The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in their models or included a schedule of borrowed money and a repayment schedule with interest rates. The aim of this study is not only to eliminate the shortcomings of previous studies but also to incorporate a financing optimization model for various funding alternatives available to contractors in terms of funding sources and forms, cash provision times, interest rates and repayment options. This work proposes a financing optimization model, not only to remove the limitations but also to find optimal financing costs while offering the financing schedule without increasing the project duration and adjusting the starting times of the activities.
ABSTRICT:
This study is concerned with the estimation of constant and time-varying parameters in non-linear ordinary differential equations, which do not have analytical solutions. The estimation is done in a multi-stage method where constant and time-varying parameters are estimated in a straight sequential way from several stages. In the first stage, the model of the differential equations is converted to a regression model that includes the state variables with their derivatives and then the estimation of the state variables and their derivatives in a penalized splines method and compensating the estimations in the regression model. In the second stage, the pseudo- least squares method was used to es
... Show MoreIn this work the effect of choosing tri-circular tube section had been addressed to minimize the end effector’s error, a comparison had been made between the tri-tube section and the traditional square cross section for a robot arm, the study shows that for the same weight of square section and tri-tube section the error may be reduced by about 33%.
A program had been built up by the use of MathCAD software to calculate the minimum weight of a square section robot arm that could with stand a given pay load and gives a minimum deflection. The second part of the program makes an optimization process for the dimension of the cross section and gives the dimensions of the tri-circular tube cross section that have the same weight of
... Show MoreLiquid membrane electrodes for the determination iron(III) were constructed based on chloramphenicol sodium succinate and iron(III) CPSS-Fe(III) as ion pair complex, with four plasticizers Di-butyl phosphate (DBP); Di-butyl phthalate (DBPH); Di-octyl phthalate (DOP); Tri-butyl phosphate (TBP); in PVC matrix . These electrodes give Nernstian and sub-Nernstian slopes (19.79, 24.60, 16.01 and 13.82mV/decade) and linear ranges from (1x10-5-1x10-2 M, 1x10-5-1x10-2 M, 1x10-6-1x10-2 M and 1x10-5-1x10-2 M) respectively. The best electrode was based on DBP plasticizer which gave a slope 19.79 mV/decade, correlation coefficient 0.9999, detection limit of 9×10-6 M, lifetime 37 day displayed good stability and reproducibility and used to determine
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreForm of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo
... Show MoreAbstract
Uncertainty, the deeply-rooted fact that surrounding the investment environment, especially the stock market which just prices have taken a specific trend until they moved to another one for its up or down. This means that the volatility characteristic of financial market requires the rational investor an argument led towards the adoption of planned acts to gain greater benefit in the goal of wealth maximizing. There is no possibility to achieve this goal without the burden of uncertainty and the risk of systematic fluctuations of investment returns in the financial market after the facts of efficient diversification have pro
... Show MoreThe construction industry presents significant high risks of injury and fatality to its workforce. Adopting prevention through design (PtD) principles is reported to have high potential for mitigating such risks and improving safety outcomes. PtD seeks to assess and reduce workplace hazards during the design phase, minimizing unsafe construction conditions. Despite its potential benefits, the construction industry encounters challenges in effectively utilizing PtD. Thus, the implementation of PtD in the US construction industry is limited, and designers’ awareness remains low. This evident lack of utilization warrants further examination of the contributing factors. The goal of this study is to identify and rank PtD utilization ba