Preferred Language
Articles
/
jeasiq-128
Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and access to the optimum time for maintenance, which achieves the lowest costs. The second method depends on the reliability function, which was to determine the optimal maintenance period, which then cost less Can. We also proved through this research that the method of scheduling is better than the method of relying on the reliability function because it depends heavily on the cost of maintenance.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Apr 20 2020
Journal Name
International Medical Journal
Cleaning efficacy and instrumentation time using rotary file system in primary molars (comparative study)
...Show More Authors

ABSTRACT— In primary teeth, root canal treatment is a time consuming and challenging procedure, particularly during the most important step in endodontic treatment which is the preparation of the canal. Pulpectomy is the treatment of choice in all the necrotic primary teeth. For better treatment protocol, advancing technology brought the rotary system to reduce the manual dexterity and improve the quality of treatment for pulpectomy. This study aimed to compare and assess the efficacy of cleaning and the time required for the instrumentation during the preparation of root canals of the primary molars using the rotary and the manual (conventional) systems. Thirty root canals of primary teeth were selected. These teeth submitted to a

... Show More
Publication Date
Thu Mar 29 2018
Journal Name
Construction Research Congress 2018
Validation of Time-Safety Influence Curve Using Empirical Safety and Injury Data—Poisson Regression
...Show More Authors

View Publication
Scopus (6)
Crossref (5)
Scopus Crossref
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Project Planning & Scheduling: بحث تطبيقي لمشاريع / مديرية الابنية المدرسية /دائرة المشاريع /مشروعالوزارةرقم (1)
...Show More Authors

Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholder needs , However, there is increasing concern about whether know-how effectively improves  understanding of underlying theories of project management processes for construction organizations and their project managers  Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance , but many worldwide construction projects appear to give insufficient attention to effective management and definition of  project  planning, including pre planning stages . Indeed, some planning issues indeed, some planning issues have been completely ove

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jul 02 2025
Journal Name
Advances In Nonlinear Variational Inequalities
Suggesting Approximation and Exact Algorithms to Solve New Tri-Criteria Machine Scheduling Problems
...Show More Authors

This study presents the multi criteria single-machine model. The machine scheduling problem (MSP) for ntasks on a single machine involves minimizing a function of three criteria: total completion time (C_j),maximum earliest (E_max), and tardiness (〖ΣT〗_j), This is an NP-hard issue. Within this work's theoretical section, we present the mathematical formulation of The presented topic thenhighlights the usefulness of the dominance rule (DR), which may be used to develop effective solutions. Whilein the practical part, one of the important exact methods; The proposed MSP tricriteria are solved by applyingthe Branch and Bound (BAB) method, which finds a set of efficient solutions for 1//F(ΣC_j ,ΣT_j ,E_max) upto n=100 jobs. The BAB appro

... Show More
Publication Date
Sun Oct 04 2026
Journal Name
Journal Of Engineering
Image Compression Using 3-D Two-Level Techniques
...Show More Authors

In this paper three techniques for image compression are implemented. The proposed techniques consist of three dimension (3-D) two level discrete wavelet transform (DWT), 3-D two level discrete multi-wavelet transform (DMWT) and 3-D two level hybrid (wavelet-multiwavelet transform) technique. Daubechies and Haar are used in discrete wavelet transform and Critically Sampled preprocessing is used in discrete multi-wavelet transform. The aim is to maintain to increase the compression ratio (CR) with respect to increase the level of the transformation in case of 3-D transformation, so, the compression ratio is measured for each level. To get a good compression, the image data properties, were measured, such as, image entropy (He), percent root-

... Show More
View Publication
Publication Date
Fri Sep 30 2022
Journal Name
Iraqi Geological Journal
Estimation of Initial Oil in Place for Buzurgan Oil Field by Using Volumetric Method and Reservoir Simulation Method
...Show More Authors

The estimation of the initial oil in place is a crucial topic in the period of exploration, appraisal, and development of the reservoir. In the current work, two conventional methods were used to determine the Initial Oil in Place. These two methods are a volumetric method and a reservoir simulation method. Moreover, each method requires a type of data whereet al the volumetric method depends on geological, core, well log and petrophysical properties data while the reservoir simulation method also needs capillary pressure versus water saturation, fluid production and static pressure data for all active wells at the Mishrif reservoir. The petrophysical properties for the studied reservoir is calculated using neural network technique

... Show More
View Publication
Scopus (12)
Scopus Crossref
Publication Date
Tue Jun 01 2021
Journal Name
International Journal Of Nonlinear Analysis And Applications
A proposed method for cleaning data from outlier values using the robust rfch method in structural equation modeling
...Show More Authors

View Publication Preview PDF
Scopus (5)
Scopus
Publication Date
Fri Dec 31 2021
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
GEOMETRY OPTIMIZATION OF COUPLING ALLIN -METFORMIN USING DFT/B3LYP MOLECULAR MODELLING TECHNIQUE: GEOMETRY OPTIMIZATION OF COUPLING ALLIN -METFORMIN USING DFT/B3LYP MOLECULAR MODELLING TECHNIQUE
...Show More Authors

This researchpaper includes the incorporation of Alliin at various energy levels and angles 

With Metformin using Gaussian 09 and Gaussian view 06. Two computers were used in this work. Samples were generated to draw, integrate, simulate and measure the value of the potential energy surface by means of which the lowest energy value was (-1227.408au). The best correlation compound was achieved between Alliin and Metformin through the low energy values where the best place for metformin to b

... Show More
View Publication Preview PDF
Publication Date
Tue Jun 06 2023
Journal Name
Journal Of University Of Anbar For Pure Science (juaps)
Approximate Solution of Emden-Fowler Equation Using the Galerkin Method
...Show More Authors

Publication Date
Sun Jun 30 2013
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Extraction of Oil from Eucalyptus Camadulensis Using Water Distillation Method
...Show More Authors

This work was conducted to study the extraction of eucalyptus oil from natural plants (Eucalyptus camaldulensis leaves) using water distillation method by Clevenger apparatus. The effects of main operating parameters were studied: time to reach equilibrium, temperature (70 to100°C), solvent to solid ratio (4:1 to 8:1 (v/w)), agitation speed (0 to 900 rpm), and particle size (0.5 to 2.5 cm) of the fresh leaves, to find the best processing conditions for achieving maximum oil yield. The results showed that the agitation speed of 900 rpm, temperature 100° C, with solvent to solid ratio 5:1 (v/w) of particle size 0.5 cm for 160 minute give the highest percentage of oil (46.25 wt.%). The extracted oil was examined by HPLC.

View Publication Preview PDF