The research (Comic Scene Construction between Dramatic Situation and Acting Performance in Feature Film) has been divided into the following: the methodological framework which consists of the problem of the research: how to construct the comic scene between the dramatic situation and acting performance in the feature film. The research importance and aims are: identifying how to construct the comic scene between the dramatic situation and acting performance in the feature film. The limits of the research are also stated.
The research is divided into three sections: the first is the comic situation and the Aristotelian discourse in which the comic situation is clarified starting from the Aristotelian discourse. The second section: mechanisms of acting. The third is: acting performance and the construction of the feature film which addressed the relationship between the acting performance and language elements. Then, the researcher came up with the indicators of the theoretical framework which will be used as a tool for analyzing the sample. The research procedures included the research methodology, tool, sample, analysis unit, validity and the research sample which is the Arabic film (8 Giga) directed by Ashraf Fayiq produced in 2010. The researcher analyzed the sample and came up with a number of results and conclusions and ended the research with a list of references
Magical realism potential bulwark plastic art and literature، and won great fame and Research cash innumerable، and like other currents of literary found his outlet in the art of cinema، quoted cinema of literature magical realism and influenced his concepts، and Arab cinema، it was necessary to have a vulnerability to stream، either Tools employing magical realism، unintentionally since the early beginnings dating back to the time of World Wars I and II، or in deliberate more mature in the twenty-first century، due to the emergence of film-makers more aware and culture، and more friction global currents.
But this raises a number of problems that need to be addressed from the maker of
Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreThe management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreThe main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show MoreThere is a great deal of systems dealing with image processing that are being used and developed on a daily basis. Those systems need the deployment of some basic operations such as detecting the Regions of Interest and matching those regions, in addition to the description of their properties. Those operations play a significant role in decision making which is necessary for the next operations depending on the assigned task. In order to accomplish those tasks, various algorithms have been introduced throughout years. One of the most popular algorithms is the Scale Invariant Feature Transform (SIFT). The efficiency of this algorithm is its performance in the process of detection and property description, and that is due to the fact that
... Show More