In the present study, a powder mixture of elements Ti and Ni was mechanically alloyed in a high energy ball mill. Microstructure of the nanosized amorphous milled product in different stages of milling has been characterized by X- ray diffraction, scanning electron microscopy and differential thermal analysis. We found that time of mechanical alloying is more significant to convert all crystalline structure to the amorphous phase. Nanocrystalline phase was achieved as a result of the mechanical alloying process. The results also indicates that the phase transformation and the grain size occurs in these alloys are controlled by ball milling time
The upbringing of Yehuda Amichai and the conditions he lived in had a great influence on his deep sense of pain, which made him think of death and suicide. Especially after the Nazis came to power in Germany, and his emigration with his family. Amichai searched for love throughout his life, and his failure was one of the most important factors affecting his psyche, which is A deep influence that made him live in harsh and painful pains that broke him, and prevented her from achieving his ambitions in life.Dramatic texts are characterized by repetition in writing and presentation. It is a textual discourse that has two advantages, first, that it can be read as a literary text like all other literary texts, and second, that it can be consider
... Show MoreThis study uses load factor and loss factor to determine the power losses of the electrical feeders. An approach is presented to calculate the power losses in the distribution system. The feeder’s technical data and daily operation recorded data are used to calculate and analyze power losses.
This paper presents more realistic method for calculating the power losses based on load and loss factors instead of the traditional methods of calculating the power losses that uses the RMS value of the load current which not consider the load varying with respect to the time. Eight 11kV feeders are taken as a case study for our work to calculate load factor, loss factor and power losses. Four of them (F40, F42, F43 and F
... Show More
his project try to explain the using ability of spatial techniques for land cover change detection on regional level with the time parameter and did select for explain these abilities study case (Hewaizah marsh ) . this area apply to many big changes with the time. These changes made action on characters and behaviors of this area as well as all activities in it . This Project concerting to recognize the Using importance of remote sensing and GIS Methodology in data collecting for the changes of land use and the methodology for the analyses and getting the results for the next using as a base data for development and drawing the plans as well as in regional planning .This project focus on practical
... Show MoreBackground: Bacterial DNA released upon bacterial autolysis or killed by antibiotics, hence, many inflammatogenic reactions will be established leading to serious tissue damage. Aim: the present work aimed to elucidate the histopathological changes caused by prokaryotic (bacterial) DNA and eukaryotic (candidal) DNA. Materials and methods: twenty one Staphylococcus aureus and 36 Candida albicans isolates were isolated from UTI patients. Viable cells and DNA of the highest antibiotic sensitive isolates were injected, intraurethraly, in mice. Results were evaluated via histopathological examination. Results: Mildest reactions were obtained from mice challenged with viable C. albicans compared with those challenged with viable S. aureus. Dos
... Show MorePower switches require snubbing networks for driving single – phase industrial heaters. Designing these networks, for controlling the maximum allowable rate of rise of anode current (di/dt) and excessive anode – cathode voltage rise (dv/dt) of power switching devices as thyristors and Triacs, is usually achieved using conventional methods like Time Constant Method (TCM), resonance Method (RM), and Runge-Kutta Method (RKM). In this paper an alternative design methodology using Fuzzy Logic Method (FLM) is proposed for designing the snubber network to control the voltage and current changes. Results of FLM, with fewer rules requirements, show the close similarity with those of conventional design methods in such a network of a Triac drivin
... Show MoreInundation floodingmap aimedto find outearly warningsto avoidenvironmental damageandhumanin terms of theheight ofthe wave ofwater, speed time arrival, effects of inundation sideanddepth of the water/ distanceand reduce the impact of the flood wave after obtaining the process of collapse of the dam in the lower part of the river to the dam area. The study has been using a numerical model one-dimensional depends on the development of equations (Saint-Venant) so that parts of the river, any river channel main banks of the right and left treated as separate parts, that’s the difference in the characteristics of the hydraulic and engineering, along the line of the flow will take into account in each section of the sections and flow in the riv
... Show More
In this work, the modified Lyapunov-Schmidt reduction is used to find a nonlinear Ritz approximation of Fredholm functional defined by the nonhomogeneous Camassa-Holm equation and Benjamin-Bona-Mahony. We introduced the modified Lyapunov-Schmidt reduction for nonhomogeneous problems when the dimension of the null space is equal to two. The nonlinear Ritz approximation for the nonhomogeneous Camassa-Holm equation has been found as a function of codimension twenty-four.
Enhancement of heat transfer in the tube heat exchanger is studied experimentally by using discrete twisted tapes. Three different positions were selected for inserting turbulators along tube section (horizontal position by α= 00, inclined position by α= 45 0 and vertical position by α= 900). The space between turbulators was fixed by distributing 5 pieces of these turbulators with pitch ratio PR = (0.44). Also, the factor of constant heat flux was applied as a boundary condition around the tube test section for all experiments of this investigation, while the flow rates were selected as a variable factor (Reynolds number values vary from 5000 to 15000). The results s
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent