Objective: Aimed to asses the role of PT estimation in early diagnosis and predicting the extent and the outcome of head injury with ICerH and/ or Contusion
Method :PT was measured by Digiclot 818
Group –1: One hundred consecutive head injured patients admitted at Neurosurgical and Al Ramadi teaching hospitals were initially estimated for prothrombin time and subsequently scanned
Group-2 : Two hundred twenty five consecutive non scanned head injured patients admitted to Neurosurgical and Al Ramadi teaching hospitals were estimated with prothrombin time at the time of insult and subsequently for the next two weeks Al – Kindy Col Med J 2012; Vol. 8 No. 1 P: 54
Clinical and neurological evaluation (GCS) score in addition to computerized tomography scan was done for both groups
Result :Group -1: Twenty eight (28%) of the initially estimated head injured patients had prolonged prothrombin time in which their subsequent CT scan revealed an ICer H and/or contusion
Seventy six (76%) percent of those with severely head injured patients (GCS≤8) were having an initial prothrombin time prolongation..While those with mild head injury (GCS≥12) only thirty (30%) of them were having the initial prothrombin time prolongation
Group-2 Those patients who survived the initial insult and subsequently thereafter (surgically or conservatively treated) even with a deficit.. Daily estimation of prothrombin time showed a decline within the 7-14 days
Those patients who finally died (surgically or conservatively treated) daily estimation of prothrombin time showed a persistent elevation or a fluctuation within the next 7-14 day
Conclusion Prothrmbin time is an important
parameter in :
1-Reflecting the severity of head injury (GCS)
3-Early detection of ICerH and /or contusion
2-Prognostic value in cases of of ICerH and /or contusion
Abb : ICerH = Intracerebral hematomas,SDH=subdural hematomas,EDH=epidural hematomas,SAH=subarachnoid hemorrhages,PT=Prothrombin time,Pts=Patients,CT scan=computarized tomography.
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreGlobal Navigation Satellite Systems (GNSS) have become an integral part of wide range of applications. One of these applications of GNSS is implementation of the cellular phone to locate the position of users and this technology has been employed in social media applications. Moreover, GNSS have been effectively employed in transportation, GIS, mobile satellite communications, and etc. On the other hand, the geomatics sciences use the GNSS for many practical and scientific applications such as surveying and mapping and monitoring, etc.
In this study, the GNSS raw data of ISER CORS, which is located in the North of Iraq, are processed and analyzed to build up coordinate time series for the purpose of detection the
... Show MoreEmpirical equations for estimating thickening time and compressive strength of bentonitic - class "G" cement slurries were derived as a function of water to cement ratio and apparent viscosity (for any ratios). How the presence of such an equations easily extract the thickening time and compressive strength values of the oil field saves time without reference to the untreated control laboratory tests such as pressurized consistometer for thickening time test and Hydraulic Cement Mortars including water bath ( 24 hours ) for compressive strength test those may have more than one day.
study aimed to recognize The relationship between Intrinsic Motivation Academy and Time Management among University students and measure Intrinsic Motivation Academy And Time Management for sample and Balancing Degrees of Basic Research on the two scales According to the Variable genders and Specialization, The sample consisted (350) students by (230) female (120) male , and the sample responded scales of Intrinsic Motivation Academy for (Alwan & Attaat2009) and Time Management (Building tool), The Results of this study show that: There are statistically significant differences according to gender variable in Intrinsic Motivation Academy and Time Management in favor of the male, and there are statistica
... Show MoreThis study investigates the feasibility of a mobile robot navigating and discovering its location in unknown environments, followed by the creation of maps of these navigated environments for future use. First, a real mobile robot named TurtleBot3 Burger was used to achieve the simultaneous localization and mapping (SLAM) technique for a complex environment with 12 obstacles of different sizes based on the Rviz library, which is built on the robot operating system (ROS) booted in Linux. It is possible to control the robot and perform this process remotely by using an Amazon Elastic Compute Cloud (Amazon EC2) instance service. Then, the map to the Amazon Simple Storage Service (Amazon S3) cloud was uploaded. This provides a database
... Show MoreThe accurate 3-D coordinate's measurements of the global positioning systems are essential in many fields and applications. The GPS has numerous applications such as: Frequency Counters, Geographic Information Systems, Intelligent Vehicle Highway Systems, Car Navigation Systems, Emergency Systems, Aviations, Astronomical Pointing Control, and Atmospheric Sounding using GPS signals, tracking of wild animals, GPS Aid for the Blind, Recorded Position Information, Airborne Gravimetry and other uses. In this paper, the RTK DGPS mode has been used to create precise 3-D coordinates values for four rover stations in Baghdad university camp. The HiPer-II Receiver of global positioning system was used to navigate the coordinate value. The results wil
... Show MoreHigh vehicular mobility causes frequent changes in the density of vehicles, discontinuity in inter-vehicle communication, and constraints for routing protocols in vehicular ad hoc networks (VANETs). The routing must avoid forwarding packets through segments with low network density and high scale of network disconnections that may result in packet loss, delays, and increased communication overhead in route recovery. Therefore, both traffic and segment status must be considered. This paper presents real-time intersection-based segment aware routing (RTISAR), an intersection-based segment aware algorithm for geographic routing in VANETs. This routing algorithm provides an optimal route for forwarding the data packets toward their destination
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
The current research aims to recognize the exploratory and confirmatory factorial structure of the test-wiseness scale on a sample of Hama University students, using the descriptive method. Thus, the sample consists of (472) male and female students from the faculties of the University of Hama. Besides, Abu Hashem’s 50 item test-wiseness scale (2008) has been used. The validity and reliability of the items of the scale have also been verified, and six items have been deleted accordingly. The results of the exploratory factor analysis of the first degree have shown the presence of the following five acceptable factors: (exam preparation, test time management, question paper handling, answer sheet handling, and revision). Moreover,
... Show MoreAbstract
On 11/1/2008 amounts of snows fell on various sections of Iraq, one of
which is Baghdad. The analysis process of climatic maps proved that the
advance trough of Sudanese depression towards the city is the reason behind
the formation of this weather state supported by could trough in the (500) mb
pressure level. .
The research concluded that the phenomenon of global warming
witnessed by the world recently had a main role in the occurrence of this
phenomenon due to the raise in earth temperature as a result of evaporation
rate increase leading to an increase in water vapor and cloud formation with
high tops and low bases which form sows with high rates accumulating at high
and moderate latitudes le