The hydraulic behavior of the flow can be changed by using large-scale geometric roughness elements in open channels. This change can help in controlling erosions and sedimentations along the mainstream of the channel. Roughness elements can be large stone or concrete blocks placed at the channel's bed to impose more resistance in the bed. The geometry of the roughness elements, numbers used, and configuration are parameters that can affect the flow's hydraulic characteristics. In this paper, velocity distribution along the flume was theoretically investigated using a series of tests of T-shape roughness elements, fixed height, arranged in three different configurations, differ in the number of lines of roughness element. These elements were used to find the best configuration of roughness elements that can be applied to change the flow's hydraulic characteristics. ANSYS Parametric Design Language, APDL, and Computational Fluid Dynamics, CFD, was used to simulate the flow in an open channel with roughness elements. CFD can be used to study the hydrodynamics of open channels under different conditions with inclusive details rather than relying on the costly field and time-consuming. Runs were implemented with different conditions, the discharge, and water depth in upstream and downstream of the flume. T-shape roughness elements with height equal to 3cm placed in three different configurations, two lines, four lines, and fully rough configurations were tested. The results show that the effect of roughness elements increasing with increasing the number of lines of roughness elements. Cases of four lines and fully rough configurations have almost the same hydraulic performance by having the same results of the velocity decrease percentage, which is decreased by approximately about 66% and 61% of the control case's velocity in the zone near the roughness elements consequently. But the difference is that four lines configuration is affected in a part of the test section. This behavior increases the velocity values by about 11% in the other side and by about 10% near the free surface in the case of four lines configuration and increased by about 32% above the roughness elements in a fully rough configuration.
Furfural is one of the one of pollutants in refinery industrial wastewaters. In this study advanced oxidation process using UV/H2O2 was investigated for furfural degradation in synthetic wastewater. The results from the experimental work showed that the degradation of furfural decreases as its concentration increases, reaching 100% at 50mg/l furfural concentration and increasing the concentration of H2O2 from 250 to 500 mg/l increased furfural removal from 40 to 60%.The degradation of furfural reached 100% after 90 min exposure time using two UV lamps, where it reached 60% using one lamp after 240 min exposure time. The rate of furfural degradation k increased at the pH and initial concentratio
... Show MoreAll-optical canonical logic units at 40 Gb/s using bidirectional four-wave mixing (FWM) in highly nonlinear fiber are proposed and experimentally demonstrated. Clear temporal waveforms and correct pattern streams are successfully observed in the experiment. This scheme can reduce the amount of nonlinear devices and enlarge the computing capacity compared with general ones. The numerical simulations are made to analyze the relationship between the FWM efficiency and the position of two interactional signals. © 2015 Chinese Laser Press
Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul
Data centric techniques, like data aggregation via modified algorithm based on fuzzy clustering algorithm with voronoi diagram which is called modified Voronoi Fuzzy Clustering Algorithm (VFCA) is presented in this paper. In the modified algorithm, the sensed area divided into number of voronoi cells by applying voronoi diagram, these cells are clustered by a fuzzy C-means method (FCM) to reduce the transmission distance. Then an appropriate cluster head (CH) for each cluster is elected. Three parameters are used for this election process, the energy, distance between CH and its neighbor sensors and packet loss values. Furthermore, data aggregation is employed in each CH to reduce the amount of data transmission which le
... Show MoreThe research aims to evaluate the suppliers at Diyala general electric industries company conducted in an environment of uncertainty and fuzzy where there is no particular system followed by the company, and also aims to use the problem of traveling salesman problem in the process of transporting raw materials from suppliers to the company in a fuzzy environment. Therefore, a system based on mathematical methods and quantity was developed to evaluate the suppliers. Fuzzy inference system (FIS) and fuzzy set theory were used to solve this problem through (Matlab) and the problem of the traveling salesman in two stages was also solved by the first stage of eliminating the fuzzing of the environment using the rank function method, w
... Show MoreOptimizing system performance in dynamic and heterogeneous environments and the efficient management of computational tasks are crucial. This paper therefore looks at task scheduling and resource allocation algorithms in some depth. The work evaluates five algorithms: Genetic Algorithms (GA), Particle Swarm Optimization (PSO), Ant Colony Optimization (ACO), Firefly Algorithm (FA) and Simulated Annealing (SA) across various workloads achieved by varying the task-to-node ratio. The paper identifies Finish Time and Deadline as two key performance metrics for gauging the efficacy of an algorithm, and a comprehensive investigation of the behaviors of these algorithms across different workloads was carried out. Results from the experiment
... Show MorePerchloroethylene (PERC) is commonly used as a dry-cleaning solvent, it is attributed to many deleterious effects in the biological system. The study aimed to investigate the harmful effect associated with PERC exposure among dry-cleaning workers. The study was carried out on 58 adults in two groups. PERC-exposed group; include thirty-two male dry-cleaning workers using PERC as a dry-cleaning solvent and twenty-six healthy non-exposed subjects. History of PERC exposure, use of personal protection equipment (PPE), safety measurement of the exposed group was recorded. Blood sample was taken from each participant for measurement of hematological markers, liver and kidney function tests. The results showed that 28.1% of the workers were usin
... Show MoreLoanwords are the words transferred from one language to another, which become essential part of the borrowing language. The loanwords have come from the source language to the recipient language because of many reasons. Detecting these loanwords is complicated task due to that there are no standard specifications for transferring words between languages and hence low accuracy. This work tries to enhance this accuracy of detecting loanwords between Turkish and Arabic language as a case study. In this paper, the proposed system contributes to find all possible loanwords using any set of characters either alphabetically or randomly arranged. Then, it processes the distortion in the pronunciation, and solves the problem of the missing lette
... Show More