The experimental proton resonance data for the reaction P+48Ti have been used to calculate and evaluate the level density by employed the Gaussian Orthogonal Ensemble, GOE version of RMT, Constant Temperature, CT and Back Shifted Fermi Gas, BSFG models at certain spin-parity and at different proton energies. The results of GOE model are found in agreement with other, while the level density calculated using the BSFG Model showed less values with spin dependence more than parity, due the limitation in the parameters (level density parameter, a, Energy shift parameter, E1and spin cut off parameter, σc). Also, in the CT Model the level density results depend mainly on two parameters (T and ground state back shift energy, E0), which are approximately constant in their behavior with the proton energy compared with GOE model. The RMT estimation used to calculate the corrections of the incompleteness proton resonance measurement data by using two methods; the conventional analysis method, which depends on the resonance widths and the updated, developed, tested and applied a new analysis method, which depends mainly on the resonance spacings. The spacing analysis method is found much less sensitive to non-statistical phenomena than is the width analysis method. Where the analysis of a given data set via these two independent analysis methods indicated the increasing in the reliability of the determination of the missing fraction of levels, the observed fraction f between 0.87+0.13−0.11 – 0.68+0.12−0.12 for different spin-parity of this reaction and then the distinguishability in the level density calculations can be achieved. The modified Porter Thomas distribution along with the maximum likelihood function have been used to get the missing levels corrections for 5 proton resonance sequences in the present reaction. To estimate the present long-range correlations for pure sequence of levels the mean square of the deviation of the cumulative number of levels from a fitted straight line represented by the Dyson and Mehta Δ3 statistic has been employed for spin parity 12+, and calculated the <Δ3> against the cumulative number of proton levels.
Estimation of mechanical and physical rock properties is an essential issue in applications related to reservoir geomechanics. Carbonate rocks have complex depositional environments and digenetic processes which alter the rock mechanical properties to varying degrees even at a small distance. This study has been conducted on seventeen core plug samples that have been taken from different formations of carbonate reservoirs in the Fauqi oil field (Jeribe, Khasib, and Mishrif formations). While the rock mechanical and petrophysical properties have been measured in the laboratory including the unconfined compressive strength, Young's modulus, bulk density, porosity, compressional and shear -waves, well logs have been used to do a compar
... Show MoreThis study proposes a hybrid predictive maintenance framework that integrates the Kolmogorov-Arnold Network (KAN) with Short-Time Fourier Transform (STFT) for intelligent fault diagnosis in industrial rotating machinery. The method is designed to address challenges posed by non-linear and non-stationary vibration signals under varying operational conditions. Experimental validation using the FALEX multispecimen test bench demonstrated a high classification accuracy of 97.5%, outperforming traditional models such as SVM, Random Forest, and XGBoost. The approach maintained robust performance across dynamic load scenarios and noisy environments, with precision and recall exceeding 95%. Key contributions include a hardware-accelerated K
... Show MoreThis article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a
... Show MoreBackground: World Health Organization (WHO) and United Nation International Children Fund (UNICEF) developed a strategy known as Integrated Management of Childhood Illness (IMCI); which aims to reduce less than five years children morbidity and mortality in developing countries.
Objective: To assess the completion of the IMCI format status in primary health care centers, Baghdad.
Methods: A cross sectional study with analytic element was conducted during the period from 15th of January till 15th May 2016 in selected Primary health centers in Baghdad, Iraq. The sample consists of form of child files less than 2 months and form from 2
... Show MoreThe gas-lift method is crucial for maintaining oil production, particularly from an established field when the natural energy of the reservoirs is depleted. To maximize oil production, a major field's gas injection rate must be distributed as efficiently as possible across its gas-lift network system. Common gas-lift optimization techniques may lose their effectiveness and become unable to replicate the gas-lift optimum in a large network system due to problems with multi-objective, multi-constrained & restricted gas injection rate distribution. The main objective of the research is to determine the possibility of using the genetic algorithm (GA) technique to achieve the optimum distribution for the continuous gas-lift injectio
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
The logistic regression model of the most important regression models a non-linear which aim getting estimators have a high of efficiency, taking character more advanced in the process of statistical analysis for being a models appropriate form of Binary Data.
Among the problems that appear as a result of the use of some statistical methods I
... Show MoreProtection of the oil pipelineswhich extracted from the wells was found to shut the well and prevent the leakage of oil when broken using safety valve. This valve is automatically activated by loss of pressure between the well and pipelines, which take the pressure, signal from hydraulic pressure sensor through pressure control valve which has constant or variable value but it is regulated manually. The manual regulatory process requires the presence of monitoring workers continuously near the wells which are always found in remote areas. In this paper, a smart system has been proposed that work with proportional pressure control valve and also electronic pressure sensor through Arduino controller, which is programmed in a way that satisfie
... Show More