Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the relation between these factors using Analytic Hierarchy Process (AHP) method. Final conclusions and recommendations were extracted for better elemental estimation accuracy in project management.
This research set to indicate the role of the opportunity cost in the overall economic development (human and social development) by selecting the most appropriate alternative for the growth of the country in exchange for sacrificing profit limits to achieve this growth and development of the country, especially in the present circumstances of the country and after studying the reality of the economic case for him, as the problem lies with don't selecting the best alternative that enhances the gross domestic product, which extends to promote overall economic development and revive the industrial and agricultural sectors, productivity is more like Impotent, versus sacrifice alternative consumption may bring more financially lucrative than
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreIncremental sheet metal forming is a modern technique of sheet metal forming in which a uniform sheet is locally deformed during the progressive action of a forming tool. The tool movement is governed by a CNC milling machine. The tool locally deforms by this way the sheet with pure deformation stretching. In SPIF process, the research is concentrate on the development of predict models for estimate the product quality. Using simulated annealing algorithm (SAA), Surface quality in SPIF has been modeled. In the development of this predictive model, spindle speed, feed rate and step depth have been considered as model parameters. Maximum peak height (Rz) and Arithmetic mean surface roughness (Ra) are used as response parameter to assess th
... Show More
Multipoint forming process is an engineering concept which means that the working surface of the punch and die is produced as hemispherical ends of individual active elements (called pins), where each pin can be independently, vertically displaced using a geometrically reconfigurable die. Several different products can be made without changing tools saved precious production time. Also, the manufacturing of very expensive rigid dies is reduced, and a lot of expenses are saved. But the most important aspects of using such types of equipment are the flexibility of the tooling. This paper presents an experimental investigation of the effect of three main parameters which are blank holder, rubber thickness and forming speed th
... Show MoreBackground: The purpose of this study is to investigate the relationship between the roots of the maxillary posterior teeth and the maxillary sinus using spiral computed tomography, and measured the distances between the roots of the maxillary posterior teeth and the sinus floor. Materials and Methods: The sample of the present study was a total of 120 Iraqi subject (60 males & 60 females) aged (20-60) years old, who admitted to spiral Computed Tomography scan unit in AL-Zahraa hospital in AL-Kut city to have Computed Tomography scan of the brain and paranasal sinuses who had complaints of headaches or with suspicion of sinusitis but without pathological findings in maxillary sinuses. From November 2012 to April 2013, CT sagittal reconstruc
... Show MoreThe research material was prune plums (
The research material was prune plums (
The Strategy of employees' empowerment, organizational performance and total quality management represent three informative which were and still the hub of many studies and researches including the current study. The higher education is considered one of the most important services sectors and the main development as well as the civil progress in the society. It is the main source that provides the organizations with the human resources having scientific or practical professions. So Higher Education has been chosen especially Baghdad University as a sample of the study. The study problem is concentrated to find answers of the following questions: What the level of the powers mandate in the organization concerning the
... Show More