The research (Comic Scene Construction between Dramatic Situation and Acting Performance in Feature Film) has been divided into the following: the methodological framework which consists of the problem of the research: how to construct the comic scene between the dramatic situation and acting performance in the feature film. The research importance and aims are: identifying how to construct the comic scene between the dramatic situation and acting performance in the feature film. The limits of the research are also stated.
The research is divided into three sections: the first is the comic situation and the Aristotelian discourse in which the comic situation is clarified starting from the Aristotelian discourse. The second section: mechanisms of acting. The third is: acting performance and the construction of the feature film which addressed the relationship between the acting performance and language elements. Then, the researcher came up with the indicators of the theoretical framework which will be used as a tool for analyzing the sample. The research procedures included the research methodology, tool, sample, analysis unit, validity and the research sample which is the Arabic film (8 Giga) directed by Ashraf Fayiq produced in 2010. The researcher analyzed the sample and came up with a number of results and conclusions and ended the research with a list of references
This research examines the impact of construction technology systems in contemporary architectural production through the study of the evolution in it systems, construction materials and methods of construction in addition to the digital revolution which provided possibilities of structural and architectural design in creating a distinct architectural product, as considered construction systems technology is the source of creativity in the architectural product, the research is assumed that the construction systems technology have achieved a structural innovation in production through the materials and methods of construction and digital design.
For Long time technology was connected to the
This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.
... Show MoreSustainable plant protection and the economy of plant crops worldwide depend heavily on the health of agriculture. In the modern world, one of the main factors influencing economic growth is the quality of agricultural produce. The need for future crop protection and production is growing as disease-affected plants have caused considerable agricultural losses in several crop categories. The crop yield must be increased while preserving food quality and security and having the most negligible negative environmental impact. To overcome these obstacles, early discovery of satisfactory plants is critical. The use of Advances in Intelligent Systems and information computer science effectively helps find more efficient and low-cost solutions. Thi
... Show MoreThis paper demonstrates the design of an algorithm to represent the design stages of fixturing system that serve in increasing the flexibility and automation of fixturing system planning for uniform polyhedral part. This system requires building a manufacturing feature recognition algorithm to present or describe inputs such as (configuration of workpiece) and built database system to represents (production plan and fixturing system exiting) to this algorithm. Also knowledge – base system was building or developed to find the best fixturing analysis (workpiece setup, constraints of workpiece and arrangement the contact on this workpiece) to workpiece.