After the year 2003 terrorist attacks knock Baghdad city capital of Iraq using bomb explosion various, shook the nation, and made public resident of Baghdad aware of the need for better ways to protect occupants, assets, and buildings cause the terrorist gangs adopt style burst of blast to injury vulnerability a wider range form, and many structures will suffer damage from air blast when the overpressure concomitant the blast wave, (i.e., the excess over the atmospheric pressure 14.7 pounds per square inch at standard sea level conditions are about one-half pound per square inch or more(
to attainment injury. Then, the distance to which this overpressure level will extend depends primarily on the energy yield (§1.20) of the burst of blast. Accordingly, must been have adopted a changing philosophy to provide appropriate and effective protection for preservation of psyche and building occupants, by establishment of a protected perimeter and the design of a debris mitigating facade, the isolation of internal explosive threats that may to dodge detection through the screening stations or may enter the public spaces prior to screening and the protection of the emergency evacuation, rescue and recovery systems. By reason of this above-mentioned, the study simple contribution of determined phenomena risk containment. Moreover, in this study may be applied remote sensing (RS) and geographic information system (GIS) techniques to estimation the blast wave overpressure of bomb explosive effecters for damage that building of materials (i.e., facade, building glass, secondary of roof, fashioning tools and furniture), and how avoid this problem, therefore, selection justice ministry of Iraq building in Salehyiea region at Baghdad city, it destroyed at 28/10/2009 by motocar bombs explosion.
Net pay is one of the most important parameters used in determining initial oil in place of a reservoir. It can be delineated through the using of limiting values of the petrophysical properties of the reservoir. Those limiting values are named as the cutoff. This paper provides an insight into the application of regression line method in estimating porosity, clay volume and water saturation cutoff values in Mishrif reservoir/ Missan oil fields. The study included 29 wells distributed in seven oilfields of Halfaya, Buzurgan, Dujaila, Noor, Fauqi, Amara and Kumait.
This study is carried out by applying two types of linear regressions: Least square and Reduce Major Axis Regression.
The Mishrif formation was
... Show MoreZinc oxide (ZnO) nanostructures were synthesized through the hydrothermal method at various conditions growth times (6,7 and 8 hrs.) and a growth temperature (70, 90, and 100 ºC). The prepared ZnO nanostructure samples were described using scanning electron microscopy (SEM) and X-ray diffractometer to distinguish their surface morphologies and crystal structures. The ZnO samples were confirmed to have the same crystal type, with different densities and dimensions (diameter and length). The obtained ZnO nanostructures were used to manufacture gas sensors for NO2 gas detection. Sensing characteristics for the fabricated sensor to NO2 gas were examined at different operating temperatures (180, 200, 220, and 240) ºC with a low gas concentrati
... Show MoreThis study was carried out in order to determine the toxic, mutagenic and antimutagenic effects for Mallow (Malva parviflora) in comparison to its mutagenic effect of Ultraviolet (UV) because it is consider physical mutagen by using parameters for the extract pri , with , post UV exposure by using bacterial system (G-system). The used system consisted of three isolates G3 Bacillus spp., G12 Arthrobacter spp. and G27 Brevibacterium spp.. The study depended on recording survival fraction (Sx) for studying the effects and induction of Streptomycin and Refampicin resistance mutants as a genetic markers.Water Extract was prepared from fresh and dry mallow leaves, stems, flowers and roots, in optimum concentration equal to (125µg/ml) which is
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show MoreA low-cost reverse flow plasma system powered by argon gas pumping was built using homemade materials in this paper. The length of the resulting arc change was directly proportional to the flow rate, while using the thermal camera to examine the thermal intensity distribution and demonstrating that it is concentrated in the centre, away from the walls at various flow rates, the resulting arc's spectra were also measured. The results show that as the gas flow rate increased, so did the ambient temperature. The results show that the medium containing the arc has a maximum temperature of 34.1 ˚C at a flow rate of 14 L/min and a minimum temperature of 22.6 ˚C at a flow rate of 6 L/min.
Clean water supply is one of the major factors contributing significantly to society’s socio-economic transformation by improving living standards, health, and increasing productivity. It is imperative to plan and construct appropriate water supply systems in modern society, which supply various segments of society with safe drinking water according to their requirements to ensure adequate and quality water supply. In the current study, here was an attempt to develop a model for geographic information systems to manage the assets of the water distribution networks in the Karrada region and to evaluate the network geometrically, and from the results of the engineering analysis of the
Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.
According to the study's findings, the benefits include ensuring the most ef
... Show More