Preferred Language
Articles
/
jcofarts-346
Comic Scene Construction between Dramatic Situation and Acting Performance in Feature Film: علاء الدين عبد المجيد جاسم-عمار حميد حسين
...Show More Authors

The research (Comic Scene Construction between Dramatic Situation and Acting Performance in Feature Film) has been divided into the following: the methodological framework which consists of the problem of the research: how to construct the comic scene between the dramatic situation and acting performance in the feature film. The research importance and aims are: identifying how to construct the comic scene between the dramatic situation and acting performance in the feature film. The limits of the research are also stated.
The research is divided into three sections: the first is the comic situation and the Aristotelian discourse in which the comic situation is clarified starting from the Aristotelian discourse. The second section: mechanisms of acting. The third is: acting performance and the construction of the feature film which addressed the relationship between the acting performance and language elements. Then, the researcher came up with the indicators of the theoretical framework which will be used as a tool for analyzing the sample. The research procedures included the research methodology, tool, sample, analysis unit, validity and the research sample which is the Arabic film (8 Giga) directed by Ashraf Fayiq produced in 2010. The researcher analyzed the sample and came up with a number of results and conclusions and ended the research with a list of references

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Mar 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Feature - Based Approach to Automatic Fixturing System Planning For Uniform Polyhedra Workpiece
...Show More Authors

This paper demonstrates the design of an algorithm to represent the design stages of fixturing system that serve in increasing the flexibility and automation of fixturing system planning for uniform polyhedral part. This system requires building a manufacturing feature recognition algorithm to present or describe inputs such as (configuration of workpiece) and built database system to represents (production plan and fixturing system exiting) to this algorithm. Also knowledge – base system was building or developed to find the best fixturing analysis (workpiece setup, constraints of workpiece and arrangement the contact on this workpiece) to workpiece.

View Publication Preview PDF
Publication Date
Thu Oct 01 2020
Journal Name
Ieee Transactions On Artificial Intelligence
Recursive Multi-Signal Temporal Fusions With Attention Mechanism Improves EMG Feature Extraction
...Show More Authors

View Publication
Scopus (44)
Crossref (41)
Scopus Crossref
Publication Date
Wed May 10 2023
Journal Name
Diagnostics
A Deep Feature Fusion of Improved Suspected Keratoconus Detection with Deep Learning
...Show More Authors

Detection of early clinical keratoconus (KCN) is a challenging task, even for expert clinicians. In this study, we propose a deep learning (DL) model to address this challenge. We first used Xception and InceptionResNetV2 DL architectures to extract features from three different corneal maps collected from 1371 eyes examined in an eye clinic in Egypt. We then fused features using Xception and InceptionResNetV2 to detect subclinical forms of KCN more accurately and robustly. We obtained an area under the receiver operating characteristic curves (AUC) of 0.99 and an accuracy range of 97–100% to distinguish normal eyes from eyes with subclinical and established KCN. We further validated the model based on an independent dataset with

... Show More
View Publication
Scopus (41)
Crossref (38)
Scopus Clarivate Crossref
Publication Date
Fri Oct 17 2025
Journal Name
International Journal Of Construction Management
Enhancing employee retention in construction: role of workforce sustainability attributes
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
The Impact of Construction Systems Technology in Contemporary Architectural Product
...Show More Authors

This research examines the impact of construction technology systems in contemporary architectural production through the study of the evolution in it systems, construction materials and methods of construction in addition to the digital revolution which provided possibilities of structural and architectural design in creating a distinct architectural product, as considered construction systems technology is the source of creativity in the architectural product, the research is assumed that the construction systems technology have achieved a structural innovation in production through the materials and methods of construction and digital design.
For Long time technology was connected to the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF
Scopus (11)
Crossref (5)
Scopus Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Periodicals Of Engineering And Natural Sciences
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus (21)
Scopus
Publication Date
Fri Nov 01 2024
Journal Name
Practice Periodical On Structural Design And Construction
Risks Associated with Using Drones in Construction for Safety Management
...Show More Authors

View Publication
Scopus (11)
Crossref (14)
Scopus Crossref
Publication Date
Fri Apr 12 2019
Journal Name
Journal Of Economics And Administrative Sciences
Measuring and analysis of the impact of public budget deficit on external debt in lraq with in the framework of joint integration of the period (1990 – 2016 )
...Show More Authors

The concept of deficit in public budget becomes a chronic economic phenomenon in most of the world, whether the advanced countries or developing countries. Despite  the difference in the visions of the economic schools to accept or reject the deficit in public budget but the opinion that prevailed is the necessity of the state to reduce the public spending which led to a continuous deficits in the public budget which consequently increased the government borrowing ,increase income taxes and wealth, consequently this weakened the in motivation in private investment which contributed to the increase of in factionary stagnation , so that governments have to cover the lack of local funding sources which become difficult to be eq

... Show More
View Publication Preview PDF
Crossref (1)
Crossref