Background: The displacement of artificial teeth during complete denture construction presents major processing errors in the occlusal vertical dimension which were verified at the previous trial denture stage. The aim of this study was to assess the effect of delay in processing after final flask closure and tension application on the vertical acrylic and porcelain teeth displacement of complete dentures constructed from heat cured acrylic and the results were compared with the conventional processing method. Materials and methods: forty samples of identical maxillary complete dentures were constructed from heat polymerized acrylic resin. These samples were subdivided into the following experimental subgroups in which each subgroup contains 5 samples for both acrylic and porcelain teeth and as follows: 1. Conventional flasking technique and immediate processing. 2. Conventional flasking technique and 6 hours delay in processing. 3. flasking technique with tension system and immediate processing. 4. flasking technique with tension system and 6 hours delay in processing. Reference metal pins were attached to the middle of the buccal surface of the upper right canine and center of the buccal groove of the left first molar. And according to these reference points on the teeth another metallic Reference pins were fixed on the denture vestibules and at a distance of 7.5mm by straight lines and 6.5mm where placed between the metal pins and the vestibules in order to standardize the measurement. The distance between the right and left metal pins on the canine and molars and the corresponding metal pins on the buccal vestibules were measured during the wax up stage and after processing by using an optical travelling microscope with an accuracy of 0.0005 mm. Means in (mm) were analyzed statistically by analysis of variance and the comparative T-test and least significance test (LSD). Results: Significant reduction in vertical displacement of the teeth occurred in groups when 6 hours delay in processing were applied, but a significant improvement was also observed in groups with tension system application when compared with control group. On the other hand, there were a high significant reduction in the vertical displacement in groups with tension system and 6 hours delay in processing combination. While for the type of artificial teeth data showed significant difference in the amount of vertical displacement of the teeth in groups with acrylic teeth when compared with porcelain teeth. Conclusions: The findings of this study showed that 6 hours delay in processing and tension system application were effective in reducing the vertical displacement of the artificial teeth during flasking. The maximum reduction in the displacement was observed in dentures constructed from acrylic teeth. On the other hand, significant decrease in vertical displacement of the teeth was detected in dentures constructed from porcelain teeth.
The arrival of Russian President Vladimir Putin to power in the Russian Federation is an important factor in delineating a new approach to Russian policy towards regions that have great strategic importance affecting its national security. Therefore, NATO's progress eastward towards these regions prompts Russia to delineate a new strategy to confront this progress as well as preserving its control in the near neighboring regions represented by the countries of Eastern Europe, especially after the changes that occurred in those regions following the color revolutions that swept the region, such as the first application of this Russian policy in 2014, through the annexation of Crimea, and the latest military operations in Ukraine i
... Show MoreIt is proposed and studied a prey-predator system with a Holling type II functional response that merges predation fear with a predator-dependent prey's refuge. Understanding the impact of fear and refuge on the system's dynamic behavior is one of the objectives. All conceivable steady-states are investigated for their stability. The persistence condition of the system has been established. Local bifurcation analysis is performed in the Sotomayor sense. Extensive numerical simulation with varied parameters was used to explore the system's global dynamics. A limit cycle and a point attractor are the two types of attractors in the system. It's also interesting to note that the system exhibits bi-stability between these 2 types of attractors.
... Show MoreRenewable energy technology is growing fast especially photovoltaic (PV) system to move the conventional electricity generation and distribution towards smart grid. However, similar to monthly electricity bill, the PV energy producers can only monitor their energy PV generation once a month. Any malfuntion in PV system components may reduce the performance of the system without notice. Thus, developing a real-time monitoring system of PV production is very crucial for early detection. In addition, electricity consumption is also important to be monitored more frequently to increase energy savings awareness among consumers. Hardware based Internet-of-Thing (IoT) monitoring and control system is widely used. However, the implementation of
... Show MoreThe research aims at identify the role of the electronic trading system used in the Iraq stock exchange to promote trading activity for the stocks of listed companies in this market.
To prove the hypothesis of research, it was selected the main trading indicators for the market to be a main field in test the research hypothesis.it was selected as the period of time for (9)years span between the years (2005-2013) because they represent the first two articles of equal time periods represent aperiod that preceded the introduction of electronic trading system while the second represents the period of time that followed
The research found a number of conclusions but the mo
... Show MoreThis research is considered one of the important researches in Maysan Governorate, as it focuses on the construction of helicopter airport project in the oil fields of the Maysan Oil Company, where the oil general companies in Maysan Governorate suffer from the cost of transporting the foreign engineering experts and the governing equipment of sustaining oil industry from Iraq's international airports to oil fields and vice versa. Private international transport companies transport foreign engineering from the oil fields to Iraqi airports and vice versa, and other international security companies take action to provide protection for foreign engineering experts during transportation. Hence, this process is very costly.
&nbs
... Show MoreThermal energy storage is an important component in energy units to decrease the gap between energy supply and demand. Free convection and the locations of the tubes carrying the heat-transfer fluid (HTF) have a significant influence on both the energy discharging potential and the buoyancy effect during the solidification mode. In the present study, the impact of the tube position was examined during the discharging process. Liquid-fraction evolution and energy removal rate with thermo-fluid contour profiles were used to examine the performance of the unit. Heat exchanger tubes are proposed with different numbers and positions in the unit for various cases including uniform and non-uniform tubes distribution. The results show that
... Show MoreEmpirical equations for estimating thickening time and compressive strength of bentonitic - class "G" cement slurries were derived as a function of water to cement ratio and apparent viscosity (for any ratios). How the presence of such an equations easily extract the thickening time and compressive strength values of the oil field saves time without reference to the untreated control laboratory tests such as pressurized consistometer for thickening time test and Hydraulic Cement Mortars including water bath ( 24 hours ) for compressive strength test those may have more than one day.
Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w