The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of a construction project, this study constructed the matrix of probability and impact variables and put the periods based on the risk score. Finally, this study identified a fourth main risk group and twenty-two sub-risk factors that are appropriate for the tendering phase of construction projects in Iraq
A (k,n)-arc is a set of k points of PG(2,q) for some n, but not n + 1 of them, are collinear. A (k,n)-arc is complete if it is not contained in a (k + 1,n)-arc. In this paper we construct complete (kn,n)-arcs in PG(2,5), n = 2,3,4,5, by geometric method, with the related blocking sets and projective codes.
This Research aim to identify the factors affecting the strategic implementation of sewage projects and to seek to activate the real follow-up of projects to identify the factors that accompany their implementation, The study included a sample of the projects of the investment plan implemented for the Directorate General of sewage in the governorates of Iraq, which was completed during the six years period (2010-2016). The sample of the research was four projects: The project of implementation and processing of the treatment plant and the lifting station and the conveyor line for the project of IMARA/The third stage/Al-Sanaf marshland , The project of the processing and implementation of the treatment plant with the
... Show MoreThe research aims to derive the efficient industrial plans for Al – shaheed public company under risk by using Target MOTAD as a linear alternative model for the quadratic programming models.
The results showed that there had been a sort of (trade- off) between risk and the expected gross margins. And if the studied company strives to get high gross margin, it should tolerate risk and vice versa. So the management of Al- Shaheed Company to be invited to apply the suitable procedures in the production process, in order to get efficient plans that improves it's performance .
The study aimed to measure the effect of applying the disclosure and transparency standards criteria adopted by the Saudi Arabian Monetary Authority on improving performance indicators in the Saudi banking sector, by measuring the extent of the impact of the bank's financial indicators represented by liquidity, profitability and return on assets in Saudi banks by applying the criteria of disclosure and transparency, which is one of the Main principles in the list of governance, which was approved by the Saudi Arabian Monetary Authority. The analytical approach was followed to achieve the goal of the study, as the financial statements of Saudi banks were analyzed during a period of 8-year to test four hypotheses related to measuri
... Show MoreThe aim of this study is to achieve the best distinguishing function of the variables which have common characteristics to distinguish between the groups in order to identify the situation of the governorates that suffer from the problem of deprivation. This allows the parties concerned and the regulatory authorities to intervene to take corrective measures. The main indicators of the deprivation index included (education, health, infrastructure, housing, protection) were based on 2010 data available in the Central Bureau of Statistics
This study aimed at an analytical comparison of the Internal Auditing Standards issued by the Institute of Internal Auditors (IIA) and the Guidance Manual for Audit Units issued by the Federal Audit Bureau to show the compatibility and differences between them and the possibility of applying the IIA standards to economic units in Iraq. The guideline was generally not covered by all the internal audit units. There is a lack of keeping pace with changes in internal auditing at the international level and there is a need to strengthen the Guideline on Internal Auditing Standards II A), which is characterized by the preparation of an internal document containing the objectives, powers and responsibilities of the internal audit work as well a
... Show MoreFinancial funding of a construction firm plays an important role in all aspects of the process development. It has been noted that financial crises have a direct impact on the construction industry. The Iraqi government, whether locally or globally, has faced a severe shortage of financing which has resulted in incomplete projects. Due to the financial crisis that Iraq went through which led to the suspension of many residential complex projects and the difficulty of the use of public financing methods, we researched the private financing (public-private partnership) methods instead of public financing methods in residential complex projects implementation. This study verified the financial problems and the factors that relate to th
... Show More