Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area). Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Evaluating the Efficiency of Finance Methods in Residential Complex Projects in Iraq
...Show More Authors

Financial funding of a construction firm plays an important role in all aspects of the process development. It has been noted that financial crises have a direct impact on the construction industry. The Iraqi government, whether locally or globally, has faced a severe shortage of financing which has resulted in incomplete projects. Due to the financial crisis that Iraq went through which led to the suspension of many residential complex projects and the difficulty of the use of public financing methods, we researched the private financing (public-private partnership) methods instead of public financing methods in residential complex projects implementation. This study verified the financial problems and the factors that relate to th

... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Identifying Failure Factors in the Implementation of Residential Complex Projects in Iraq
...Show More Authors

Residential complexes have witnessed a great demand in most countries worldwide, as they are one of the main infrastructure elements, in addition to achieving a developed urban landscape. However, complex residential projects in developing countries face various factors that could be improved in their implementation, especially in Iraq. Sixty-two experts in residential complex projects were interviewed and surveyed to verify these projects' failure factors,. Fifty-one factors were the main failure factors, divided into four main components (leadership, management system, external forces, and project resources). The Relatively Important Index (RII) is used to determine the relative importance factors and obtain the top tw

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jun 30 2003
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Two-Phase Pressure Drop Through Obstructions
...Show More Authors

View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (4)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Thu Sep 01 2016
Journal Name
Journal Of Management In Engineering
LEED-Certified Projects: Green or Sustainable?
...Show More Authors

View Publication
Scopus (19)
Crossref (18)
Scopus Clarivate Crossref
Publication Date
Thu May 18 2023
Journal Name
Journal Of Engineering
Effect of Cryogenic Trteatment on the Tensile Properties of Carbon Dual Phase Steel
...Show More Authors

The aim of this study was to evaluate tensile properties of low and medium carbon ferrite -martensite dual phase steel, and the effect cryogenic treatment at liquid nitrogen temperature (-196 ºC) on its properties. Low carbon steel (C12D) and medium carbon steels (C32D & C42D) were used in this work. For each steel grade, five groups of specimens were prepared according to the type of heat treatment. The first group was normalized, the second group was normalized and subsequently subjected to cryogenic treatment then tempered at (200 ºC) for one hour, the third group was quenched from intercritical annealing temperature of (760 ºC) to obtain dual phase (DP) steel, the fourth and fifth groups were both quenched from (760 ºC), but

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Development of a Blueprint Impact System of the risks on construction projects Implementation
...Show More Authors

In Production and Operations Management the specialists  have  tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.

     The research aims to develop a blu

... Show More
View Publication Preview PDF
Publication Date
Sun Sep 30 2007
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Dynamics of a single Condensing Two-Phase Bubble
...Show More Authors

The dynamics of a single condensing two-phase bubble of two different dispersed-continuous systems were studied. The systems were, CCl4 - water and CCl4 - 100% glycerol. Cinephotography was used to determine the change in height, diameter and time. These results were used to determine the experimental rise velocity of the bubble, which was compared with a theoretical one based on some equations used. It was found that the velocity of the first system remained almost constant, while it decreased gradually for the second system.

View Publication Preview PDF
Publication Date
Mon Jun 06 2022
Journal Name
Engineering, Technology &amp; Applied Science Research
Supply Chain Management of Infrastructure Projects in Iraq
...Show More Authors

Infrastructure projects take a long time, are complex, multidisciplinary, use different materials and products, and have high risk. These characteristics affect the process of supplying materials. The current paper studies the ability to improve the supply chain process and decrease its cost by identifying the factors that affect it. These factors are used as variables in the mathematical model, which is working under uncertain conditions when the consumption rate of materials is not constant. The information used in this model is obtained from Building Information Modeling (BIM) and Geographical Information System (GIS) techniques and the genetic algorithm is utilized to determine the optimal supplier and the quantities of supplies

... Show More
View Publication
Scopus (6)
Crossref (6)
Scopus Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More