Preferred Language
Articles
/
jcopolicy-114
Rules and steps The design of university research projects
...Show More Authors

Research is a study conducted by a researcher or a group of researchers to uncover ambiguity, complete a knowledge, or define a relationship, Solve a problem, or answer a question by carefully investigating the comprehensive and in-depth examination of the evidence and evidence related to this knowledge, revealing a relationship, or solving a problem, or answering a question, to be a systematic, In evidence and evidence that reveal facts and general rules, relationships or solutions, in addition to providing knowledge Human rights are verifiable, tested and confirmed. The university research (graduate research, master's thesis, doctoral dissertation) is the most important type of research, and it is supposed to be the best one, since it must have characteristics (neutrality, objectivity, methodology, honesty and scientific)

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Dec 31 2012
Journal Name
Al-khwarizmi Engineering Journal
Genetic Algorithm Based PID Controller Design for a Precise Tracking of Two-Axis Piezoelectric Micropositioning Stage
...Show More Authors

 In this paper, an intelligent tracking control system of both single- and double-axis Piezoelectric Micropositioner stage is designed using Genetic Algorithms (GAs) method for the optimal Proportional-Integral-Derivative (PID) controller tuning parameters. The (GA)-based PID control design approach is a methodology to tune a (PID) controller in an optimal control sense with respect to specified objective function. By using the (GA)-based PID control approach, the high-performance trajectory tracking responses of the Piezoelectric Micropositioner stage can be obtained. The (GA) code was built and the simulation results were obtained using MATLAB environment. The Piezoelectric Micropositioner simulation model with th

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Tue Feb 01 2022
Journal Name
Baghdad Science Journal
Application of Groebner Bases to Study a Communication System
...Show More Authors

This paper introduces a relationship between the independence of polynomials associated with the links of the network, and the Jacobian determinant of these polynomials. Also, it presents a way to simplify a given communication network through an algorithm that splits the network into subnets and reintegrates them into a network that is a general representation or model of the studied network. This model is also represented through a combination of polynomial equations and uses Groebner bases to reach a new simplified network equivalent to the given network, which may make studying the ability to solve the problem of network coding less expensive and much easier.

View Publication Preview PDF
Scopus Clarivate Crossref
Publication Date
Tue Jul 12 2022
Journal Name
Proceedings Of Seventh International Congress On Information And Communication Technology
Identification of Key Criteria of Selecting the Delivery System and Type of Contract in Construction Projects
...Show More Authors

View Publication
Scopus (2)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Sun Sep 01 2019
Journal Name
مجلة بحوث
The role of university in promoting the culture of volunteering among students (Mustansiriya University Model)
...Show More Authors

Abstract The aim of this study is to identify the role played by the university in reinforcing the culture of voluntary work in college students and sequencing these roles according to their priority. To achieve this aim, the researcher used the descriptive approach. After being informed of the literature background and of the previous studies related to the core aim of this recent study, the researcher has built up a questionnaire of (20) items investigating the role of university in reinforcing the culture of voluntary work in the college students. The standardized features of the questionnaire have been checked for the purpose of the questionnaire validity (virtual and constructive validity) and stability (reconstruction and Cronbach's A

... Show More
View Publication
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Sep 30 2022
Journal Name
International Journal Of Intelligent Systems And Applications In Engineering
Optimizing Methods of Funding Residential Complexes Projects
...Show More Authors

Scopus (3)
Scopus
Publication Date
Fri Sep 11 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Application of Nanotechnology in Iraqi Construction Projects
...Show More Authors

View Publication
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five