DEMs, thus, simply regular grids of elevation measurements over the land surface.The aim of the present work is to produce high resolution DEM for certain investigated region (i.e. Baghdad University Campus\ college of science). The easting and northing of 90 locations, including the ground-base and buildings of the studied area, have been obtained by field survey using global positioning system (GPS). The image of the investigated area has been extracted from Quick-Bird satellite sensor (with spatial resolution of 0.6 m). It has been geo-referenced and rectified using 1st order polynomial transformation. many interpolation methods have been used to estimate the elevation such as ordinary Kriging, inverse distance weighted (IDW) and natural neighbor methods. The mosaic algorithm has then been applied between the base and building layers of studied area in order to perform the final DEM. The accuracy assessments of the interpolation methods have been calculated using the root-mean-square-error (RMSE) criterion. Finally, the estimated DEMs have been used to constructing 3-D views of the original image.
Abstract:
This research aims to identify the impact of the Layout Ghazi al-Hariri hospital for surgery specialist on customer satisfaction (patients) using the model (Servicescape), the problem of the research represented in the extent to which the hospital management design of the service and Layout hospital aesthetic and functional aspects that fit patients for therapeutic and nursing services , and used the developer scale by (Miles et al., 2012) for data collection, which includes the independent variable in (17) items distributed in three dimensions (Facility aesthetics , hospital cleanliness, and the Layout accessibility ) The dependent variable is the satisfaction of customers (pat
... Show MoreIn this work, radius of shock wave of plasma plume (R) and speed of plasma (U) have been calculated theoretically using Matlab program.
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
It is considered as one of the statistical methods used to describe and estimate the relationship between randomness (Y) and explanatory variables (X). The second is the homogeneity of the variance, in which the dependent variable is a binary response takes two values (One when a specific event occurred and zero when that event did not happen) such as (injured and uninjured, married and unmarried) and that a large number of explanatory variables led to the emergence of the problem of linear multiplicity that makes the estimates inaccurate, and the method of greatest possibility and the method of declination of the letter was used in estimating A double-response logistic regression model by adopting the Jackna
... Show MoreOften phenomena suffer from disturbances in their data as well as the difficulty of formulation, especially with a lack of clarity in the response, or the large number of essential differences plaguing the experimental units that have been taking this data from them. Thus emerged the need to include an estimation method implicit rating of these experimental units using the method of discrimination or create blocks for each item of these experimental units in the hope of controlling their responses and make it more homogeneous. Because of the development in the field of computers and taking the principle of the integration of sciences it has been found that modern algorithms used in the field of Computer Science genetic algorithm or ant colo
... Show More
It is considered as one of the statistical methods used to describe and estimate the relationship between randomness (Y) and explanatory variables (X). The second is the homogeneity of the variance, in which the dependent variable is a binary response takes two values (One when a specific event occurred and zero when that event did not happen) such as (injured and uninjured, married and unmarried) and that a large number of explanatory variables led to the emergence of the problem of linear multiplicity that makes the estimates inaccurate, and the method of greatest possibility and the method of declination of the letter was used in estimating A double-response logistic regression model by adopting the Jackna
... Show MoreThe present study deals with the effect of self -observation on EFL University students` achievement in conversation classes. The process of self-observation helps the teacher to understand one’s own actions and the reactions in the process of teaching. The sample of this study is EFL students in the third stage at the Department of English Language, morning studies, College of Education /Ibn-Rushd .The sample of the study consists of (84) students distributed on experimental group(A) includes (42) students, and (42) students as control group(B). In order to achieve the aim of the study ,and to gain a closer idea about the impact of reflective teaching technique(self-observation) on the students achievement in conversation classes, a chec
... Show More