The aim of this research is to solve a real problem in the Department of Economy and Investment in the Martyrs establishment, which is the selection of the optimal project through specific criteria by experts in the same department using a combined mathematical model for the two methods of analytic hierarchy process and goal programming, where a mathematical model for goal programming was built that takes into consideration the priorities of the goal criteria by the decision-maker to reach the best solution that meets all the objectives, whose importance was determined by the hierarchical analysis process. The most important result of this research is the selection of the second project (constructing a cultural centre in Sadr City) as the best alternative out of seven projects. Also, the possibility of applying this model to solve multi-criteria decision-making problems in many institutions and companies was reached.
In this paper, we made comparison among different parametric ,nonparametric and semiparametric estimators for partial linear regression model users parametric represented by ols and nonparametric methods represented by cubic smoothing spline estimator and Nadaraya-Watson estimator, we study three nonparametric regression models and samples sizes n=40,60,100,variances used σ2=0.5,1,1.5 the results for the first model show that N.W estimator for partial linear regression model(PLM) is the best followed the cubic smoothing spline estimator for (PLM),and the results of the second and the third model show that the best estimator is C.S.S.followed by N.W estimator for (PLM) ,the
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreIn this paper a new structure for the AVR of the power system exciter is proposed and designed using digital-based LQR. With two weighting matrices R and Q, this method produces an optimal regulator that is used to generate the feedback control law. These matrices are called state and control weighting matrices and are used to balance between the relative importance of the input and the states in the cost function that is being optimized. A sample power system composed of single machine connected to an infinite- bus bar (SMIB) with both a conventional and a proposed Digital AVR (DAVR) is simulated. Evaluation results show that the DAVR damps well the oscillations of the terminal voltage and presents a faster respo
... Show MoreThis study aimed to determine obesity level of some population in Baghdad by using Bio-electrical impedance analysis (BIA) and compared with anthropometric measurements such as body mass index (BMI), waist circumference (WC) and waist-to-hip ratio (WHR). Statistical analysis results of linear correlation coefficients for obesity indicators showed that BIA correlation 0.92 was most significant and reliable for obesity measurement.
Results of BIA method for age group 20-29 years showed that 44.4% of females were healthy body while 37.8% of males suffer from increased body fat. Results of age group 30-39 year showed that 32.6 of females were in healthy body and 42% of males were obese. In case age group 40-4
... Show MoreIn this research, we dealt with the study of the Non-Homogeneous Poisson process, which is one of the most important statistical issues that have a role in scientific development as it is related to accidents that occur in reality, which are modeled according to Poisson’s operations, because the occurrence of this accident is related to time, whether with the change of time or its stability. In our research, this clarifies the Non-Homogeneous hemispheric process and the use of one of these models of processes, which is an exponentiated - Weibull model that contains three parameters (α, β, σ) as a function to estimate the time rate of occurrence of earthquakes in Erbil Governorate, as the governorate is adjacent to two countr
... Show MoreThe research aims to identify the role determined by the dimensions of marketing in the relationship represented by (trust in the relationship, commitment to the relationship, communication during the relationship) in how to contribute to the success of the industrial project management in Iraq as a case study in the General Directorate of Industrial Development. Their number is (50) workers, where the research problem centered on knowing the impact and importance of relationship marketing on the success of industrial project management. The descriptive analytical approach. Using SPSS and Amos, the researcher tested and analysed hypotheses about the relationship and the influence between the research variables through a questionnaire . Test
... Show More