Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was (26.24%), and (5.5%), and AA was (74%), and (94.5%), for cost and time model, respectively. The researcher concluded that the ANN model has a strong correlation and high accuracy, indicating that these models are characterized by high efficiency and good performance in predicting cost and time.
The research aims to determine the strength of the relationship between time management and work pressure and administrative leadership, where he was taken a sample of (47) of the administrative leadership at the Higher Institute of security and administrative development in the Ministry of Interior was used questionnaire as a key tool in collecting data and information and analyzed the answers to the sample surveyed by using Statistical program (spss) in the arithmetic mean of the calculation and test (t) and the correlation coefficient, the research found the most important results: the existence of significant moral positive relationship between both time management and work pressure and administrative leadership, the leadership of th
... Show MoreThe aim of the research is to determine the impact of evaluating the investment projects in the development and preparation of investment budgets prepared by the economic units, since the investment projects are of an important and vital nature of the economic units, because these projects include the length of time for preparation and implementation and the accompanying period of this risk and uncertainties as well as need To the many funds to complete the project , The process of evaluating the implemented projects, which have been prepared an investment budget previously will contribute to the extent of matching the estimated data with the actual results or deviations, which is a step to avoid these errors in future p
... Show MoreSoil pH is one of the main factors to consider before undertaking any agricultural operation. Methods for measuring soil pH vary, but all traditional methods require time, effort, and expertise. This study aimed to determine, predict, and map the spatial distribution of soil pH based on data taken from 50 sites using the Kriging geostatistical tool in ArcGIS as a first step. In the second step, the Support Vector Machines (SVM) machine learning algorithm was used to predict the soil pH based on the CIE-L*a*b values taken from the optical fiber sensor. The standard deviation of the soil pH values was 0.42, which indicates a more reliable measurement and the data distribution is normal.
Prediction of daily rainfall is important for flood forecasting, reservoir operation, and many other hydrological applications. The artificial intelligence (AI) algorithm is generally used for stochastic forecasting rainfall which is not capable to simulate unseen extreme rainfall events which become common due to climate change. A new model is developed in this study for prediction of daily rainfall for different lead times based on sea level pressure (SLP) which is physically related to rainfall on land and thus able to predict unseen rainfall events. Daily rainfall of east coast of Peninsular Malaysia (PM) was predicted using SLP data over the climate domain. Five advanced AI algorithms such as extreme learning machine (ELM), Bay
... Show MoreThe problem of the study was to identify the possibility of benefiting from the application of the target cost system as a modern cost system to activate the environmental cost management instead of the traditional systems used in the company due to the great transformations witnessed by the business environment in all fields, which have resulted in the search for modern systems to provide more accurate and more appropriate information to reduce Costs, because accurate information makes the company have a complete vision to achieve the company’s goals. To solve this problem, the research was based on the following hypothesis (that the role of the target cost system leads to the activation of environmental cost management). Target c
... Show MoreRecently, the theory of Complex Networks gives a modern insight into a variety of applications in our life. Complex Networks are used to form complex phenomena into graph-based models that include nodes and edges connecting them. This representation can be analyzed by using network metrics such as node degree, clustering coefficient, path length, closeness, betweenness, density, and diameter, to mention a few. The topology of the complex interconnections of power grids is considered one of the challenges that can be faced in terms of understanding and analyzing them. Therefore, some countries use Complex Networks concepts to model their power grid networks. In this work, the Iraqi Power Grid network (IPG) has been modeled, visua
... Show MoreSuffer most of the industrial sector companies from high Kperfi magnitude of the costs of industrial indirect, lack of equitable distribution of these costs on the objectives of cost, increased competition, and the lack of proper planning in line and changes faced by the industrial sector (general) and sample (private), as well as the difficulty in re- directing efforts to improve profitability and in-depth analysis of activities, and to identify untapped resource activities, then link these activities to the final products The research aims to apply the technology review and evaluate programs with the method (ABC) through the application stages of planning, scheduling and control and a comparison to get to the products of dev
... Show MoreBACKGROUND: The degree of the development of coronary collaterals is long considered an alternate – that is, a collateral – source of blood supply to an area of the myocardium threatened with vascular ischemia or insufficiency. Hence, the coronary collaterals are beneficial but can also promote harmful (adverse) effects. For instance, the coronary steal effect during the myocardial hyperemia phase and that of restenosis following coronary angioplasty. OBJECTIVES: Our study explores the contribution of coronary collaterals – if any exist – while considering other potential predictors, including demographics and medical history, toward the left ventricular (LV) dysfunction measured through the LV ejection fraction (LVEF). METH
... Show MoreOver application courier company (DHL) to keep the quality of service to achieve customer satisfaction the adoption of precedence delivery time - A prospective study))
Become attention to quality is a global phenomenon, and I took organizations and governments around the world attaches special attention, but we can say that quality has become the first function for many organizations, and has become a management philosophy
The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show More