The way used to estimate the fuzzy reliability differs according to the nature of the information of failure time which has been dealt in this research.The information of failure times has no probable distribution to explain it , in addition it has fuzzy quality.The research includes fuzzy reliability estimation of three periods ,the first one from 1986 to 2013,the second one from 2013 to 2033 while the third one from 2033 to 2066 .Four failure time have been chosen to identify the membership function of fuzzy trapezoid represented in the pervious years after taking in consideration the estimation of most researchers, proffional geologists and the technician who is incharge of maintaining of Mosul Dam project. By using matlab programme , acpecial programme of research was designed to estimate the fuzzy reliability of last three periods ,according to the results it was found that fuzzy reliability of Al.mosul dam in the recent time reaches to 0.5 approxmatly while the fuzzy reliability of Al.mosul dam after 20 years will reach to 0.1,ie, the danger of actual collapse of the dam will be in 2033 ,So that it is important to build a new dam making sure from chosing a suitable location with respect to soil quilty , geological and clamatic which suround the location , This is to avoid the same mistake which makes us lose 33 years from the hypothetical life time of Mosul dam according to the estimation of the company which build the dam.
The blade pitch angle (BPA) in wind turbine (WT) is controlled to maximize output power generation above the rated wind speed (WS). In this paper, four types of controllers are suggested and compared for BPA controller in WT: PID controller (PIDC), type-1 fuzzy logic controller (T1-FLC), type-2 fuzzy logic controller (T2-FLC), and hybrid fuzzy-PID controller (FPIDC). The Mamdani and Sugeno fuzzy inference systems (FIS) have been compared to find the best inference system used in FLC. Genetic algorithm (GA) and Particle swarm optimization algorithm (PSO) are used to find the optimal tuning of the PID parameter. The results of500-kw horizontal-axis wind turbine show that PIDC based on PSO can reduced 2.81% in summation error of power
... Show MoreThis work is concerned with designing two types of controllers, a PID and a Fuzzy PID, to be used
for flying and stabilizing a quadcopter. The designed controllers have been tuned, tested, and
compared using two performance indices which are the Integral Square Error (ISE) and the Integral
Absolute Error (IAE), and also some response characteristics like the rise time, overshoot, settling
time, and the steady state error. To try and test the controllers, a quadcopter mathematical model has
been developed. The model concentrated on the rotational dynamics of the quadcopter, i.e. the roll,
pitch, and yaw variables. The work has been simulated with “MATLAB”. To make testing the
simulated model and the controllers m
The current study included measuring the percent of protein in the extract of nematode Ascaridia galli that infect chickens, it was 1.157% and equivalent to 11.570 mg /L., as well as the amino acid analysis in the nematode A.galli by using a high-performance liquid chromatography technique (HPLC), as was detect five types for amino acids in this extract Leucine, Threonin, Serine, Methionine and Valine as the amount of these amino acids in the extract was as follows 132.973, 26.994, 10.453, 2.243 and 1.888 mg /L., respectively, and other amino acids which Glutamic, Histidine and Tyrosin did not exist in the nematode A.galli.
A dynamic analysis method has been developed to investigate and characterize embedded delamination on the dynamic response of composite laminated structures. A nonlinear finite element model for geometrically large amplitude free vibration intact plate and delamination plate analysis is presented using higher order shear deformation theory where the nonlinearity was introduced in the Green-Lagrange sense. The governing equation of the vibrated plate were derived using the Variational approach. The effect of different orthotropicity ratio, boundary condition and delamination size on the non-dimenational fundamental frequency and frequency ratios of plate for different stacking sequences are studied. Finally th
... Show Moreعند إطلالتنا على هذا البلد العربي لابد من التقصي ولو بعجاله عن اقتصاده وهو الاهم باعتبار ان الاقتصاد هو شريان الحياة لأي أمة فلا غنى ولا تهاون في نفس الوقت عن هذا الجانب المهم الذي يرتبط مدى تطوره بتطور البلد وهذا الاخير مرتبط بما متوفر لديه من موارد بشريه ومادية وان تفاوتت النسبة بينها فلا ضير في ذلك فالاهم هو وجود الموجه والمخطط بالاتجاه الصحيح نحو الاستغلال الامثل لهذه الموارد
(وان قلّتْ) وبالتالي
In this research, the problem of multi- objective modal transport was formulated with mixed constraints to find the optimal solution. The foggy approach of the Multi-objective Transfer Model (MOTP) was applied. There are three objectives to reduce costs to the minimum cost of transportation, administrative cost and cost of the goods. The linear membership function, the Exponential membership function, and the Hyperbolic membership function. Where the proposed model was used in the General Company for the manufacture of grain to reduce the cost of transport to the minimum and to find the best plan to transfer the product according to the restrictions imposed on the model.
Linguistic research according to modern curricula:
It is one of the important matters that occupy the ideas of those concerned with linguistic studies, whether Arabic or otherwise. Recent years have witnessed the advancement of this methodological approach, and books and studies in Arabic have been written on important, multifaceted issues, of grammatical and linguistic origins, and their balance with new developments and ideas attracted mostly from Western studies.
The comparative approach - as they call it - is one of the modern approaches that is based on balancing a language with other sisters belonging to its family, to reach similarities and differences between them, and to know the c
Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa