Preferred Language
Articles
/
joe-1641
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was (26.24%), and (5.5%), and AA was (74%), and (94.5%), for cost and time model, respectively. The researcher concluded that the ANN model has a strong correlation and high accuracy, indicating that these models are characterized by high efficiency and good performance in predicting cost and time.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Mar 05 2025
Journal Name
Lecture Notes In Networks And Systems
Using Artificial Intelligence to Enhance Family Cohesion and Promote Positive Social Values
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Sun Jun 30 2024
Journal Name
International Journal Of Intelligent Engineering And Systems
Development of Intelligent Control Strategy for an Anesthesia System Based on Radial Basis Function Neural Network Like PID Controller
...Show More Authors

View Publication
Scopus (3)
Scopus Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman

... Show More
View Publication Preview PDF
Publication Date
Thu Dec 01 2022
Journal Name
Kirkuk University Journal For Agricultural Sciences
Contributions of small income-generating projects to the empowerment of rural women socially and economically in Al-Hamdaniya District / Nineveh Governorate
...Show More Authors

The current research aims to identify the contributions of small income-generating projects in theempowerment of rural women in Nineveh Governorate ,Al-Hamdaniya district, as a simplerandom sample was drawn from the research community of 280 respondents , according to theRobert Mason equation at the level of significance 0.05, so the sample size was 162 respondents,i.e. a percentage 58% collected the necessary data using a questionnaire prepared as a basic toolfor data collection consisting of 20 items distributed on two axes ,and the results of the researchwere analyzed and presented using the spss statistical program, as well as manual analysis usingrepetitions, the weighted mean, the standard deviation, and the percentage weight. And the

... Show More
View Publication Preview PDF
Publication Date
Sun Oct 01 2017
Journal Name
International Journal Of Hydrogen Energy
Determination of best possible correlation for gas compressibility factor to accurately predict the initial gas reserves in gas-hydrocarbon reservoirs
...Show More Authors

Gas compressibility factor or z-factor plays an important role in many engineering applications related to oil and gas exploration and production, such as gas production, gas metering, pipeline design, estimation of gas initially in place (GIIP), and ultimate recovery (UR) of gas from a reservoir. There are many z-factor correlations which are either derived from Equation of State or empirically based on certain observation through regression analysis. However, the results of the z-factor obtained from different correlations have high level of variance for the same gas sample under the same pressure and temperature. It is quite challenging to determine the most accurate correlation which provides accurate estimate for a range of pressures,

... Show More
View Publication
Scopus (31)
Crossref (32)
Scopus Clarivate Crossref
Publication Date
Wed May 10 2023
Journal Name
Journal Of Engineering
A Proposal Algorithm to Solve Delay Constraint Least Cost Optimization Problem
...Show More Authors

Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).

View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Oct 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Evaluate the implementation of the investment plan projects A study on the field of the plan projects for the period 2013-2016
...Show More Authors

The main problem of this research is the delay of implementation of the investment plan projects for the period (2013-2016) and the weakness of the staff ability in the ministries and they don’t have the sufficient experience to carry out the implementation process.

Therefore, the research aims to evaluate the implementation of programs and projects of the investment plan in a manner consistent with the objectives set for them without any wasteful of efforts, time and money. And then identify the problems and obstacles to determine the deviations of the implementation of the specific for each sector according to the criteria of evaluation and the form of cost, quality, time and implementation.<

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Jun 28 2023
Journal Name
Al–bahith Al–a'alami
Is it Time to Develop Government Communication Functions?
...Show More Authors

Embracing digital technological advancements in media and communication has led government entities to adopt communication practices fully aligned with the digital and networked system in government communication. Traditional media practices within the government environment increasingly rely on the ability to utilize digital tools and systems for content creation, communication, evaluation, and the management of the entire communication process within an electronic and intelligent framework for government services. Naturally, this transformation has caught the attention of communication and public relations researchers worldwide, as the digital and networked aspects of government communication now form an intelle

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Feb 01 2020
Journal Name
Journal Of Economics And Administrative Sciences
Applying some hybrid models for modeling bivariate time series assuming different distributions for random error with a practical application
...Show More Authors

Abstract

  Bivariate time series modeling and forecasting have become a promising field of applied studies in recent times. For this purpose, the Linear Autoregressive Moving Average with exogenous variable ARMAX model is the most widely used technique over the past few years in modeling and forecasting this type of data. The most important assumptions of this model are linearity and homogenous for random error variance of the appropriate model. In practice, these two assumptions are often violated, so the Generalized Autoregressive Conditional Heteroscedasticity (ARCH) and (GARCH) with exogenous varia

... Show More
View Publication Preview PDF
Crossref