Preferred Language
Articles
/
injns-156
Construction of the School Physical Environment Standardized Features Tool
...Show More Authors

Objective: A descriptive design, using the methodological approach, is carried throughout the present
study from April 1st 2012 to May 20th 2013 to construct the school physical environment standardized
features tool.
Methodology: An instrument of (141) item is constructed for the purpose of the study. A purposive
sample of (44) school; (22) public and (22) private ones is selected. Content Validity of the instrument is
determined through the use of panel of (11) expert who are specialists in Community Health Nursing and
Community Medicine. Internal consistency reliability, using the split-half technique, is employed through
the computation of Cronbach alpha correlation coefficient of (0.93) for internal scale. Data were collected
through the use of the instrument and the schools' visits as means of data collection. Data are analyzed
through the application of the inferential statistical data analysis procedure of simple Pearson’s
correlation coefficient and factor analysis (principle component) method.
Results: Findings of the study reveal that the features are presented, post their rearrangement, under five
factors that include school services, emergency and school sanitation, food and protection services, safe
school environment, and school environment. So, the new tool can be structured, tested and used as
guide for new investigations. Such presentation of factors reflects the actual model by which the school's
physical environment features can be considered as essential elements for future evaluation through the
utilization of the constructed tool.
Recommendations: The study recommends that the new discovered tool can be used as measure for
future work, and further studies can be carried out on large sample size and nation-wide base.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 07 2022
Journal Name
Innovative Infrastructure Solutions
Evaluation of construction and demolition waste recycling sites within Iraq
...Show More Authors

View Publication
Crossref (4)
Clarivate Crossref
Publication Date
Fri Oct 17 2025
Journal Name
International Journal Of Construction Management
Enhancing employee retention in construction: role of workforce sustainability attributes
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Fri Dec 01 2023
Journal Name
Political Sciences Journal
Nation-Building in The Fragile States: Iraq After 2003 as a Model
...Show More Authors

The nation-building process in fragile states is complex, often involving multifaceted challenges and opportunities. A pertinent example is Iraq post-2003, which serves as a model to study the intricacies of rebuilding a nation in the aftermath of conflict. During this period, we witnessed a significant international intervention aimed at establishing democratic governance, fostering economic development, and restoring social stability. Iraq’s nation-building journey showcases both successes and shortcomings. Establishing a representative government marked a step towards inclusivity and political participation, yet sectarian tensions persisted, hindering cohesive national identity. Economic initiatives aimed to harness Iraq's oil resou

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jun 10 2021
Journal Name
Engineering, Technology & Applied Science Research
Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Professional Safety
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Sun Jun 12 2011
Journal Name
Baghdad Science Journal
Parabolic Trough Solar Collector – Design, Construction and Testing
...Show More Authors

This paper presents the design, construction and investigates an experimental study of a parabolic Trough Solar Collector (PTSC). It is constructed of multi – piece glass mirror to form the parabolic reflector (1.8 m ? 2.8 m) its form were checked with help of a laser and carbon steel rectangular as receiver. Sun tracker has been developed (using two – axis) to track solar PTSC according to the direction of beam propagation of solar radiation. Using synthetic oil as a heat transfer its capability to heat transfer and load high temperature (?400 oc). The storage tank is fabricated with stainless steel of size 50 L. The experimental tests have been carried out in Baghdad climatic conditions (33.3o N, 44.4o E) during selective days of the

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri May 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Utilizing Emerging Technologies for Construction Safety Risk Mitigation
...Show More Authors

View Publication
Scopus (120)
Crossref (101)
Scopus Clarivate Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Engineering
Intelligence in Construction between Contemporary and Traditional Architecture
...Show More Authors

The authentic traditional architecture proved that it is very convenient to the environmental and social regulations where it appeared and lasted for hundred of years.

This traditional architecture got the intelligence in providing thermal comfort for their occupants by the intelligent usage of the building materials and the intelligent planning and designs which took in consideration the climatic condition and the aerodynamics of the whole city as one ecological system starting from the cold breeze passing through its narrow streets till it enters the dwelling units and glides out through the wind catchers.

This architecture had been neglected and replaced by modern imported architecture which had collap

... Show More
View Publication Preview PDF