Scheduling projects using dynamic programming style and smart algorithm
...Show More Authors

The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.

It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed  And not exceed them and often the most important of these goals is to reduce the time of implementation of the project to the minimum possible and then compare the plan and the reality and avoid the differences that occurred early, depending on the commitment to the scheduled schedule and the extent of implementation of each activity in time and cost without delay The main objective is to extract the critical path and divide the project into multiple stages using dynamic programming method, which helps to know when the project will be completed and to know the critical path in which the delay of any activity affects the duration of completion of the project The results are compared with the results of the artificial intelligence method and using the hybrid algorithm where the results are the same in both methods and the completion time of the project is (675) working days. 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Mar 01 2022
Journal Name
Results In Engineering
Predictive model for stress at ultimate in internally unbonded steel tendons based on genetic expression programming
...Show More Authors

View Publication
Crossref (17)
Crossref
Publication Date
Mon Jun 19 2023
Journal Name
Journal Of Engineering
A Linear Programming Method Based Optimal Power Flow Problem for Iraqi Extra High Voltage Grid (EHV)
...Show More Authors

The objective of an Optimal Power Flow (OPF) algorithm is to find steady state operation point which minimizes generation cost, loss etc. while maintaining an acceptable system performance in terms of limits on generators real and reactive powers, line flow limits etc. The OPF solution includes an objective function. A common objective function concerns the active power generation cost. A Linear programming method is proposed to solve the OPF problem. The Linear Programming (LP) approach transforms the nonlinear optimization problem into an iterative algorithm that in each iteration solves a linear optimization problem resulting from linearization both the objective function and constrains. A computer program, written in MATLAB environme

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Feb 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Using the Balanced Performance Approach to Increase the Effectiveness of Strategic Planning in order to Maximize the Job Satisfaction Rates at the Faculties of Bisha University
...Show More Authors

Purpose: To use the balanced measurement approach as a strategic link for increasing the effectiveness of strategic planning in the direction of achieving satisfaction rates at Bisha University in Saudi Arabia

Design / methodology / approach –The questionnaire survey was used to collect the data of the study from the faculty members at University of Bisha.

Findings –Prove the assumption that the use of the balanced measurement approach - as a strategic planning tool - leads to maximize the satisfaction rates among faculty members at the University of Bisha.

Research limitations/implications-  adopt effective strategic planning in order to achieve

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Dec 07 2021
Journal Name
2021 14th International Conference On Developments In Esystems Engineering (dese)
Study the use of Nano-limestone and Egg-shell Ash in Eco-friendly SCC: an Experimental and Statistical Evaluation Based on Computer Programming
...Show More Authors

View Publication
Scopus (20)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Tue Jul 12 2022
Journal Name
Proceedings Of Seventh International Congress On Information And Communication Technology
Identification of Key Criteria of Selecting the Delivery System and Type of Contract in Construction Projects
...Show More Authors

View Publication
Scopus (2)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 08 2024
Journal Name
Engineering, Technology & Applied Science Research
Applying the Analytical Hierarchy Process to Identify the Challenges and Priorities of Reconstruction Projects in Iraq
...Show More Authors

Reconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in

... Show More
View Publication
Scopus (2)
Crossref (6)
Scopus Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (10)
Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Compared with Genetic Algorithm Fast – MCD – Nested Extension and Neural Network Multilayer Back propagation
...Show More Authors

The study using Nonparametric methods for roubust to estimate a location and scatter it is depending  minimum covariance determinant of multivariate regression model , due to the presence of outliear values and increase the sample size and presence of more than after the model regression multivariate therefore be difficult to find a median location .       

It has been the use of genetic algorithm Fast – MCD – Nested Extension and compared with neural Network Back Propagation of multilayer in terms of accuracy of the results and speed in finding median location ,while the best sample to be determined by relying on less distance (Mahalanobis distance)has the stu

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Mar 23 2020
Journal Name
Baghdad Science Journal
Compact MIMO Slots Antenna Design with Different Bands and High Isolation for 5G Smartphone Applications
...Show More Authors

 In this paper, two elements of the multi-input multi-output (MIMO) antenna had been used to study the five (3.1-3.55GHz and 3.7-4.2GHz), (3.4-4.7 GHz), (3.4-3.8GHz) and (3.6-4.2GHz) 5G bands of smartphone applications that is to be introduced to the respective US, Korea, (Europe and China) and Japan markets. With a proposed dimension of 26 × 46 × 0.8 mm3, the medium-structured and small-sized MIMO antenna was not only found to have demonstrated a high degree of isolation and efficiency, it had also exhibited a lower level of envelope correlation coefficient and return loss, which are well-suited for the 5G bands application. From the fabrication of an inexpensive FR4 substrate with a 0.8 mm thickness level, a loss tang

... Show More
View Publication Preview PDF
Scopus (11)
Crossref (1)
Scopus Clarivate Crossref