate and improve the quality of life.Methods: A cross sectional audit of 258 breast cancer cases seen at Al-Elwiya maternity teaching hospital from January2009 to December 2011,data collected from patients files were: age, gender , residency, marital status, parity, age at menarche and menopause age at first live birth, hormonal therap

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (3)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of The Association Of Arab Universities For Studies And Engineering Researches
Dewatering Effect on Virtual Settlement of Pile Foundation: Case Study in Bab Al-Mudham Area, Baghdad-Iraq
...Show More Authors

The need for Dewatering is very important in construction workshops field and sometimes it needs to pay more attention as a result of its impacts on causing additional settlement of nearby pile foundations. Dewatering construction may become a costly topic if ignored during project planning and designing .In this paper a simplified procedure maybe adopted to calculate the foundation settlement induced by using dewatering system which is required to lower the water table level to reach a dry condition during construction. Synthesized case study adopted at a specified location in Baghdad city and analysis are computed for two types of piles both of them are submerged with water. Results shows the effect of dewatering on pile foundatio

... Show More
Publication Date
Sun Oct 01 2017
Journal Name
Applied Energy
Hourly yield prediction of a double-slope solar still hybrid with rubber scrapers in low-latitude areas based on the particle swarm optimization technique
...Show More Authors

View Publication
Scopus (33)
Crossref (32)
Scopus Clarivate Crossref
Publication Date
Mon Mar 23 2020
Journal Name
Journal Of Engineering
Diagnosing Water Problem for Asmari Reservoir in Abu Ghirab Oilfield Using Analytical and Numerical Approaches
...Show More Authors

Asmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement inside the reser

... Show More
Crossref (1)
Crossref
Publication Date
Wed Feb 22 2023
Journal Name
Iraqi Journal Of Science
Extraction Drainage Network for Lesser Zab River Basin from DEM using Model Builder in GIS
...Show More Authors

ArcHydro is a model developed for building hydrologic information systems to synthesize geospatial and temporal water resources data that support hydrologic modeling and analysis. Raster-based digital elevation models (DEMs) play an important role in distributed hydrologic modeling supported by geographic information systems (GIS). Digital Elevation Model (DEM) data have been used to derive hydrological features, which serve as inputs to various models. Currently, elevation data are available from several major sources and at different spatial resolutions. Detailed delineation of drainage networks is the first step for many natural resource management studies. Compared with interpretation from aerial photographs or topographic maps, auto

... Show More
View Publication Preview PDF
Publication Date
Mon Mar 23 2020
Journal Name
Journal Of Engineering
Diagnosing Water Problem for Asmari Reservoir in Abu Ghirab Oilfield Using Analytical and Numerical Approaches
...Show More Authors

Asmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement insi

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Apr 03 2025
Journal Name
Aip Conference Proceedings
Determining the Optimum Reference Orbits Using Lagrange’s Series for Geocentric Satellite in Low Earth Orbit
...Show More Authors

The Taylor series is defined by the f and g series. The solution to the satellite's equation of motion is expanding to generate Taylor series through the coefficients f and g. In this study, the orbit equation in a perifocal system is solved using the Taylor series, which is based on time changing. A program in matlab is designed to apply the results for a geocentric satellite in low orbit (height from perigee, hp= 622 km). The input parameters were the initial distance from perigee, the initial time, eccentricity, true anomaly, position, and finally the velocity. The output parameters were the final distance from perigee and the final time values. The results of radial distance as opposed to time were plotted for dissimilar times in

... Show More
View Publication Preview PDF