In this study, we used Bayesian method to estimate scale parameter for the normal distribution. By considering three different prior distributions such as the square root inverted gamma (SRIG) distribution and the non-informative prior distribution and the natural conjugate family of priors. The Bayesian estimation based on squared error loss function, and compared it with the classical estimation methods to estimate the scale parameter for the normal distribution, such as the maximum likelihood estimation and the moment estimation. Several cases from normal distribution for data generating, or different sample sizes (small, medium, and large). The results were obtained by using simulation technique, Programs written using MATLAB-R2008a program were used .Simulation results shown that bayes estimation when the prior distribution is (SRIG) distribution with (a=3, b=1) for, and with (a=b=3) for, and with (a=2, b=3) for, and with (a=1, b=3) for gives the smallest value of MSE and MAPE for all sample sizes.
In practical engineering problems, uncertainty exists not only in external excitations but also in structural parameters. This study investigates the influence of structural geometry, elastic modulus, mass density, and section dimension uncertainty on the stochastic earthquake response of portal frames subjected to random ground motions. The North-South component of the El Centro earthquake in 1940 in California is selected as the ground excitation. Using the power spectral density function, the two-dimensional finite element model of the portal frame’s base motion is modified to account for random ground motions. A probabilistic study of the portal frame structure using stochastic finite elements utilizing Monte Carlo simulation
... Show MoreFrequently, load associated mode of failure, rutting and fatigue, are the main failure types found in some newly constructed roads within Baghdad, the capital of Iraq, and some suburban areas. The use of excessive amount of natural sand in asphalt concrete mixes which is attractive to local contractors could be one of the possible causes to the lack of strength properties of the mixes resulting in frustration in the pavement performance. In this study, the performance properties of asphalt concrete mixes with two natural sand types, desert and river sands, were evaluated. Moreover, five replacement rates of 0, 25, 50, 75, and 100% by weight of the fine aggregate finer than 4.75 were used. The performance properties including moisture susc
... Show MoreThe theoretical analysis depends on the Classical Laminated Plate Theory (CLPT) that is based on the Von-K ráman Theory and Kirchhov Hypothesis in the deflection analysis during elastic limit as well as the Hooke's laws of calculation the stresses. New function for boundary condition is used to solve the forth degree of differential equations which depends on variety sources of advanced engineering mathematics. The behavior of composite laminated plates, symmetric and anti-symmetric of cross-ply angle, under out-of-plane loads (uniform distributed loads) with two different boundary conditions are investigated to obtain the central deflection for mid-plane by using the Ritz method. The computer programs is built using Ma
... Show MoreIn recent decades, tremendous success has been achieved in the advancement of chemical admixtures for Portland cement concrete. Most efforts have concentrated on improving the properties of concrete and studying the factors that influence on these properties. Since the compressive strength is considered a valuable property and is invariably a vital element of the structural design, especially high early strength development which can be provide more benefits in concrete production, such as reducing construction time and labor and saving the formwork and energy. As a matter of fact, it is influenced as a most properties of concrete by several factors including water-cement ratio, cement type and curing methods employed.
Because of acce
The main objective of this study is to develop predictive models using SPSS software (version 18) for Marshall Test results of asphalt mixtures compacted by Hammer, Gyratory, and Roller compaction. Bulk density of (2.351) gm/cc, at OAC of (4.7) % was obtained as a benchmark after using Marshall Compactor as laboratory compactive effort with 75-blows. Same density was achieved by Roller and Gyratory Compactors using its mix designed methods.
A total of (75) specimens, for Marshall, Gyratory, and Roller Compactors have been prepared, based on OAC of (4.7) % with an additional asphalt contents of more and less than (0.5) % from the optimum value. All specimens have been subjected to Marshall Test. Mathematical model
... Show MoreThe agricultural sector suffers from many risks and natural disasters, such as droughts and heavy rains that cause floods, as well as hail and agricultural pests, etc., that threaten agricultural activity and reduce it, which leads to the failure of farmers and peasants for fear of being subjected to continuous losses. Nevertheless, we notice almost complete reluctance to move towards agricultural insurance, due to the dependence of farmers on the government, which adopts the principle of compensation instead of agricultural insurance when natural disasters happen despite the difficulties and financial hardship as well as the suspicion of corruption that haunt the compensation process and this represents the most important problem for resea
... Show MoreIn this research study the synodic month for the moon and their
relationship with the mean anomaly for the moon orbit and date A.D
and for long periods of time (100 years), we was design a computer
program that calculates the period of synodic months, and the
coordinates of the moon at the moment of the new moon with high
accuracy. During the 100 year, there are 1236 period of synodic
months.
We found that the when New Moon occurs near perigee (mean
anomaly = 0°), the length of the synodic month at a minimum.
Similarly, when New Moon occurs near apogee (mean anomaly =
180°), the length of the synodic month reaches a maximum. The
shortest synodic month on 2053 /1/ 16 and lasted (29.27436) days.
The lo
The research risk of flooding on six water basins located in the eastern part of the western plateau, reached total area of the basin (22,998.9 km 2), has reached all the Basin area (basin to time 7056.1 km2 basin by 3585 km 2, Bath Alheiazi 6404 km 2, Abu beasts 544.1 km2 basin Abu Shannan 144.6 km 2, Bath Valley Faraj 5265.1 km 2), where it was specifically spatial degree of this risk by studying some of the hydrological basin transactions directly related to operations spate runoff study area and the occurrence of flood risks on the surface of ponds.