Steganography art is a technique for hiding information where the unsuspicious cover signal carrying the secret information. Good steganography technique must be includes the important criterions robustness, security, imperceptibility and capacity. The improving each one of these criterions is affects on the others, because of these criterions are overlapped each other. In this work, a good high capacity audio steganography safely method has been proposed based on LSB random replacing of encrypted cover with encrypted message bits at random positions. The research also included a capacity studying for the audio file, speech or music, by safely manner to carrying secret images, so it is difficult for unauthorized persons to suspect presence of hidden image. Measures calculations of SNR, SNR segmental, SNR spectral, MSE and correlation show that, audio music cover file (2channales) is the safest uses as arrier with replace the 9 number of LSB without noticeable noise. Bits of secret message can be hiding capacity reach up to 28 % of the total music cover audio size and the three type's measures of SNR are 32, 28 and 31 dB. For speech cover audio the replacing LSB is safely uses at LSB bits number 6, where the hiding capacity is reach up to 37 % of size speech cover audio at 37, 36 and 39 dB for three type's measures of SNR. Correlation of cover samples was did not effected as a result of hiding secret image, where its value is up to 0.99 for all hiding operations.
In this study, the response and behavior of machine foundations resting on dry and saturated sand was investigated experimentally. A physical model was manufactured to simulate steady state harmonic load applied on a footing resting on sandy soil at different operating frequencies. Total of (84) physical models were performed. The parameters that were taken into consideration include loading frequency, size of footing and different soil conditions. The footing parameters are related to the size of the rectangular footing and depth of embedment. Two sizes of rectangular steel model footing were used. The footings were tested by changing all parameters at the surface and at 50 mm depth below model surface. Meanwhile, the investigated paramete
... Show MoreA total of 247 specimens of the Mallard were collected from Baghdad city and kut City and 154 specimens the collection was started from October1999
Iraq has a huge network of pipelines, transport crude oil and final hydrocarbon products as well as portable water. These networks are exposed to extensive damage due to the underground corrosion processes unless suitable protection techniques are used. In this paper we collect the information of cathodic protection for pipeline in practical fields (Oil Group in Al Doura), to obtain data base to understand and optimize the design which is made by simulation for the environmental factors and cathodic protection variables also soil resistivity using wenner four terminal methods for survey sites; and soil pH investigations were recorded for these selected fields were within 7-8, and recording the anodes voltage and its related currents for
... Show MoreStick-slip is kind of vibration which associated with drilling operation in around the bottom hole assembly (BHA) due to the small clearance between drill string & the open hole and due to the eccentric rotating of string. This research presents results of specific experimental study that was run by using two types of drilling mud (Fresh water Bentonite & Polymer), with/without Nanoparticle size materials of MgO in various ratios and computes the rheological properties of mud for each concentration [Yield point, plastic viscosity, Av, PH, filter loss (30 min), filter cake, Mud Cake Friction, Friction Factor]. These results then were used to find a clear effects of Nanoparticle drilling mud rheology on stick - slip strength by sev
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show More