0
Multipoint forming process is an engineering concept which means that the working surface of the punch and die is produced as hemispherical ends of individual active elements (called pins), where each pin can be independently, vertically displaced using a geometrically reconfigurable die. Several different products can be made without changing tools saved precious production time. Also, the manufacturing of very expensive rigid dies is reduced, and a lot of expenses are saved. But the most important aspects of using such types of equipment are the flexibility of the tooling. This paper presents an experimental investigation of the effect of three main parameters which are blank holder, rubber thickness and forming speed th
... Show MoreMulti-belled piles are piles with enlarged ends; these piles have one or further bells at the lower third part of the pile. These piles are suitable for many soils with problems such as softening clay, the variation of groundwater table, expansive soils, black cotton soil, and loose sand. The current study reviewed the behavior of belled piles in multi-layer soils subjected to axial compression and pullout loading. The review covered the experimental and theoretical works on belled piles in multi-layered soils. These piles were subjected to static and dynamic loadings in compression and pullout cases. Most theoretical results focused on software such as PLAXIS 3D. The axial load applied on the piles comes from the upper
... Show MoreThe main target of this paper is to determine the optimum time for preventive maintenance on machines. Tow methods has been implemented estimating the optimum time duration for preventive maintenance . the first techniques use scheduling depending on data concerning the machine maintenance cost and halted cost from the production reach to the optimum time for maintenance which reflect the minimum cost. Where as the second techniques depends on reability function to estimate the optimum duration time which reflect the minimum cost. The tow techniques above by which we count on in fixing the preventive maintenance both give same result . we also prove that the scheduling method best than the reability function .
The process of identifying the region is not an easy process when compared with other operations within the attribute or similarity. It is also not difficult if the process of identifying the region is based on the standard and standard indicators in its calculation. The latter requires the availability of numerical and relative data for the data of each case Any indicator or measure is included in the legal process
This research discusses the rehabilitation of heritage markets in the historical centers of Islamic Arab cities and their use in the field of cultural tourism as one of the most important tourist attractions and the subsequent revival of the national economy in addition to preserving the urban heritage as these markets part of the historical centers of cities. The research also discusses the preservation of the continuity of heritage markets as a product of cultural heritage value within an integrated framework to preserve the urban heritage in the historic centers of cities. The study then reviews a number of experiences of Arab and Islamic countries in the field of preserving and rehabilitating heritage markets, which qualify them to b
... Show MoreCarbon nanotubes were prepared by an arc-discharge method,
under different values of pressure of oxygen gas. The structure of
multi-walled carbon nanotubes powders has been characterized by
low-angle X-ray diffraction .The morphology of carbon nanotube
powder was examined by transmission electron microscope. The
capacitance-voltage and current- voltage (dark and illumination
current) characterization were measured under different values of
pressure (10-3, 10-4, 10-5) mbar of oxygen gas