Background: Acute cholecystitis is common surgical
problem, which was treated previously by conservative
treatment .Later early open has been introduced as an
alternative to interval for treatment of acute cholecystitis.
Early open was found to be a safe, successful with
comparable postoperative complication rate. With the
advent of laparoscopy laparoscopic have been used for
chronic cholecystitis and became the first line of
treatment. New reports have shown that laparoscopic can
be used as an alternative to open for surgical treatment of
acute cholecystitis.
Objectives: to compare the success, safety of early
laparoscopic versus early open as a primary treatment of
acute cholecystitis.
Methods: out of 68 patients were treated for clinical
acute cholecystitis between January 2002 and February
2004 in the department of surgery, at Al – Kindy teaching
hospital. A total of 62 patients underwent early for acute
cholecystitis as soon as possible after diagnosis. The
preferred preoperative imaging technique was ultrasound.
30 (48.3%) of the operations were attempted
laparoscopically, whereas the remaining 32 patients
(51.7%) underwent initial open .
Results: The mean operative time for the open cases
was 75 minutes versus 60 minutes for the laparoscopic
group. There was no perioperative mortality in either
group. The incidence of conversion to open was 10% (3
patients). Surgical complications related to laparoscopic
and open occurred in 2 (6.6%) and 3 (9.3%) cases,
respectively. There was no difference between the open
and laparoscopic groups in regard to the major
postoperative complications.
Conclusion: The current study shows that early
(whether performed by open or laparoscopically) is a
safe and effective treatment for acute cholecystitis. Low
conversion rates can be maintained with strict guidelines
for appropriate patient selection, adequate experience,
and proper laparoscopic technique.
This paper predicts the resilient modulus (Mr) for warm mix asphalt (WMA) mixtures prepared using aspha-min. Various predictor variables were analyzed, including asphalt cement types, asphalt contents, nominal maximum aggregate sizes (NMAS), filler content, test temperatures, and loading times. Univariate and multivariate analyses were conducted to examine the behavior of each predictor variable individually and collectively. Through univariate analysis, it was observed that Mr exhibited an inverse trend with asphalt cement grade, NMAS, test temperature, and load duration. Although Mr increased slightly with higher filler and asphalt content, the magnitude of this increase was minimal. Multivariate analysis revealed that the rate of change
... Show MoreThe finishing operation of the electrochemical finishing technology (ECF) for tube of steel was investigated In this study. Experimental procedures included qualitative
and quantitative analyses for surface roughness and material removal. Qualitative analyses utilized finishing optimization of a specific specimen in various design and operating conditions; value of gap from 0.2 to 10mm, flow rate of electrolytes from 5 to 15liter/min, finishing time from 1 to 4min and the applied voltage from 6 to 12v, to find out the value of surface roughness and material removal at each electrochemical state. From the measured material removal for each process state was used to verify the relationship with finishing time of work piece. Electrochemi
Recovery of time-dependent thermal conductivity has been numerically investigated. The problem of identification in one-dimensional heat equation from Cauchy boundary data and mass/energy specification has been considered. The inverse problem recasted as a nonlinear optimization problem. The regularized least-squares functional is minimised through lsqnonlin routine from MATLAB to retrieve the unknown coefficient. We investigate the stability and accuracy for numerical solution for two examples with various noise level and regularization parameter.
In this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje
... Show MoreThe petrophysical analysis is significant to determine the parameters controlling the production wells and the reservoir quality. In this study, Using Interactive petrophysics software to analyze the petrophysical parameters of five wells penetrated the Zubair reservoir in the Abu-Amood field to evaluate a reservoir and search for hydrocarbon zones. The available logs data such as density, sonic, gamma ray, SP, neutron, and resistivity logs for wells AAm-1, AAm-2, AAm-3, AAm-4, and AAm-5 were used to determine the reservoir properties in Zubair reservoir. The density-neutron and neutron-sonic cross plots, which appear as lines with porosity scale ticks, are used to distinguish between the three main lithologies of sandstone, limesto
... Show More: In this study, a linear synchronous machine is compared with a linear transverse flux machine. Both machines have been designed and built with the intention of being used as the power take off in a free piston engine. As both topologies are cylindrical, it is not possible to construct either using just flat laminations and so alternative methods are described and demonstrated. Despite the difference in topology and specification, the machines are compared on a common base in terms of rated force and suitability for use as a generator. Experience gained during the manufacture of two prototypes is described.
This investigation was conducted to recognize the structure for (RHETI version 2.5 1999) by using exploratory and confirmatory factor analysis. Sample of (620) student of Al-Mustansrya University were administered the (RHETI).
The data of their responses was analyzed by using (PAF) and oblique rotating .
The findings explored (9) factors as one factor for each type and (184) items were loaded by the factors: (60) item for feeling center, (61) items for instinctive center and (63) items for thinking center.
Results of confirmatory factorial analysis supported a model designed by the researcher depended upon a theoretical views of Riso and Hudson
... Show More