Problem solving methods and mechanisms contribute to facilitating human life by providing tools to solve simple and complex daily problems. These mechanisms have been essential tools for professional designers and design students in solving design problems.
This research dealt with one of those mechanisms, which is the (the substance-field model model), as it has been mentioning that this mechanism is characterized by the difficulty of its application, which formed the main research problem. In home gardens (the sub-problem of research), an analysis of this problem was applied and then a solution was found to address it. The researcher used the 3dsmax program to implement the proposed design.
The most important research results were: .
1- The research methodology and the method of applying the substance-field model mechanism to solve a problem can be applied to solve various simple and complex design problems by professional designers in addition to its importance for design students in particular.
2- The research presented a proposed model to solve the problem of the shovel using the substance-field model mechanism.
In the past two decades, maritime transport traffic has increased, especially in the case of container flow. The BAP (Berth Allocation Problem) (BAP) is a main problem to optimize the port terminals. The current manuscript explains the DBAP problems in a typical arrangement that varies from the conventional separate design station, where each berth can simultaneously accommodate several ships when their entire length is less or equal to length. Be a pier, serve. This problem was then solved by crossing the Red Colobuses Monkey Optimization (RCM) with the Genetic Algorithm (GA). In conclusion, the comparison and the computational experiments are approached to demonstrate the effectiveness of the proposed method contrasted with other
... Show MoreThis research examines the impact of construction technology systems in contemporary architectural production through the study of the evolution in it systems, construction materials and methods of construction in addition to the digital revolution which provided possibilities of structural and architectural design in creating a distinct architectural product, as considered construction systems technology is the source of creativity in the architectural product, the research is assumed that the construction systems technology have achieved a structural innovation in production through the materials and methods of construction and digital design.
For Long time technology was connected to the
The aim of the research is to know the characteristics of both variables in order to be able the to construct the integrated framework of its paragraphs through the available information on both inspirational leadership and organizational health. as fundamental variables of research, as well as the extent of the influence of the inspirational variable as an independent variable in the organizational health variable as a variable in its three physical, mental and social dimensions. The research is important to stimulate the behavior side of the staff. Which is one of the top concerns of senior management in the ministry, because of its great importance in increasing the effectiveness of the performance of e
... Show MoreCurrent search aims to identify the creative thinking of the kindergarten teachers and
solving professional problems among kindergarten teachers skills, and whether the level of
creative thinking in solving professional problems, according on marital status years of
service academic achievement of teachers as well as to identify the correlation between the
two variables the current sample consisted of (300) teachers to achieve the objectives of the
stndy , the researcher used two measures, one to measure creative thinking and the other to
measure the solution to the problems of professional kindergarten teachers skills. It has been
shown. validity and reliability of the two measures. The present stndy aims to identif
Abstract
This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project
... Show MoreThe study aims to identify the effectiveness of a structural theory-based training program in enhancing the teaching practices of Arabic language teachers teaching grade ten in South Al Batinah in Sultanate of Oman. The study used the quasi-experimental design, and the sample consisted of 40 male and female teachers. To achieve the objectives of the study, a training program, an observation form and a measurement tool of teachers’ tendencies towards a structural teaching were made. The program was implemented with an experimental group of 20 female and male teachers in the first semester of the academic year 2018/2019. The study has found that there is a statistically significant difference between the average grades before and after i
... Show MoreThe problem of Bi-level programming is to reduce or maximize the function of the target by having another target function within the constraints. This problem has received a great deal of attention in the programming community due to the proliferation of applications and the use of evolutionary algorithms in addressing this kind of problem. Two non-linear bi-level programming methods are used in this paper. The goal is to achieve the optimal solution through the simulation method using the Monte Carlo method using different small and large sample sizes. The research reached the Branch Bound algorithm was preferred in solving the problem of non-linear two-level programming this is because the results were better.
Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).
The Geological modeling has been constructed by using Petrel E&P software to incorporate data, for improved Three-dimensional models of porosity model, water saturation, permeability estimated from core data, well log interpretation, and fault analysis modeling.
Three-dimensional geological models attributed with physical properties constructed from primary geological data. The reservoir contains a huge hydrocarbon accumulation, a unique geological model characterization with faults, high heterogeneity, and a very complex field in nature.
The results of this study show that the Three-dimensional geological model of Khasib reservoir, to build the reservoir model starting with evaluation of reservoir to interpretation o
... Show More
