Background: Poly-ether-ether-ketone(PEEK) has been introduced to many dental fields. Recently it was tested as a retainer wire‎ following orthodontic treatment. This study aimed to investigate the effect of changing the bonding spot size and location on the performance of PEEK retainer wires. Methods: A biomechanical study involving four three-dimensional finite element models was performed. The basic model was with a 0.8 mm cylindrical cross-section PEEK wire, bonded at the center of the lingual surface of the mandibular incisors with 4 mm in diameter composite spots. Two other models were designed with 3 mm and 5 mm composite sizes. The last model was created with the composite bonding spot of the canine away from the center of the crown, closer to the lateral incisor. The linear displacement of the teeth, strains of the periodontal ligament, and stresses in PEEK wire and composite were evaluated. The data was numerically produced with color coded display by the software. Selected values were tabulated and compared among models. Results: The amount of linear displacement and strain was very low. Stresses in the wire and composite were affected by the size and position of the composite bonding spot. The safe limits were identified at 235 MPa for PEEK and 100 MPa for composite. The basic model had a von Mises stress in the PEEK wire of 122.09 MPa, and a maximum principal stress in the composite of 99.779 MPa. Both stresses were within the safe limits, which means a lower risk of failure in PEEK and composite. All other models had stresses that exceeded the safe limit of the composite. The 3 mm composite model was the only one that developed stresses in the wire more than the safe limits of PEEK. Conclusions: Within the limitations of this study, bonding PEEK wires with 4 mm bonding spots to the clinical crown center provided the best mechanical performance of the wires and spots; otherwise, the mechanical properties of the wire and composite would be affected and, therefore, might affect the retention process. Keywords: Retention, PEEK, Finite element analysis
Background: e cerebellum is divided into two hemispheres and contains a narrow midline zone called thevermis. A set of large folds are conventionally used to divide the overall structure into ten smaller "lobules". evermis receives fibres from the trunk and proximal portions of limbs, But the question is that does the cerebellum have the same measurementvalues in males and females of the same age?Material and method: e present study used 80 sectional brain MRI images (40: males, 40: females); 35-50 years old as indices of size for thevermian structures of the Cerebellum. is middle age group was taken because as known generally it could be neither an age of growth as inthe young nor of atrophy as in old individuals. e aim rega
... Show MoreThe effect of irradiation and exposure time of laser light on the fluorescence emission of DCM dye in PMMA polymer contained in the composition mold using different metals have been investigated. It was found that the fluorescence intensity decreases as the exposure time increases and then reaches stabilization at long times. The effect of the incident laser power on fluorescence intensity of DCM dye in PMMA polymer at 10-3 M and 20% mixing ratio, using copper disks of composition molds, has been studied too. It was observed that there is an upward knick in the curve at laser intensity of 19.2 W/cm2, which may be associated with the threshold for amplified spontaneous emission (ASE) or laser action. And at intensity higher than about 88.
... Show MoreThis study relates to synthesis of bentonite-supported iron/copper nanoparticles through the biosynthesis method using eucalyptus plant leaf extract, which were then named E-Fe/Cu@B-NPs. The synthesised E-Fe/Cu@B-NPs were examined by a set of experiments involving a heterogeneous Fenton-like process that removed direct blue 15 (DB15) dye from wastewater. The resultant E-Fe/Cu@B-NPs were characterised by scanning electron microscopy, Brunauer–Emmet–Teller analysis, zeta potential analysis, Fourier transform infrared spectroscopy and atomic force microscopy. The operating parameters in batch experiments were optimised using Box–Behnken design. These parameters were pH, hydrogen peroxide (H2O2
... Show MoreIn this work, optical system with different aperture shapes (circular, square, elliptical and triangle aperture) has been used for efficiency evaluation when the system involved moving factor in ideal case (aberration free). The optical system evaluate far moving object, therefore the image forming at image plane due to point spread function (image formula of incoherently illuminated point object). A mathematical treatment has been used to getting results by Gaussian numerical calculations method. The results show priority of circular aperture when optical system that submits of moving factor.
There is much research on the syntax-semantics and the syntax-phonology interaction. However, the exact relation between prosodic patterns and informational structure (as part of pragmatics) is still to be investigated. In this empirical study, we challenge the view that prosody and pragmatics are two autonomous levels of grammar. This paper is an analysis of the narrative poem ‘Mending Wall’ recited by Robert Frost to explore the prosodic features and the associated pragmatic meanings. It is proposed that a set of intentionally manipulated suprasegmental features form a prosodic grammar that works in line with syntax and lexical choices to build the narrative discourse and achieve pragmatic meanings. The paper shows that the am
... Show MoreIn this paper, a FPGA model of intelligent traffic light system with power saving was built. The intelligent traffic light system consists of sensors placed on the side's ends of the intersection to sense the presence or absence of vehicles. This system reduces the waiting time when the traffic light is red, through the transition from traffic light state to the other state, when the first state spends a lot of time, because there are no more vehicles. The proposed system is built using VHDL, simulated using Xilinx ISE 9.2i package, and implemented using Spartan-3A XC3S700A FPGA kit. Implementation and Simulation behavioral model results show that the proposed intelligent traffic light system model satisfies the specified operational req
... Show MoreIn this paper the effect of engagement length, number of teeth, amount of applied load, wave propagation time, number of cycles, and initial crack length on the principal stress distribution, velocity of crack propagation, and cyclic crack growth rate in a spline coupling subjected to cyclic torsional impact have been investigated analytically and experimentally. It was found that the stresses induced due to cyclic impact loading are higher than the stresses induced due to impact loading with high percentage depends on the number of cycles and total loading time. Also increasing the engagement length and the number of teeth reduces the principal stresses (40%) and
(25%) respectively for increasing the engagement length from (0.15 to 0
This study involves the design of 24 mixtures of fiber reinforced magnetic reactive powder concrete containing nano Silica. Tap water has been used in mixing 12 of these mixtures, while the other 12 have been mixed using magnetic water. Nano Silica (NS) with ratios (1, 1.5, 2, 2.5 and 3) % were used. The results showed that the mixture containing 2.5%NS gives the highest compressive strength at age 7 days. Many different other tests were carried out, the results showed that the fiber reinforced magnetic reactive powder concrete containing 2.5% NS (FRMRPCCNS) has the higher bulk density, dynamic modulus of elasticity, ultrasonic pulse velocity electrical resistivity and lesser absorption than fiber reinforced
... Show MoreThe main objective of resources management is to supply and support the site operation with necessary resources in a way to achieve the required timing in handing over the work as well as to achieve the cost-realism within the budget estimated. The research aims to know the advantage of using GIS in management of resources as one of the new tools that keep pace with the evolution in various countries around the world also collect the vast amount of spatial data resources in one environment easily to handled and accessed quickly and this help to make the right decision regarding management of resources in various construction projects. The process of using GIS in the management and identification of resources is of extreme importance in t
... Show More