The Estimation Of The Reliability Function Depends On The Accuracy Of The Data Used To Estimate The Parameters Of The Probability distribution, and Because Some Data Suffer from a Skew in their Data to Estimate the Parameters and Calculate the Reliability Function in light of the Presence of Some Skew in the Data, there must be a Distribution that has flexibility in dealing with that Data. As in the data of Diyala Company for Electrical Industries, as it was observed that there was a positive twisting in the data collected from the Power and Machinery Department, which required distribution that deals with those data and searches for methods that accommodate this problem and lead to accurate estimates of the reliability function, The Research Aims to Use The Method Of Moment To Estimate The Reliability Function for Truncated skew-normal Distribution, As This Distribution Represents a Parameterized Distribution That is Characterized By flexibility in dealing with data that is Distributed Normally and Shows some Skewness. From the values defined in the sample space, this means that a cut (Truncated) will be made from the left side in the Skew Normal Distribution and a new Distribution is Derived from the original Skew Distribution that achieves the characteristics of the Skew normal distribution function. Also, real data representing the operating times of three machines until the failure occurred were collected from The Capacity Department of Diyala Company for Electrical Industries, where the results showed that the machines under study have a good reliability index and that the machines can be relied upon at a high rate if they continue to work under the same current working conditions.
The question of estimation took a great interest in some engineering, statistical applications, various applied, human sciences, the methods provided by it helped to identify and accurately the many random processes.
In this paper, methods were used through which the reliability function, risk function, and estimation of the distribution parameters were used, and the methods are (Moment Method, Maximum Likelihood Method), where an experimental study was conducted using a simulation method for the purpose of comparing the methods to show which of these methods are competent in practical application This is based on the observations generated from the Rayleigh logarithmic distribution (RL) with sample sizes
... Show MoreConstruction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the
... Show MoreDesigning machines and equipment for post-harvest operations of agricultural products requires information about their physical properties. The aim of the work was to evaluate the possibility of introducing a new approach to predict the moisture content in bean and corn seeds based on measuring their dimensions using image analysis using artificial neural networks (ANN). Experimental tests were carried out at three levels of wet basis moisture content of seeds: 9, 13 and 17%. The analysis of the results showed a direct relationship between the wet basis moisture content and the main dimensions of the seeds. Based on the statistical analysis of the seed material, it was shown that the characteristics
Foreign direct investment has seen increasing interest worldwide, especially in developing economies. However, statistics have shown that Yemen received fluctuating FDI inflows during the period under study. Against this background, this research seeks to determine the relationship and impact of interest rates on FDI flows. The study also found other determinants that greatly affected FDI inflows in Yemen for the period 1990-2018. Study data collected from the World Bank and International Monetary Fund databases. It also ensured that the time series were made balanced and interconnected, and then the Auto Regressive Distributed Lag method used in the analysis. The results showed that the interest rates and
... Show MoreThe aim of this research does not deal with evaluation occurs at any points in the design of the plan alternatives themselves or formulation of goals and objectives. The aim of this research is that test and evaluate the fully alternatives. We can therefore state as the principle that evaluation of alternative plans must be based on attempts to show how far each plan satisfies all the objectives are expressed as specification of the performance of the urban and regional system. The planner can submit the result (as in the traditional way) for each alternative, with particular reference to the weighting of objectives. The summery result can be presented and the preferred plan indicated that with largest index of Goals-achievement.
... Show MoreThis study dealt with the management strategy as an independent variable and the integrated industrial distribution as a variable. The study aimed at finding the integrated industrial distribution that fits with the management strategy in providing the needs of the firm on the one hand and reducing the cost of management that is reflected in increasing its profits.
The researcher selected the data from (130) decision makers in the corporation and used the questionnaire as a tool for collecting data and used a set of statistical tools and tools suitable for the nature of information and were processed using the data analysis system (SPSS version 24) Based on the analysis of the responses of the sample and the test of correlation and
The problem of Multicollinearity is one of the most common problems, which deal to a large extent with the internal correlation between explanatory variables. This problem is especially Appear in economics and applied research, The problem of Multicollinearity has a negative effect on the regression model, such as oversized variance degree and estimation of parameters that are unstable when we use the Least Square Method ( OLS), Therefore, other methods were used to estimate the parameters of the negative binomial model, including the estimated Ridge Regression Method and the Liu type estimator, The negative binomial regression model is a nonline
... Show More