Preferred Language
Articles
/
joe-168
Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area). Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Feb 08 2024
Journal Name
Engineering, Technology & Applied Science Research
Applying the Analytical Hierarchy Process to Identify the Challenges and Priorities of Reconstruction Projects in Iraq
...Show More Authors

Reconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in

... Show More
View Publication
Crossref (1)
Scopus Crossref
Publication Date
Wed Jan 13 2021
Journal Name
Palarch's Journal Of Archaeology Of Egypt / Egyptology
A WEIGHTED MEASUREMENT TO DIAGNOSED REASONS OF THE LOW SUCCESS RATIOS IN MATHEMATIC SUBJECT FOR THE THIRD INTERMEDIATE SCHOOLS AMONG A SAMPLE IN IRAQ
...Show More Authors

Objective: To suggest a weighted measure to diagnose the reasons for the low student success ratios in mathematics concerning the third grade of intermediate schools in light of components educational system represented by: [Students, Teachers, Curriculum, and Environmental reasons (others reasons)] assuming differentiated and interrelated components, Also the effectiveness forming of these components according to the gender variable. Methods: Data collection tools were prepared by constructing two questionnaires for each of (Students and Teachers), which included a number of items that involved some domains for studied components of educational system, which demonstrated a high level of validity and reliability in the pilot study, in addi

... Show More
View Publication Preview PDF
Publication Date
Wed Oct 17 2018
Journal Name
Journal Of Economics And Administrative Sciences
Impact of evaluation of investment projects in achieving competitive strategy
...Show More Authors

The aim of the research is to determine the impact of evaluation of investment projects after the preparation of investment budgets taking into consideration within the investment budgets the concept of competitive strategy, as the harmony between the preparation of investment budgets and competitive strategy will contribute to the success of economic unity and achieve profits well and achieve a competitive advantage. Strategies for economic units because the most important factor to them is the costs produced and the progress of the research problem is focused on "Is it possible to include a strategy of competition, especially within the investment budget when prepared The study concluded that the investment plan prepared by the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Materials Today: Proceedings
The role of business incubators in supporting and developing the international competitiveness of small projects in Iraq
...Show More Authors

View Publication
Scopus (7)
Crossref (4)
Scopus Crossref
Publication Date
Tue Mar 20 2018
Journal Name
Offshore Technology Conference Asia
Prediction of Hydrate Phase Equilibrium Conditions for Different Gas Mixtures
...Show More Authors
Abstract<p>Gas hydrate formation poses a significant threat to the production, processing, and transportation of natural gas. Accurate predictions of gas hydrate equilibrium conditions are essential for designing the gas production systems at safe operating conditions and mitigating the problems caused by hydrates formation. A new hydrate correlation for predicting gas hydrate equilibrium conditions was obtained for different gas mixtures containing methane, nitrogen and carbon dioxide. The new correlation is proposed for a pressure range of 1.7-330 MPa, a temperature range of 273-320 K, and for gas mixtures with specific gravity range of 0.553 to 1. The nonlinear regression technique was applie</p> ... Show More
Scopus (6)
Scopus Crossref
Publication Date
Sat Dec 30 2017
Journal Name
Al-khwarizmi Engineering Journal
Design & Implementation of High Switching & Low Phase Noise Frequency Synthesizer
...Show More Authors

This research  describes the design & implementation of frequency synthesizer using single loop Phase lock loop with the following specifications: Frequency range (1.5 – 2.75) GHz,Step size (1 MHz), Switching time 36.4 µs, & phase noise @10 kHz = -92dBc & spurious -100 dBc

  The development in I.C. technology provide the simplicity in the design of frequency synthesizer because it implements the phase frequency detector(PFD) , prescalar &  reference divider in single chip. Therefore our system consists of  a single chip contains (low phase noise PFD, charge pump, prescalar  & reference divider), voltage controlled oscillator , loop filter & reference oscillator. The single chip

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 30 2014
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Performance Evaluation of Three Phase Spray Direct Contact Heat Exchanger
...Show More Authors

 

The present investigation deals with experimental study of three-phase direct-contact heat exchanger, for water-Freon R11 system, where water is the continuous phase (liquid) and Freon R11 (liquid-gas) is the dispersed phase. The test section consisted of a cylindrical Perspex column with inner diameter 8cm and 1.2m long, in which, water was to be confined. Liquid Freon R11 drops were injected into the hot water filled column, through a special design of distributors at the bottom of the column. The liquid Freon R11 drops rose on their way up and evaporated into two-phase bubbles at atmospheric pressure. The study was devoted to express the effect of process variables such as c

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 01 2020
Journal Name
International Journal Of Engineering Business Management
Using ANN in emergency reconstruction projects post disaster
...Show More Authors

The purpose of this study is to avoid delays and cost changes that occur in emergency reconstruction projects especially in post disaster circumstances. This study is aimed to identify the factors that affect the real construction period and the real cost of a project against the estimated period of construction and the estimated cost of the project. The case study is related to the construction projects in Iraq. Thirty projects in different areas of construction in Iraq were selected as a sample for this study. Project participants from the projects authorities provided data about the projects through a data collection distributed survey made by the authors. Mathematical data analysis was used to construct a model to predict change

... Show More
View Publication
Scopus (5)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
New cost control techniques in mega construction projects
...Show More Authors

View Publication
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Thu Feb 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Post-evaluation of the strategic projects of the Directorate of Public Municipalities - Case study for the period (2004-2015
...Show More Authors

The research aims at conducting a follow-up evaluation of a number of strategic projects implemented by the Directorate of Public Municipalities, one of the Ministry of Construction, Housing and Municipalities and Public Works. The sample included (35) varied strategic projects implemented in most Iraqi governorates. Buildings, municipal buildings, minarets, massacres, multi-story parking, paving and rehabilitation of streets and residential neighborhoods. The difference between the actual and planned times and costs of these projects was then measured and analyzed. These projects were used as a tool for collecting data and information. The questionnaire included four axes, each representing one of the parties to the project, whi

... Show More
View Publication Preview PDF
Crossref