Background: The displacement of artificial teeth during complete denture construction presents major processing errors in the occlusal vertical dimension which were verified at the previous trial denture stage. The aim of this study was to assess the effect of delay in processing after final flask closure and tension application on the vertical acrylic and porcelain teeth displacement of complete dentures constructed from heat cured acrylic and the results were compared with the conventional processing method. Materials and methods: forty samples of identical maxillary complete dentures were constructed from heat polymerized acrylic resin. These samples were subdivided into the following experimental subgroups in which each subgroup contains 5 samples for both acrylic and porcelain teeth and as follows: 1. Conventional flasking technique and immediate processing. 2. Conventional flasking technique and 6 hours delay in processing. 3. flasking technique with tension system and immediate processing. 4. flasking technique with tension system and 6 hours delay in processing. Reference metal pins were attached to the middle of the buccal surface of the upper right canine and center of the buccal groove of the left first molar. And according to these reference points on the teeth another metallic Reference pins were fixed on the denture vestibules and at a distance of 7.5mm by straight lines and 6.5mm where placed between the metal pins and the vestibules in order to standardize the measurement. The distance between the right and left metal pins on the canine and molars and the corresponding metal pins on the buccal vestibules were measured during the wax up stage and after processing by using an optical travelling microscope with an accuracy of 0.0005 mm. Means in (mm) were analyzed statistically by analysis of variance and the comparative T-test and least significance test (LSD). Results: Significant reduction in vertical displacement of the teeth occurred in groups when 6 hours delay in processing were applied, but a significant improvement was also observed in groups with tension system application when compared with control group. On the other hand, there were a high significant reduction in the vertical displacement in groups with tension system and 6 hours delay in processing combination. While for the type of artificial teeth data showed significant difference in the amount of vertical displacement of the teeth in groups with acrylic teeth when compared with porcelain teeth. Conclusions: The findings of this study showed that 6 hours delay in processing and tension system application were effective in reducing the vertical displacement of the artificial teeth during flasking. The maximum reduction in the displacement was observed in dentures constructed from acrylic teeth. On the other hand, significant decrease in vertical displacement of the teeth was detected in dentures constructed from porcelain teeth.
Bored piles settlement behavior under vertical loaded is the main factor that affects the design requirements of single or group of piles in soft soils. The estimation of bored pile settlement is a complicated problem because it depends upon many factors which may include ground conditions, validation of bored pile design method through testing and validation of theoretical or numerical prediction of the settlement value. In this study, a prototype single and bored pile group model of arrangement (1*1, 1*2 and 2*2) for total length to diameter ratios (L/D) is 13.33 and clear spacing three times of diameter, subjected to vertical axial loads. The bored piles model used for the test was 2000
... Show MoreIn this research, an organobentonite (HDTMA-BT) was prepared by modifying a jordanian bentonite (BT) with hexadecyltrimethylammonium bromide. By means of in situ free radical polymerization in THF with AIBN as the initiator, this organobentonite is used to prepare the polymethylmethacrylate-bentonite (PMA-HDTMA-BT) nanocomposite. Scanning electron microscopy (SEM), x-ray diffraction (XRD), energy dispersive spectrometer (EDS) and Fourier transform infrared (FTIR) spectroscopy were used to characterize both HDTMA-BT and PMA-HDTMA-BT. Those adsorbents were used in a batch process to remove Pb(II), Cr(III) ions, and p-chlorophenol (PCP) from aqueous solution. Investigated factors included adsorbent dosage, initial pH solution, contact time, an
... Show MoreThe introduction of Industry 4.0, to improve Internet of Things (IoT) standards, has sparked the creation of 5G, or highly sophisticated wireless networks. There are several barriers standing in the way of 5G green communication systems satisfying the expectations for faster networks, more user capacity, lower resource consumption, and cost‐effectiveness. 5G standards implementation would speed up data transmission and increase the reliability of connected devices for Industry 4.0 applications. The demand for intelligent healthcare systems has increased globally as a result of the introduction of the novel COVID‐19. Designing 5G communication systems presents research problems such as optimizing
The research aims to identify the most important difficulties facing the scientific research in the technical university in the financial, organizational and administrative according to the quality standards according to the paragraphs studied in the questionnaire questionnaire prepared for this purpose, including the research community on the Central Technical University, which includes several technical colleges and technical institutes were selected A sample of the researchers in the Institute of Technical Management where the number of training was 78 teachers took a random sample of researchers amounted to 40% of the questionnaire, and after the collection and classification of data were used statistical means, including the mean ar
... Show MoreIn this paper, a subspace identification method for bilinear systems is used . Wherein a " three-block " and " four-block " subspace algorithms are used. In this algorithms the input signal to the system does not have to be white . Simulation of these algorithms shows that the " four-block " gives fast convergence and the dimensions of the matrices involved are significantly smaller so that the computational complexity is lower as a comparison with " three-block " algorithm .
The objective of this work is to design and implement a cryptography system that enables the sender to send message through any channel (even if this channel is insecure) and the receiver to decrypt the received message without allowing any intruder to break the system and extracting the secret information. In this work, we implement an interaction between the feedforward neural network and the stream cipher, so the secret message will be encrypted by unsupervised neural network method in addition to the first encryption process which is performed by the stream cipher method. The security of any cipher system depends on the security of the related keys (that are used by the encryption and the decryption processes) and their corresponding le
... Show MorePulsatile drug delivery systems (PDDS) are developed to deliver drug according to circadian behavior of diseases. They deliver the drug at the right time, action and in the right amount, which provides more benefit than conventional dosages and increased patient compliance. The drug is released rapidly and completely as a pulse after a lag time. These systems are beneficial for drugs with chrono-pharmacological behavior, where nighttime dosing is required and for the drugs having a high first-pass effect and having specific site of absorption in the gastrointestinal tract. This article covers methods and marketed technologies that have been developed to achieve pulsatile delivery. Diseases wherein PDDS are promising include asthma, peptic u
... Show MoreThe aim was to design a MATLAB program to calculate the phreatic surface of the multi-well system and present the graphical shape of the water table drawdown induced by water extraction. Dupuit’s assumption is the base for representing the dewatering curve. The program will offer the volume of water to be extracted, the total number of wells, and the spacing between them as well as the expected settlement of soil surrounding the dewatering foundation pit. The dewatering well arrangement is required in execution works, and it needs more attention due to the settlement produced from increasing effective stress.