Wastewater projects are one of the most important infrastructure projects, which require developing strategic plans to manage these projects. Most of the wastewater projects in Iraq don’t have a maintenance plan. This research aims to prepare the maintenance management plan (MMP) for wastewater projects. The objective of the research is to predict the cost and time of maintenance projects by building a model using ANN. The research sample included (15) completed projects in Wasit Governorate, where the researcher was able to obtain the data of these projects through the historical information of the Wasit Sewage Directorate. In this research artificial neural networks (ANN) technique was used to build two models (cost and time) for the maintenance of wastewater projects. The output shows there is a high correlation (R) between real and expected cost with 95.4%, minimized testing error (8.5%), and training error (19%). The mean absolute present error (MAPE) and Average Accuracy Percentage (AA) are (13.9% and 86.1%) respectively. Also, the results showed a strong correlation (R) between actual and predicted time (99.1%), minimized testing error (8%), and an additional MAPE% and AA% with (11.7% and 88.3%) respectively. These models are in agreement with the real values, as well as gives good prediction for future maintenance projects.
Between the 1980s and 1990s, the HURIER model was developed by Brownell and consist of six interrelated components, which are represented in these acronyms (Hearing, Understanding, Remembering, Interpreting, Evaluating, and Responding). This model can be considered as a framework of the behavioral approach which can be used to improve students’ listening performance and to foster a positive attitude toward listening. Many learners find it challenging to improve their listening skills when learning a second or foreign language because it requires the integration of both listening and speaking. Consequently, enhancing this skill will help students improve other language skills, including reading, speaking, and writing. The HURI
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreAbstract:
Sought the search to find out what small businesses, the importance of funding, and the role of funders in supporting such projects, which have been addressed in the search through a sample of government banks (Rafidain and Rasheed) and private banks (the Middle East, the Gulf, North, Assyria) and a sample of Small projects borrowed from these banks, but in order to achieve that rely researchers on scientific methods discreet marked by the curriculum descriptive analytical method which is based on the compilation of facts and information then collated and analyzed to reach acceptable results, as well as data collection tool (checklist) was whereby examine questions of a sample of
... Show MoreThe construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.
The question is, was the optimum implementation accomplished? The provision for the success of the project
... Show MoreReconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreGeologic modeling is the art of constructing a structural and stratigraphic model of a reservoir from analyses and interpretations of seismic data, log data, core data, etc. [1].
A static reservoir model typically involves four main stages, these stages are Structural modeling, Stratigraphic modeling, Lithological modeling and Petrophysical modeling [2].
Ismail field is exploration structure, located in the north Iraq, about 55 km north-west of Kirkuk city, to the north-west of the Bai Hassan field, the distance between the Bai Hassan field and Ismael field is about one kilometer [3].
Tertiary period reservoir sequences (Main Limestone), which comprise many economica
... Show More