Preferred Language
Articles
/
jcolang-759
Construction Grammar in Kurdish Language: ڕێزمانی بونیادنان لە زمانی کوردیدا توێژینەوەیەکی هەڵهێنجراو(مستل)ە لەنامەی دکتۆراوە وەرگیراوە
...Show More Authors

This research is under the title (Construction Grammar in the Kurdish language), which in turn is an attempt to present grammar and Kurdish grammar from the perspective of the constructive of Cognitive Linguistics. The construction as a term in the Kurdish language base was not recent, as it was discussed in other schools in a specific way from the perspective of language schools, but the subject of construction with a perceived background includes specific purposes, which is how to build the linguistic base by being a template accessible to its speakers, and in the cases of speaking it, not to mention how it is perceived and the level it is familiar with by its speakers. The nominal purpose of the Construction is Unification of form-meaning in a grammatical structural unit. Thus, the Construction Grammar presents the form-meaning, both in one scope. From the point of view of Construction Grammar, the basic units in grammar are the Constructions, all of which are reflected on how it works automatically and perceptively to the minds of its speakers. In other words, how grammar is influenced by linguistic uses and speech situations through which speakers experience grammar as one of their perceived abilities. This means that the speakers' constructed grammar contains the most linguistic knowledge. This is because all linguistic units are seen as symbols (whether Sounds or Sentential), where in turn they form a unit of meaning-form together. The present study is divided into two chapters:
The first Chapter is entitled (Principles of Construction Grammar). This section presents the principles of Construction Grammar in Linguistics and Kurdish language.
In the second Chapter, The basic rules of Construction Grammar are presented with practical examples in Kurdish Language.

          ئەم توێژینەوەیە بەناونیشانی (ڕێزمانی بونیادنان لە زمانی کوردیدا)، هەوڵێکە لە پێناو خستنەڕووی ڕێزمان و ڕێزمانی کوردی لە ڕوانگە و گۆشەنیگای بونیادنراوی زانستی زمانی درکپێکردنەوە. بونیادنان وەک زاراوە لە زمانەوانیی کوردیدا، نوێ نییە و لە قوتابخانەکانی دیکەدا بەجۆری تایبەت و لە ڕوانگەی قوتابخانە زمانەوانییەکانی دیکەوە، باسیلێوەکراوە، بەڵام زاراوەکە بە باگراوەندێکی درکپێکراوەوە، مەبەست و لێکدانەوەی تایبەت لەخۆیدەگرێت. لەم ڕوانگەیەوە بونیادنان، جوتکردنی فۆڕم_واتایە لە یەک بونیادی ڕێزمانیدا. بەمجۆرە ڕێزمانی بونیادنان هەرکام لە فۆڕم_واتای دەربڕاوەکان پێکەوە وەک یەک داڕشتە پێشنیازدەکات. لەڕوانگەی ڕێزمانی بونیادنانەوە، یەکەی بنەڕەتی لە ڕێزماندا، بونیادەکانن، کە ئەمانیش، چۆنیەتی کارکردنە ئۆتۆماتیکییە درکپێکراوەکەی ئاوەزی ئاخێوەران دەنوێنن. بە واتایەکی دیکە، ڕێزمان چۆن دەخرێتە ژێر کاریگەریی بەکارهێنانە زمانییەکان و بارودۆخەکانی ئاخاوتنەوە، کە بەهۆیانەوە ئاخێوەران، ڕێزمانی زمانیش وەک یەکێک لە توانا درکپێکراوەکەیان ئەزموندەکەن. بەمشێوەیە ڕێزمانی بونیادنراوی ئاخێوەران، زۆرترین کۆزانیاریی زمانی لەخۆیدەگرێت. هۆکاری ئەمەیش بۆ ئەوە دەگەڕێتەوە، کە سەرجەمی یەکە زمانییەکان، وەک هێمایەک دەبینرێن(چ هێمای دەنگی بن، یاخود ڕستەیی)، کە جوتکراوی فۆڕم_واتان پێکەوە.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (9)
Crossref
Publication Date
Wed Feb 16 2005
Journal Name
مجلة الآداب
النبر في اللغة العربية
...Show More Authors

يعد النبر

View Publication
Crossref
Publication Date
Wed Jun 15 2022
Journal Name
Al-adab Journal
THE SEMIOTIC COMPONENT OF LACUNS AND THEIR BASIC TYPES IN THE LANGUAGE: THEORETICAL SUBSTANTIATION
...Show More Authors

The article attempts to provide the theoretical fundamentals for the semiotic component of lacunae in a language. The definitions of the following notions have been represented: 1) lacunarity as a complex phenomenon that works in the modes of language, speech and speech behaviour; 2) lacuna as a gap, an empty space, which lacks something, which may be characteristic of a written work. The author of the article considers the main classes of lacunae, among which are: 1) generic lacunae, which reflect the absence of a common name for a class of objects; 2) species lacunae are the absence of specific names, names of individual types of objects or phenomena; 3) intralingual lacunae are found within the paradigms of one language; 4) interlanguage

... Show More
Publication Date
Sun Mar 22 2026
Journal Name
Dijlah Journal Of Engineering Sciences
Artificial Intelligence in Arabic Natural Language Processing: A Review of Models, Datasets, and Applications
...Show More Authors

Arabic language processing with artificial intelligence has evolved significantly in the past decades, from traditional rule- and dictionary-based techniques, through statistical models to modern deep and transformer models. This review intends to present an overview of the most well-known Arabic models as well as datasets used for its training, and the main practical applications such as sentiment analysis, machine translation, speech recognition, and smart assistant. AI-based Arabic NLP has had good progress in the previous decades, from rule and dictionary-based approaches to statistical methods and deep transformative learning models nowadays. In addition to it, the most popular state-of-the-art models that are fine-tuned for the Arabi

... Show More
View Publication Preview PDF
Publication Date
Tue Mar 31 2026
Journal Name
Asian Journal Of Human Services
A Corpus Stylistic Analysis of Drug Addiction Perils Language Patterns in Nico Walker’s Cherry
...Show More Authors

.

View Publication
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The construction of Investment Portfolios in the Iraq Stock Exchange: Market Timing Vs. an Efficient Selection
...Show More Authors

Abstract

         Uncertainty, the deeply-rooted fact that surrounding the investment environment, especially the stock market which just prices have taken a specific trend until they moved to another one for its up or down. This means that the volatility characteristic of financial market requires the rational investor an argument led towards the adoption of planned acts to gain greater benefit in the goal of wealth maximizing. There is no possibility to achieve this goal without the burden of uncertainty and the risk of systematic fluctuations of investment returns in the financial market after the facts of  efficient diversification have pro

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (11)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim

... Show More
View Publication
Crossref (7)
Crossref